Skip to content
PlanIndex Get alerts
Menu

Planning application

329 Portland Road, Hove, BN3 5SU (EDF Energy 329 Portland Road Hove)

Granted Brighton and Hove BH2009/02878 Full Planning

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of roof top plant to existing Portland West Building. Works to include provision of a new air handling unit, air conditioning units, evacuated tube type solar panels, cantilevered guardrails and modification of existing louvre panel to form new doors.

As published by the council, reference BH2009/02878

Application record

Reference
BH2009/02878
Type
Full Planning
Status
Decided
Decision
Approved
Received
23 Nov 2009
Validated
23 Nov 2009
Decided
14 Jan 2010
Ward
Wish
Decision by
Delegated
Postcode
BN3 5SU

Site history

Applications at this address on the Brighton and Hove register

This site has had 3 applications since 2008: 3 approved, 0 refused.

  • BH2010/01083 Granted

    329 Portland Road, Hove, BN3 5SU (EDF Energy 329 Portland Road Hove )

    Application for approval of details reserved by conditions 8, 10 and 14 of application BH2008/02325

    Decided 2 Jun 2010 Conditions
  • BH2008/02325 Granted

    329 Portland Road, Hove, BN3 5SU (EDF Energy 329 Portland Road Hove)

    Change of use of existing garage building from a storage facility to permanent office accommodation. Associated internal and external works. (Amended scheme; deletion of 1 x CCTV mast, low-level plant and replacement of chainlink fence with close boarded timber fence).

    Decided 27 Nov 2008 Full applications

Timeline

Dates from the published record

  1. 23 Nov 2009

    Received by Brighton and Hove

  2. 14 Jan 2010

    Decision issued: Approved

  3. 4 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

25 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Brighton and Hove granted permission on 14 January 2010, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 329 Portland Road, Hove, BN3 5SU

    BH2012/04070 Submitted 21 Dec 2012 0m away

    External alterations including composite decking, benches, fabricated coated planters and palisade fencing with associated planting.

    Granted Full applications 16 docs
  • 329 Portland Road, Hove, BN3 5SU

    BH2012/04072 Submitted 21 Dec 2012 0m away

    Application for variation of condition 5 of application 3/76/0197 (New district depot and offices for Seeboard) to permit the relocation of 16no standard parking bays and 1no disabled parking bay as well as the creation of 6no additional parking bays around the East building.

    Granted Amendments 19 docs
  • 329 Portland Road, Hove, BN3 5SU (EDF Energy 329 Portland Road Hove )

    BH2010/01083 Submitted 12 Apr 2010 0m away

    Application for approval of details reserved by conditions 8, 10 and 14 of application BH2008/02325

    Granted Conditions 14 docs
  • 329 Portland Road Hove BN3 5SU

    BH2018/00963 Submitted 22 Mar 2018 0m away

    Demolition of existing building 329 Portland Road

    Granted Prior approval Demolition 6 docs
  • 329 Portland Road, Hove, BN3 5SU (EDF Energy 329 Portland Road Hove)

    BH2008/02325 Submitted 8 Jul 2008 0m away

    Change of use of existing garage building from a storage facility to permanent office accommodation. Associated internal and external works. (Amended scheme; deletion of 1 x CCTV mast, low-level plant and replacement of chainlink fence with close boarded timber fence).

    Granted Full applications 75 docs
    Small domestic
  • 2 Chelston Avenue Hove BN3 5SR

    BH2025/02177 Submitted 2 Sep 2025 130m away

    Demolition of existing garage and replacement with single storey side extension, single storey rear extension, new porch, roof alterations/extensions including hip to gable loft conversion, rear dormer and front rooflights and revised fenestration.

    Granted Householder Extension Loft or dormer +3 20 docs
    Small domestic

In Brighton and Hove

  • BH2026/00371 Awaiting decision

    27 Ladies Mile Road Brighton BN1 8QE

    Demolition of the existing front outdoor seating area and installation of a new front outdoor seating area with a powder coated aluminium frame and retractable roof.

    18 Feb 2026 Full applications
  • BH2026/00352 Awaiting decision

    34 Robertson Road Brighton BN1 5NL

    Conversion of a three-storey maisonette and lower ground-floor flat into a single dwelling house (C3). Erection of a single-storey side and rear extension.

    17 Feb 2026 Full applications
  • BH2025/03046 Granted

    35 Montpelier Crescent Brighton BN1 3JL

    Replacement of external fire escape stairs to rear and replacement rear window to match existing.

    16 Dec 2025 Full applications
  • BH2026/00339 Awaiting decision

    First Floor Flat 55 Carlisle Road Hove BN3 4FQ

    Roof alterations to include the installation of front rooflights and rear dormer.

    13 Feb 2026 Full applications
  • BH2026/00319 Awaiting decision

    98 Blatchington Road Hove BN3 3YF

    Replacement of existing shopfront and entrance door with new aluminium shopfront and entrance door.

    11 Feb 2026 Full applications