Archive · Brighton and Hove · 2010
Planning applications in Brighton and Hove, July 2010
Brighton and Hove recorded 16 planning applications in July 2010, listed newest first. Dates are as received, or as decided where the council publishes no submission date.
Applications, July 2010
Newest first
-
BH2010/02359 Refused
CHARIS COURT, Eaton Road, Hove, BN3 3PQ (Garage/Land Adjacent to Charis Court Eaton Road Hove)
Conversion of garage to form 1no two storey one bedroom dwelling house.
-
BH2010/02320 Granted
UNIVERSITY OF BRIGHTON, 58 - 67 Grand Parade, Brighton, BN2 0JY (58 - 67 Grand Parade Brighton)
Erection of two storey seminar, exhibition and research building on South-East corner of site with timber deck walkway to entrance.
-
BH2010/02277 Granted
PATCHAM PLACE, London Road, Patcham, Brighton, BN1 8YD
Application for variation of condition 3 of application BH2007/00728 in order that details and samples of the slates and roof tiles shall be submitted to and approved in writing by the Local Planning Authority prior to work commencing. Details and samples of the mathematical tiles shall be submitted to and approved in writing by the Local Planning Authority prior to the work on the tiling commencing. The works shall be carried out in strict accordance with the approved details.
-
BH2010/02240 Granted
130 North Street, Brighton, BN1 1RG
Display of internally illuminated fascia sign and internally illuminated projecting sign (retrospective).
-
BH2010/02226 Refused
BERESFORD COURT, Somerhill Road, Hove, BN3 1RH
Conversion of existing residential garage and store to form 1no two bed flat at ground floor level and and associated internal and external works.
-
BH2010/02183 Granted
7 Elm Close, Hove, BN3 6TG
2 x Sycamore - thin by 20%. 1 x Sycamore - reduce height by up to 2m. 1 x Sycamore (T1 only) remove lateral over neighbouring property
-
BH2010/02157 Refused
15A London Terrace, Brighton, BN1 4JP (15 London Terrace Brighton)
Conversion of existing lower ground floor flat to form one 2no bedroom flat and one 1no bedroom flat. Alterations to layout of doors and windows, removal of side entrance, creation of new rear access and landscaping including creation of rear patio area.(Part retrospective).
-
BH2010/02136 Refused
6 Upper Winfield Avenue, Brighton, BN1 8QJ
Roof extension to allow second storey infill extensions and erection of single storey side and rear extension.
-
BH2010/02108 Refused
10 Wilbury Road, Hove, BN3 3JN
Demolition of 8no garage units at rear of 10 Wilbury Road and erection of 2no one bedroom single storey dwelling units.
-
BH2010/02117 Granted
7 Elm Close, Hove, BN3 6TG
Application for Approval of Details Reserved by Conditions 5, 8, 9, 11, 12 and 13 of application BH2008/00196.
-
BH2010/02097 Withdrawn
BLUE WILLOW, 7 Lansdowne Road, Hove, BN3 1FZ
Erection of two storey rear and side infill extension and roof alterations including raising of the ridge height, removal of central chimney, new dormers to east, north and west elevations and rooflights to south elevation. Alterations and additions to windows and doors on all elevations.
-
BH2010/02107 Granted
GWYDYR MANSIONS, 40 Holland Road, Hove, BN3 1JW (Gwydyr Mansions, Holland Road )
2 x Ailanthus altissima - 20% thin
-
BH2010/02059 Granted
DUBARRY HOUSE, Newtown Road, Hove, BN3 6AE
Replacement of existing single glazed metal windows with new double glazed sealed unit powder coated aluminium windows at rear/north elevation.
-
BH2010/02089 Granted
3 Burwash Road, Hove, BN3 8GP
Installation of new aluminium double glazed shop front. (Retrospective)
-
BH2010/02091 Granted
THE BRIGHTON CENTRE, Kings Road, Brighton, BN1 2GR
Alterations to ground floor front elevation to install new revolving door and disabled access door replacing existing windows, and new automatic sliding door replacing existing entrance doors.
-
BH2010/02058 Granted
Carisbrooke House, 53 Carisbrooke Road, Brighton, BN2 3EF (53 Carisbrooke Road Brighton )
Application for removal of condition 2 of application BH2007/04288 which states that 'No development shall take place until details of a scheme to provide sustainable transport infrastructure to support the demand for travel generated by the development has been submitted to and approved in writing by the Local Planning Authority. This shall include a timetable for the provision to be made and shall be carried out in accordance with the approved details.'
Other months in 2010
- January 2010 2
- February 2010 5
- March 2010 8
- April 2010 5
- May 2010 10
- June 2010 7
- July 2010 16
- August 2010 4
- September 2010 9
- October 2010 7
- November 2010 9
- December 2010 9