Skip to content
PlanIndex Get alerts
Menu

Planning application

BH2025/01992

12 Portland Street Brighton BN1 1RN

Refused Brighton and Hove Lawful Development Certificate Existing

Proposal

Certificate of lawfulness for the existing use as a short-stay holiday let accommodation (sui generis).

As published by the council, reference BH2025/01992

Timeline

Dates from the published record

  1. 12 Aug 2025

    Received by Brighton and Hove

  2. 1 Oct 2025

    Decision issued: Refused

  3. 21 Jul 2026

    Added to PlanIndex

What refusal means

The process from here

The council refused this application for the reasons set out on the decision notice, which the council portal holds in full. Only the applicant can appeal a refusal; the time limit runs from the decision date and is shorter for householder schemes.

Refusal does not prevent a fresh attempt. Applicants often address the reasons for refusal and resubmit, so a refused scheme is not necessarily the end of proposals for the site.

About lawful development applications

How this application type works

A lawful development certificate is a legal determination, not a planning judgement. It asks the council to confirm either that existing use or works are lawful, often through the passage of time, or that a proposal would not need planning permission at all. The applicant must prove the facts; the merits of the scheme are not considered.

More on lawful development applications in our guide

Nearby applications

Within 500 metres

  • BH2025/02959 Awaiting decision

    125 Queens Road Brighton BN1 3WB

    To install telecommunications apparatus.

    4 Dec 2025 92m away Prior approval
  • BH2026/00033 Awaiting decision

    18A Bond Street Brighton BN1 1RD

    Internal alteration to the existing bar floor surface.

    7 Jan 2026 101m away Heritage and listed buildings
  • BH2025/01815 Granted

    12A - 13 Bond Street Brighton BN1 1RD

    Display of 1no. halo illuminated fascia sign, 1 non-illuminated fascia sign and a non-illuminated projecting sign.

    21 Jul 2025 103m away Advertising
  • BH2025/01925 Awaiting decision

    Sovereign House Church Street Brighton BN1 1UJ

    Erection of extension at basement and ground floor levels to existing warehouse to provide a sports hall and indoor bin store to support existing office use (E), installation of security gates to car park ramp and installation of entrance door to South elevation.

    5 Aug 2025 107m away Full applications
  • BH2025/02435 Split decision

    41 - 43 North Street Brighton BN1 1RH

    Display of externally illuminated fascia sign, externally illuminated projecting sign and installation of a mural/artwork to the front elevation.

    2 Oct 2025 129m away Advertising
  • BH2025/02436 Split decision

    41 - 43 North Street Brighton BN1 1RH

    Display of externally illuminated fascia sign, externally illuminated projecting sign and installation of painted mural/artwork to front & side elevations.

    2 Oct 2025 129m away Advertising

In Brighton and Hove

  • BH2026/00373 Awaiting decision

    245 Hangleton Road Hove BN3 7LR

    Certificate of lawfulness for proposed roof alterations/extensions including hip to gable extension with dormer to rear roofslope and rooflights to front roof slope.

    18 Feb 2026 Lawful development
  • BH2026/00349 Awaiting decision

    42 Tongdean Road Hove BN3 6QE

    Certificate of lawfulness for proposed erection of single storey side extension.

    16 Feb 2026 Lawful development
  • BH2026/00336 Awaiting decision

    13 Hythe Road Brighton BN1 6JR

    Certificate of lawfulness for proposed loft conversion incorporating rear dormer and 2no. front rooflights.

    13 Feb 2026 Lawful development
  • BH2025/03071 Granted

    18 Pinfold Close Brighton BN2 6WG

    Certificate of lawfulness for the proposed single storey rear extension.

    19 Dec 2025 Lawful development
  • BH2026/00328 Awaiting decision

    6 Goodwood Way Brighton BN2 4PW

    Certificate of Lawfulness for the proposed loft conversion, including hip-to-gable alteration and rear dormer extension, together with fenestration alterations to the side and rear elevations, installation of a rooflight to the front elevation, and solar panels to the rear elevation.

    12 Feb 2026 Lawful development