Skip to content
PlanIndex Get alerts
Menu

Planning application

75 Shortlands Road, Shortlands, Bromley, BR2 0JJ

Granted Bromley 21/02826/FULL6 Householder planning permission

Works: Extension Loft or dormer Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Single storey side extension with rooflights

As published by the council, reference 21/02826/FULL6

Application record

Reference
21/02826/FULL6
Type
Householder planning permission
Status
Decision Made
Decision
Granted As published: GRANTED
Received
7 Jun 2021
Validated
7 Jun 2021
Decided
10 Aug 2021
Ward
Shortlands & Park Langley
Decision by
Delegated Decision
Postcode
BR2 0JJ

Site history

Applications at this address on the Bromley register

This site has had 2 applications since 2021: 2 approved, 0 refused.

  • 21/02961/TREE Granted

    75 Shortlands Road, Shortlands, Bromley, BR2 0JJ

    T1 Ash on front left boundary - Section fell to ground level. T2 & T3 Leyland Cypress on front boundary - Section fell to ground level. T4 Oak adjacent to shed - Reduce lateral spread by 1m to reduce leverage and reduce height as appropriate to leave a rounded form. T5 Lombardy Poplar - Reduce in height by 6-7m.T6 Cobnut on front boundary behind shed - Reduce in height by 0.5m and reduce sides as appropriate to leave a rounded form.

    Decided 25 Aug 2021 Trees

Timeline

Dates from the published record

  1. 7 Jun 2021

    Received by Bromley

  2. 10 Aug 2021

    Decision issued: GRANTED

  3. 3 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Bromley granted permission on 10 August 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About householder applications

Householder applications cover work to an existing house and its garden, such as extensions, lofts and outbuildings, and cannot create a separate dwelling or change what the building is used for. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 112 Shortlands Road, Shortlands, Bromley, BR2 0JP

    18/03886/CONDIT Submitted 20 Jul 2021 100 yards away

    Details to discharge conditions relating to planning permission reference 18/03886/FULL6; Condition 2; External surfaces materials

    Decided Conditions 4 docs
  • 112 Shortlands Road, Shortlands, Bromley, BR2 0JP

    24/02558/FULL6 Submitted 5 Jul 2024 100 yards away

    Demolition of existing side/rear extension and erection of two storey front/side extension with solar panels in roof and single storey rear/side extension. Removal of existing garage/storage tent and construction of garage outbuilding.

    Granted Householder Extension Demolition 28 docs
    Small domestic
  • 72 SHORTLANDS ROAD, SHORTLANDS, BROMLEY, BR2 0JP

    25/04606/HPA Submitted 2 Oct 2025 100 yards away

    Rear gable roof extension, elevational alterations and rooflights in roof slopes

    Granted Householder Extension Loft or dormer 49 docs
    Domestic
  • 50-52 SHORTLANDS ROAD, SHORTLANDS, BROMLEY, BR2 0JP

    26/01938/FPA Submitted 14 May 2026 100 yards away

    Construction of fire escape with stairs and balustrade from first floor to ground floor.

    Granted Full applications 8 docs
  • 112 Shortlands Road, Shortlands, Bromley, BR2 0JP

    23/01099/TREE Submitted 21 Mar 2023 100 yards away

    T1 Monterey Cypress tree - Remove some branches to remove heavy deadwood from the crown and shorten branches growing towards neighbouring property by 1.5m.

    Granted Trees 2 docs
  • Rowland Court, 92 Shortlands Road, Shortlands, Bromley, BR2 0JP

    23/01571/TREE Submitted 24 Apr 2023 100 yards away

    T1 Ash tree with Ash die back and bracket Fungus - Fell to ground level.T2 Beech tree - Crown lift to clear 4m from ground level.T3 Oak tree - Crown lift to clear 4m from ground level.

    Granted Trees 2 docs

In Bromley

  • 26/02976/HPA Granted

    17 WICKHAM COURT ROAD, WEST WICKHAM, BR4 9LN

    Erection of single storey detached outbuilding in rear garden to replace existing.

    Received 23 Jul, published by the council 25 Jul 2026 Householder
  • 26/02693/HPA Refused

    8 PARK AVENUE, FARNBOROUGH, ORPINGTON, BR6 8LL

    Replace existing piers and wall to front with new piers and gates, green grid metal fencing and hedgerow planting

    Received 3 Jul, published by the council 25 Jul 2026 Householder
  • 26/03850/HPA Awaiting decision

    16 RAVENS DENE, CHISLEHURST, BR7 5FL

    Proposed garage conversion to habitable room, construction of loft extension including rear roof dormer and front roof lights and elevational alterations.

    Received 1 Oct, published by the council 6 Oct 2026 Householder
  • 26/03145/HPA Granted

    51 SWEEPS LANE, ORPINGTON, BR5 3PE

    Demolition of conservatory and construction of a single storey rear extension and elevational alterations

    Received 5 Aug, published by the council 11 Aug 2026 Householder
  • 26/02221/HPA Granted

    WINDY RIDGE, THE HILLSIDE, ORPINGTON, BR6 7SD

    Two storey side extension, comprising new roof over entire building with gables/dormers to front and back and rooflights to sides, elevational alterations, external landscaping works including extended garden terrace and steps.

    Received 2 Jun, published by the council 25 Jul 2026 Householder