Planning application
9 Princes Square Hove BN3 4GE
Works: Extension Loft or dormer Roofing Demolition Windows or glazing Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Demolition and reconstruction of existing dwelling, including erection of single storey rear extension with rooflights to replace existing rear extension and bay window, roof replacement and alterations to include hipped roof and rear dormer extensions, construction of basement, revised fenestration, alterations to boundary wall to include enlargement of vehicle access, landscaping alterations and any associated works.
As published by the council, reference BH2025/02011
Application record
- Reference
- BH2025/02011
- Type
- Full Planning
- Status
- Decided
- Decision
- Approved
- Received
- 14 Aug 2025
- Validated
- 14 Aug 2025
- Decided
- 27 Nov 2025
- Ward
- Westbourne & Poets' Corner
- Decision by
- Delegated
- Postcode
- BN3 4GE
Site history
Applications at this address on the Brighton and Hove register
This site has had 2 applications since 2025: 2 approved, 0 refused.
-
BH2025/03088 Granted
9 Princes Square Hove BN3 4GE
Non-Material Amendment to application BH2025/02011 to permit alterations to the approved basement layout.
Timeline
Dates from the published record
-
14 Aug 2025
Received by Brighton and Hove
-
27 Nov 2025
Decision issued: Approved
-
21 Jul 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
1 later application on the register refers to this one:
-
BH2025/03088 Granted
9 Princes Square Hove BN3 4GE
Non-Material Amendment to application BH2025/02011 to permit alterations to the approved basement layout.
Documents
Plans, drawings, consultee responses and the officer's report
53 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Brighton and Hove granted permission on 27 November 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
9 Princes Square Hove BN3 4GE
Non-Material Amendment to application BH2025/02011 to permit alterations to the approved basement layout.
Granted Amendments 2 docs -
6 Princes Square Hove BN3 4GE
eucalyptus - dismantle in sections to just above ground level client has fears it may become wind blown maple - reduce by 1.5m 2 x beech - reduce new growth by pruning/trimming acer negundo - reduce by 1.5m bay - reduce by 2m and remove growth over Neighbour
Granted Trees 4 docs -
5 Princes Square Hove BN3 4GE
Replacement of all existing windows with double glazed traditionally detailed windows and doors. Alterations to fenestration including introduction of new bifold windows and doors to the rear of the property, and relocation of openings to the south elevation and minor alteration to the size of 1 no window to the front elevation. Replacement of existing rooflights for conservation style rooflights. Erection of a flue on rear elevation.
Granted Householder Loft or dormer Windows or glazing 18 docsDomestic -
Slade House 15 Princes Square Hove BN3 4GE
97% historically approved · decision due ~21 Apr
Proposed landscaping to the front and rear gardens, alterations to the existing front boundary wall and railings, and widening of the existing vehicular driveway access.(Amended description)
Awaiting decision Householder 8 docsSmall domestic -
9 Aymer Road Hove BN3 4GB
Replacement of ground floor rear patio doors with a window and associated works, amendments to the timber balustrade to the first floor front balcony and fitment of 6no. rooflights (2no. to the front, 1no. to the north side and 3no. to the rear roof slope).
Granted Householder Loft or dormer Windows or glazing 12 docsDomestic -
10 Princes Square Hove BN3 4GE
97% historically approved · decision due ~13 Feb
Proposed alterations to the front garden wall with new gates, formation of a new bin store, a raised brick garden wall adjacent to the side passageway, installation of hanging tiles to the first-floor walls, and installation of photovoltaic panels on the rear flat roof.
Awaiting decision Householder 8 docsDomestic
Other full applications
In Brighton and Hove
-
BH2026/00371 Awaiting decision
27 Ladies Mile Road Brighton BN1 8QE
Demolition of the existing front outdoor seating area and installation of a new front outdoor seating area with a powder coated aluminium frame and retractable roof.
-
BH2026/00352 Awaiting decision
34 Robertson Road Brighton BN1 5NL
Conversion of a three-storey maisonette and lower ground-floor flat into a single dwelling house (C3). Erection of a single-storey side and rear extension.
-
BH2025/03046 Granted
35 Montpelier Crescent Brighton BN1 3JL
Replacement of external fire escape stairs to rear and replacement rear window to match existing.
-
BH2026/00339 Awaiting decision
First Floor Flat 55 Carlisle Road Hove BN3 4FQ
Roof alterations to include the installation of front rooflights and rear dormer.
-
BH2026/00319 Awaiting decision
98 Blatchington Road Hove BN3 3YF
Replacement of existing shopfront and entrance door with new aluminium shopfront and entrance door.