Planning application
The Gravel Pit High Road Needham Norfolk
Withdrawn before a decision, so it carries no planning weight. A revised scheme can be submitted at any time.
Proposal
Retention of existing 930 kw ELBH biomass boiler, flue and associated equipment and existing 2.5 mw ELBH biomass boiler.
As published by the council, reference 2020/0701
Application record
- Reference
- 2020/0701
- Type
- Full
- Status
- Withdrawn
- Decision
- Withdrawn
- Received
- 9 Apr 2020
- Validated
- 9 Apr 2020
- Decided
- 13 Oct 2020
- Ward
- Harleston
- Parish
- Needham
- Decision by
- Delegated
Site history
Applications at this address on the Broadland register
This site has had 2 applications since 2020: 1 approved, 0 refused.
-
2021/0157 Granted
The Gravel Pit High Road Needham Norfolk
Retention of existing 930kw ELBH Biomass Boiler , flue and associated equipment, and proposed replacement 1.4mw danstoker multimiser M18 Biomass Boiler, flue and associated equipment.
Timeline
Dates from the published record
-
9 Apr 2020
Received by Broadland
-
13 Oct 2020
Decision issued: Withdrawn
-
17 Nov 2026
Added to PlanIndex
Documents
15 documents on file for this application
A planning file usually holds the application form, the consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWorking a patch? Trade sends you every new job in your area each morning. 14 days free.
What withdrawal means
The applicant withdrew this application before Broadland decided it, and is free to submit a revised scheme at any time. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
The Gravel Pit High Road Needham Norfolk
Retention of existing 930kw ELBH Biomass Boiler , flue and associated equipment, and proposed replacement 1.4mw danstoker multimiser M18 Biomass Boiler, flue and associated equipment.
Granted Full applications 17 docs -
The Gravel Pit High Road Needham Norfolk
Retention of existing 930kw ELBH Biomass Boiler , flue and associated equipment, and proposed replacement 1.4mw danstoker multimiser M18 Biomass Boiler, flue and associated equipment.
Granted Full applications 17 docs -
Land West Of 16 High Road Needham Norfolk
57% historically approved · decision due ~8 May
Outline planning permission for 11 no. dwellings
Awaiting decision Outline 40 docsMajor scheme -
Land West Of 16 High Road Needham Norfolk
53% historically approved · decision due ~8 May
Outline planning permission for 11 no. dwellings
Awaiting decision Outline 40 docsMajor scheme -
41 High Road Needham Harleston Norfolk IP20 9LB
Erection of two single storey extensions
Granted Householder Extension 4 docsSmall domestic -
41 High Road Needham Harleston Norfolk IP20 9LB
Erection of two single storey extensions
Granted Householder Extension 4 docsSmall domestic
Other full applications
In Broadland
-
2026/0402 Refused
Rembrandt Restaurant 61 - 65 Dereham Road Easton Norfolk NR9 5EH
Demolition and erection of mixed use development comprising retail store and 5 no. apartments, provision of parking, landscaping, site access and other associated works
-
2026/2320 Granted
Norwich Family Golf Centre Dunham Road Easton Norfolk NR9 5GA
Provision of additional golf driving bays as an extension wing to the western end of existing building. Single storey construction to match appearance of adjacent existing wings
-
2026/3376 Awaiting decision
Unit K Abbey Farm Commercial Park Southwell Road Horsham St Faith Norfolk NR10 3JU
Change of Use of Unit K from Class E(g)(ii) to Classes E(g), B2 and B8
-
2026/0364 Withdrawn
Fir Grove Hethel Road Wreningham Norfolk NR16 1BE
Construction of new self-build dwelling following demolition of agricultural building
-
2025/1031 Granted
Grove View Frettenham Road Horstead With Stanninghall Norfolk NR12 7LB
Erection of timber cabin building and ancillary structures, siting of shepherd's hut, provision of solar panels and associated development (retrospective), including the use of the cabin for shooting events between 1 September and 1 February each year and for other leisure and countryside-based events between 2 February and 31 August