Skip to content
PlanIndex Get alerts
Menu

Planning application

BH2025/02564

11 Craignair Avenue Brighton BN1 8UG

Granted Brighton and Hove Lawful Development Certificate Proposed

Proposal

Certificate of lawfulness for proposed loft conversion with hip to gable roof extension, rear dormer and 2no front rooflights.

As published by the council, reference BH2025/02564

Timeline

Dates from the published record

  1. 17 Oct 2025

    Received by Brighton and Hove

  2. 12 Dec 2025

    Decision issued: Approved

  3. 21 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About lawful development applications

How this application type works

A lawful development certificate is a legal determination, not a planning judgement. It asks the council to confirm either that existing use or works are lawful, often through the passage of time, or that a proposal would not need planning permission at all. The applicant must prove the facts; the merits of the scheme are not considered.

More on lawful development applications in our guide

Nearby applications

Within 500 metres

  • BH2025/02405 Granted

    20 Mackie Avenue Brighton BN1 8RA

    Erection of a single storey rear extension.

    29 Sep 2025 103m away Householder
  • BH2025/03017 Awaiting decision

    5 Sanyhils Avenue Brighton BN1 8UL

    Certificate of lawfulness for propsed roof alterations/extensions including hip to gable roof extension, rear dormer with juliette balcony and insertion of front rooflights.

    12 Dec 2025 200m away Lawful development
  • BH2026/00234 Awaiting decision

    65 Ladies Mile Road Brighton BN1 8TB

    Erection of 1no dwelling (C3) to rear of existing dwelling.

    3 Feb 2026 206m away Full applications
  • BH2025/02962 Awaiting decision

    27 Ladies Mile Road Brighton BN1 8QE

    Demolition of existing rear outdoor seating area and installation of a new rear outdoor seating area with a powder coated aluminium frame and retractable roof.

    5 Dec 2025 229m away Full applications
  • BH2026/00371 Awaiting decision

    27 Ladies Mile Road Brighton BN1 8QE

    Demolition of the existing front outdoor seating area and installation of a new front outdoor seating area with a powder coated aluminium frame and retractable roof.

    18 Feb 2026 229m away Full applications
  • BH2025/01929 Granted

    27 Ladies Mile Road Brighton BN1 8QE

    Installation of extraction system/duct to the rear of the property.

    5 Aug 2025 229m away Full applications

In Brighton and Hove

  • BH2026/00373 Awaiting decision

    245 Hangleton Road Hove BN3 7LR

    Certificate of lawfulness for proposed roof alterations/extensions including hip to gable extension with dormer to rear roofslope and rooflights to front roof slope.

    18 Feb 2026 Lawful development
  • BH2026/00349 Awaiting decision

    42 Tongdean Road Hove BN3 6QE

    Certificate of lawfulness for proposed erection of single storey side extension.

    16 Feb 2026 Lawful development
  • BH2026/00336 Awaiting decision

    13 Hythe Road Brighton BN1 6JR

    Certificate of lawfulness for proposed loft conversion incorporating rear dormer and 2no. front rooflights.

    13 Feb 2026 Lawful development
  • BH2025/03071 Granted

    18 Pinfold Close Brighton BN2 6WG

    Certificate of lawfulness for the proposed single storey rear extension.

    19 Dec 2025 Lawful development
  • BH2026/00328 Awaiting decision

    6 Goodwood Way Brighton BN2 4PW

    Certificate of Lawfulness for the proposed loft conversion, including hip-to-gable alteration and rear dormer extension, together with fenestration alterations to the side and rear elevations, installation of a rooflight to the front elevation, and solar panels to the rear elevation.

    12 Feb 2026 Lawful development