Skip to content
PlanIndex Get alerts
Menu

Planning application

BH2008/02910

PATCHING LODGE, Park Street, Brighton, BN2 0AQ (Patching Lodge Freshfield Road Brighton)

Granted Brighton and Hove Full Planning

Proposal

Water tank to rear.

As published by the council, reference BH2008/02910

Timeline

Dates from the published record

  1. 22 Aug 2008

    Received by Brighton and Hove

  2. 15 Sep 2008

    Validated

    Checked as complete and ready for consideration.

  3. 4 Nov 2008

    Decision issued: Approved

  4. 4 Aug 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • BH2013/00137 Granted

    PATCHING LODGE, Park Street, Brighton, BN2 0AQ

    Application for approval of details reserved by conditions 2, 3 and 4 of application BH2006/03952.

    16 Jan 2013 0m away Conditions
  • BH2008/03470 Granted

    PATCHING LODGE, Park Street, Brighton, BN2 0AQ

    Siting of 1 no. cooling unit externally to the rear of the plant room at the North of the development.

    30 Oct 2008 0m away Full applications
  • BH2008/02769 Granted

    PATCHING LODGE, Park Street, Brighton, BN2 0AQ

    Variation of condition 5 of application BH2006/03952 to allow the Combined Heat and Power Unit to be located in and serve Patching Lodge only.

    19 Aug 2008 0m away Full applications
  • BH2008/02087 Granted

    PATCHING LODGE, Park Street, Brighton, BN2 0AQ

    Siting of 2 no.air conditioning condensing units on the flat roof over the plant room to the north of the development.

    20 Jun 2008 0m away Full applications
  • BH2006/03952 Granted

    PATCHING LODGE, Park Street, Brighton, BN2 0AQ

    Demolition of the existing building and construction of 7 storey building comprising 76 self contained flats for older people in a sheltered housing scheme to include community facilities (shop/hairdressers/chiropodist/coffee shop) on ground floor and PCT unit and care link office, associated car parking and landscaping (mixed use class C3/D1/A1).

    20 Nov 2006 0m away Full applications
  • BH2004/01845/FP Granted

    LEACH COURT, Park Street, Brighton, BN2 0DE

    Provision of glazed windbreak to west entrance of Leach Court.

    2 Jun 2004 48m away Full applications

In Brighton and Hove

  • BH2026/00371 Awaiting decision

    27 Ladies Mile Road Brighton BN1 8QE

    Demolition of the existing front outdoor seating area and installation of a new front outdoor seating area with a powder coated aluminium frame and retractable roof.

    18 Feb 2026 Full applications
  • BH2026/00352 Awaiting decision

    34 Robertson Road Brighton BN1 5NL

    Conversion of a three-storey maisonette and lower ground-floor flat into a single dwelling house (C3). Erection of a single-storey side and rear extension.

    17 Feb 2026 Full applications
  • BH2025/03046 Granted

    35 Montpelier Crescent Brighton BN1 3JL

    Replacement of external fire escape stairs to rear and replacement rear window to match existing.

    16 Dec 2025 Full applications
  • BH2026/00339 Awaiting decision

    First Floor Flat 55 Carlisle Road Hove BN3 4FQ

    Roof alterations to include the installation of front rooflights and rear dormer.

    13 Feb 2026 Full applications
  • BH2026/00319 Awaiting decision

    98 Blatchington Road Hove BN3 3YF

    Replacement of existing shopfront and entrance door with new aluminium shopfront and entrance door.

    11 Feb 2026 Full applications