Planning application
BH2025/02228
Tennyson Court Sackville Road Hove BN3 3HZ
Proposal
Replacement of existing single glazed timber sash windows to double glazed timber sash windows. Replacement of existing rainwater goods.
As published by the council, reference BH2025/02228
Timeline
Dates from the published record
-
9 Sep 2025
Received by Brighton and Hove
-
11 Nov 2025
Validated
Checked as complete and ready for consideration.
-
23 Jan 2026
Decision issued: Approved
-
21 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
BH2025/02640 Awaiting decision
23 Byron Street Hove BN3 5BA
Change of use from residential dwelling (C3) to 4no bedroom small house in multiple occupation (C4).
-
BH2025/02393 Granted
58 Coleridge Street Hove BN3 5AD
Prior approval for the erection of a single storey rear extension, which would extend beyond the rear wall of the original house by 3.5m, for which the maximum height would be 3.5m, and for which the height of the eaves would be 2.5m.
-
BH2025/02616 Granted
Unit 5 Albert Works Conway Street Hove BN3 3LW
Prior Approval for change of use of part first floor from commercial, business and service (E) to residential (C3) to form 1no two bedroom flat.
-
BH2025/02797 Awaiting decision
52 Shakespeare Street Hove BN3 5AG
Erection of single storey rear extension and L shaped rear dormer over outrigger and insertion of front rooflights.
-
BH2025/02628 Granted
41 - 43 Portland Road Hove BN3 5DQ
Conversion of existing office building (E) to form 7no self-contained flats (C3) with alterations to include installation of front balconies, infilling of undercroft area to form habitable space, revised fenestration and cycle parking facilities.
-
BH2026/00011 Awaiting decision
Flat 3 55 Shirley Street Hove BN3 3WH
Roof alterations to include the installation of front rooflights and rear dormer.
Other full applications applications
In Brighton and Hove
-
BH2026/00371 Awaiting decision
27 Ladies Mile Road Brighton BN1 8QE
Demolition of the existing front outdoor seating area and installation of a new front outdoor seating area with a powder coated aluminium frame and retractable roof.
-
BH2026/00352 Awaiting decision
34 Robertson Road Brighton BN1 5NL
Conversion of a three-storey maisonette and lower ground-floor flat into a single dwelling house (C3). Erection of a single-storey side and rear extension.
-
BH2025/03046 Granted
35 Montpelier Crescent Brighton BN1 3JL
Replacement of external fire escape stairs to rear and replacement rear window to match existing.
-
BH2026/00339 Awaiting decision
First Floor Flat 55 Carlisle Road Hove BN3 4FQ
Roof alterations to include the installation of front rooflights and rear dormer.
-
BH2026/00319 Awaiting decision
98 Blatchington Road Hove BN3 3YF
Replacement of existing shopfront and entrance door with new aluminium shopfront and entrance door.