Planning application
BH2025/02113
6 Rutland Gardens Hove BN3 5PA
Proposal
Certificate of lawfulness for existing use as a single dwellinghouse (C3).
As published by the council, reference BH2025/02113
Timeline
Dates from the published record
-
27 Aug 2025
Received by Brighton and Hove
-
23 Oct 2025
Decision issued: Approved
-
21 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About lawful development applications
How this application type works
A lawful development certificate is a legal determination, not a planning judgement. It asks the council to confirm either that existing use or works are lawful, often through the passage of time, or that a proposal would not need planning permission at all. The applicant must prove the facts; the merits of the scheme are not considered.
Nearby applications
Within 500 metres
-
BH2026/00080 Awaiting decision
54 New Church Road Hove BN3 4FL
Group 2 - English elm - Re-Pollard all trees in group during winter 2025-2026. Pollarding is part of routine maintenance for these trees. T2 - English elm - Remove all deadwood T3 - English elm - Fell tree, circumference affected by Bjerkandera adusta at base. T4 - English elm - Re-Pollard all trees in group during winter 2025-2026. Pollarding is part of routine maintenance for these trees. T5 - English elm - Pollard tree to 5m from ground level T6 - English elm - Remove deadwood
-
BH2025/02460 Granted
80 Walsingham Road Hove BN3 4FF
Roof alterations including the erection of one rear dormer and 2no front rooflights. Erection of a rear extension and minor changes to fenestration throughout. Internal alterations. Conversion of garage into habitable space and installation of additional fenestration. Relocation of garden wall.
-
BH2025/02193 Granted
Brighton And Hove Jewish Community 29A New Church Road Hove BN3 4AD
Installation of sculpture to grounds at front of building.
-
BH2025/02623 Awaiting decision
79 Pembroke Crescent Hove BN3 5DF
Application to vary condition 1 of BH2025/00738 to amend approved drawings to relocate rear northern wall of porch, amend boarding and bargeboard design to replicate existing and swan neck scroll ridge tile to new porch.
-
BH2026/00296 Awaiting decision
Pembroke Manor 10 Pembroke Gardens Hove BN3 5DY
T1 Beech- Prune back to previous points. (approx 1.5m of re-growth . T2 Wild cherry- Fell REASON: To allow more light into beds for Beech. Regarding the Cherry, my client feels that they are too many trees in the garden and the lack of light is affecting her enjoyment of the underplanting.
-
BH2025/02115 Granted
73 Walsingham Road Hove BN3 4FE
T1 - Willow - Crown reduction of approximately 1.5 metres T2 - Olive - Crown reduction of 1 metre
Other lawful development applications
In Brighton and Hove
-
BH2026/00373 Awaiting decision
245 Hangleton Road Hove BN3 7LR
Certificate of lawfulness for proposed roof alterations/extensions including hip to gable extension with dormer to rear roofslope and rooflights to front roof slope.
-
BH2026/00349 Awaiting decision
42 Tongdean Road Hove BN3 6QE
Certificate of lawfulness for proposed erection of single storey side extension.
-
BH2026/00336 Awaiting decision
13 Hythe Road Brighton BN1 6JR
Certificate of lawfulness for proposed loft conversion incorporating rear dormer and 2no. front rooflights.
-
BH2025/03071 Granted
18 Pinfold Close Brighton BN2 6WG
Certificate of lawfulness for the proposed single storey rear extension.
-
BH2026/00328 Awaiting decision
6 Goodwood Way Brighton BN2 4PW
Certificate of Lawfulness for the proposed loft conversion, including hip-to-gable alteration and rear dormer extension, together with fenestration alterations to the side and rear elevations, installation of a rooflight to the front elevation, and solar panels to the rear elevation.