Skip to content
PlanIndex Get alerts
Menu

Planning application

49 Northlands Avenue, Orpington, BR6 9LU

Granted Bromley 21/02999/PLUD Lawful development: Proposed use

Works: Loft or dormer

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Proposed hip to gable loft conversion with rear box dormer with rooflights and a single rooflight to front LAWFUL DEVELOPMENT CERTIFICATE (PROPOSED)

As published by the council, reference 21/02999/PLUD

Application record

Reference
21/02999/PLUD
Type
Lawful development: Proposed use
Status
Decision Made
Decision
PROPOSED USE/DEVELOPMENT IS LAWFUL
Received
16 Jun 2021
Validated
16 Jun 2021
Decided
11 Aug 2021
Ward
Chelsfield
Decision by
Delegated Decision
Postcode
BR6 9LU

Site history

Applications at this address on the Bromley register

This site has had 2 applications since 2021: 2 approved, 0 refused.

  • 21/02997/FULL6 Granted

    49 Northlands Avenue, Orpington, BR6 9LU

    Removal of rear chimney stack and construction of a single storey rear extension with rooflights

    Decided 10 Aug 2021 Householder

Timeline

Dates from the published record

  1. 16 Jun 2021

    Received by Bromley

  2. 11 Aug 2021

    Decision issued: PROPOSED USE/DEVELOPMENT IS LAWFUL

  3. 3 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Bluelime LLP Agent

175 applications on PlanIndex · across 20 councils · 87% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Bromley granted permission on 11 August 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About lawful development applications

A lawful development certificate is a legal determination that existing or proposed works do not need planning permission; the merits of the scheme are not considered. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 49 Northlands Avenue, Orpington, BR6 9LU

    21/02997/FULL6 Submitted 16 Jun 2021 0m away

    Removal of rear chimney stack and construction of a single storey rear extension with rooflights

    Granted Householder Extension Loft or dormer 10 docs
    Small domestic
  • 78 BORKWOOD WAY, ORPINGTON, BR6 9PF

    26/01416/LDC Submitted 30 Mar 2026 78m away

    Construction of garden room to rear. LAWFUL DEVELOPMENT CERTIFICATE (PROPOSED)

    Granted Lawful development 3 docs
  • 61 NORTHLANDS AVENUE, ORPINGTON, BR6 9LU

    26/00524/LDC Submitted 10 Feb 2026 88m away

    Erection of a hip-to-gable rear dormer loft conversion and all associated works LAWFUL DEVELOPMENT CERTIFICATE (PROPOSED)

    Granted Lawful development Loft or dormer 8 docs
  • 51 St Leonards Rise, Orpington, BR6 9NA

    23/00692/FULL6 Submitted 21 Feb 2023 88m away

    Demolition of existing porch & installation of new single storey adjoining front porch extension

    Granted Householder Extension Demolition 10 docs
    Small domestic
  • 49 St Leonards Rise, Orpington, BR6 9NA

    23/00691/FULL6 Submitted 21 Feb 2023 92m away

    Demolition of existing porch & installation of new single storey adjoining front porch extension

    Granted Householder Extension Demolition 10 docs
    Small domestic
  • 38 Borkwood Way, Orpington, BR6 9PD

    23/00649/HHPA Submitted 17 Feb 2023 105m away

    Single storey rear extension, extending beyond the rear wall of the original house by 5.00m, for which the maximum height would be 2.27m, and for which the height of the eaves would be 3.80m (42 Day Notification for Householder Permitted Development Prior Approval

    Granted Prior approval Extension 6 docs
    Small domestic

In Bromley

  • 26/02494/LDC Granted

    76 HAYES LANE, HAYES, BROMLEY, BR2 9EE

    Proposed use of existing dwelling by a small religious community of up to 6 people living together as a single household [Class C3(c)] PROPOSED LAWFUL USE CERTIFICATE

    22 Jun 2026 Lawful development
  • 26/02884/LDC Granted

    10 CLAREVILLE ROAD, ORPINGTON, BR5 1RU

    Change existing integral garage to habitable room. Replace garage door with new window and brick up existing window. LAWFUL DEVELOPMENT CERTIFICATE FOR A PROPOSED CHANGE OF USE.

    16 Jul 2026 Lawful development
  • 26/02665/LDC Granted

    WEST WICKHAM CRICKET AND FOOTBALL CLUB, CORKSCREW HILL, WEST WICKHAM, BR4 9BB

    Internal refurbishment of West Wickham football club bar, kitchen, changing facilities and W.C's. LAWFUL DEVELOPMENT CERTIFICATE (PROPOSED)

    2 Jul 2026 Lawful development
  • 26/03546/LDC Awaiting decision

    43 RAVENSWOOD AVENUE, WEST WICKHAM, BR4 0PN

    Hip to gable loft conversion with rear dormer and front rooflights. Elevational alterations to rear. LAWFUL DEVELOPMENT CERTIFICATE (PROPOSED).

    9 Sep 2026 Lawful development
  • 26/03533/LDC Awaiting decision

    21 ADDINGTON ROAD, WEST WICKHAM, BR4 9BW

    Conversion of garage into a habitable space and elevational alterations. LAWFUL DEVELOPMENT CERTIFICATE (PROPOSED)

    9 Sep 2026 Lawful development