Proposal

Approval of Reserved Matters (Appearance, Landscaping, Layout and Scale) relating to the substation for hybrid planning permission ref. 23/00862/FUL (Demolition of grain and agricultural machinery stores. Creation of a community woodland facility comprising: new community building, including staff welfare and office facilities and outdoor terrace, construction of a Forestry England Barn, new vehicular access into a 94-space car, with EV charging points and overflow area; coach parking space, staff and disabled car parking, service yard and vehicle turning circle, surfaced and unsurfaced woodland paths, creation of six new ponds and informal natural play areas, bin store, cycle parking and landscaping (detailed application). Construction of an open sided visitor shelter, modular cafe with covered outdoor seating area, and WC facilities, substation and (outline application all matters, except access, reserved))

As published by the council, reference 24/01403/REM

Application record

Reference
24/01403/REM
Type
Approval of Reserved Matters
Status
Approved
Decision
Granted As published: Application Permitted
Received
18 Dec 2024
Validated
18 Dec 2024
Decided
28 Feb 2025
Ward
Herongate, Ingrave And West Horndon
Decision by
Delegated Decisions
Postcode
CM13 3JD

Site history

Applications at this address on the Brentwood register

This site has had 4 applications since 2024: 4 approved, 0 refused.

  • 24/01336/REM Granted

    Hole Farm Hole Farm Lane Great Warley Essex CM13 3JD

    Approval of Reserved Matters (Appearance, Landscaping, Layout and Scale) following hybrid planning permission 23/00862/FUL (Demolition of grain and agricultural machinery stores. Creation of a community woodland facility comprising: new community building, including staff welfare and office facilities and outdoor terrace, construction of a Forestry England Barn, new vehicular access into a 94-space car, with EV charging points and overflow area; coach parking space, staff and disabled car parking, service yard and vehicle turning circle, surfaced and unsurfaced woodland paths, creation of six new ponds and informal natural play areas, bin store, cycle parking and landscaping (detailed application). Construction of an open sided visitor shelter, modular cafe with covered outdoor seating area, and WC facilities, substation and (outline application all matters, except access, reserved))

    Decided 28 Feb 2025 Reserved matters
  • 23/00862/COND/2 Granted

    Hole Farm Hole Farm Lane Great Warley Essex CM13 3JD

    Discharge of conditions 7 (off-site flooding) 12 (Archaeological trial-trenching evaluation), 13 (mitigation strategy) 15 (post excavation assessment) and 14 (completion of field work) of application 23/00862/FUL (Demolition of grain and agricultural machinery stores. Creation of a community woodland facility comprising: new community building, including staff welfare and office facilities and outdoor terrace, construction of a Forestry England Barn, new vehicular access into a 94-space car, with EV charging points and overflow area; coach parking space, staff and disabled car parking, service yard and vehicle turning circle, surfaced and unsurfaced woodland paths, creation of six new ponds and informal natural play areas, bin store, cycle parking and landscaping (detailed application). Construction of an open sided visitor shelter, modular cafe with covered outdoor seating area, and WC facilities, substation and (outline application all matters, except access, reserved))

    Decided 30 Oct 2024 Conditions
  • 23/00862/COND/1 Granted

    Hole Farm Hole Farm Lane Great Warley Essex CM13 3JD

    Discharge of conditions 10 (Further Badger Survey), 11 (Programme of Archaeological Investigation and Written Scheme of Investigation), 16 (Construction Management Plan) and 17 (Phase 1 Contaminated Land Assessment) of application 23/00862/FUL (Demolition of grain and agricultural machinery stores. Creation of a community woodland facility comprising: new community building, including staff welfare and office facilities and outdoor terrace, construction of a Forestry England Barn, new vehicular access into a 94-space car, with EV charging points and overflow area; coach parking space, staff and disabled car parking, service yard and vehicle turning circle, surfaced and unsurfaced woodland paths, creation of six new ponds and informal natural play areas, bin store, cycle parking and landscaping (detailed application). Construction of an open sided visitor shelter, modular cafe with covered outdoor seating area, and WC facilities, substation and (outline application all matters, except access, reserved)).

    Decided 13 Sep 2024 Conditions

Timeline

Dates from the published record

  1. 18 Dec 2024

    Received by Brentwood

  2. 28 Feb 2025

    Decision issued: Application Permitted

  3. 21 Nov 2026

    Added to PlanIndex

Cases linked to this one on the register

  • 23/00862/FUL Granted

    Hole Farm Hole Farm Lane Great Warley Brentwood Essex CM13 3JD

    Demolition of grain and agricultural machinery stores. Creation of a community woodland facility comprising: new community building, including staff welfare and office facilities and outdoor terrace, construction of a Forestry England Barn, new vehicular access into a 94-space car, with EV charging points and overflow area; coach parking space, staff and disabled car parking, service yard and vehicle turning circle, surfaced and unsurfaced woodland paths, creation of six new ponds and informal natural play areas, bin store, cycle parking and landscaping (detailed application). Construction of an open sided visitor shelter, modular cafe with covered outdoor seating area, and WC facilities, substation and (outline application all matters, except access, reserved)

    Decided 7 Dec 2023 Full applications

Who's behind it

Company information only, from the register and Companies House

Atkins Ltd Agent, registered in Swansea

Active · incorporated 2023 · Swansea

149 applications on PlanIndex · across 51 councils · 99% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

15 documents on file for this application

A planning file usually holds the application form, the consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

Working a patch? Trade sends you every new job in your area each morning. 14 days free.

What this grant of permission means

Brentwood granted permission on 28 February 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About reserved matters applications

A reserved matters application fills in the detail held back from an earlier outline permission, judged against that permission rather than the principle of development. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Hole Farm Hole Farm Lane Great Warley Essex CM13 3JD

    23/00862/COND/2 Submitted 24 Sep 2024 50 yards away

    Discharge of conditions 7 (off-site flooding) 12 (Archaeological trial-trenching evaluation), 13 (mitigation strategy) 15 (post excavation assessment) and 14 (completion of field work) of application 23/00862/FUL (Demolition of grain and agricultural machinery stores. Creation of a community woodland facility comprising: new community building, including staff welfare and office facilities and outdoor terrace, construction of a Forestry England Barn, new vehicular access into a 94-space car, with EV charging points and overflow area; coach parking space, staff and disabled car parking, service yard and vehicle turning circle, surfaced and unsurfaced woodland paths, creation of six new ponds and informal natural play areas, bin store, cycle parking and landscaping (detailed application). Construction of an open sided visitor shelter, modular cafe with covered outdoor seating area, and WC facilities, substation and (outline application all matters, except access, reserved))

    Granted Conditions Demolition Drawings (1) 6 docs
  • Hole Farm Hole Farm Lane Great Warley Brentwood Essex CM13 3JD

    23/01058/ADV Submitted 25 Aug 2023 50 yards away

    2 X Non Illuminated entrance signs. 3 X Non Illuminated banner structures, 22 X Non illuminated pedestrian waymarker posts, 3 X Non Illuminated pedestrian signs/combined information structure, 7 X Non Illuminated thin information structures, 3 X Non Illuminated pedestrian signs/lectern structure, and 3 X Non Illuminated lectern structures.

    Granted Advertising 8 docs
  • Hole Farm Hole Farm Lane Great Warley Essex CM13 3JD

    23/00862/COND/1 Submitted 26 Jun 2024 50 yards away

    Discharge of conditions 10 (Further Badger Survey), 11 (Programme of Archaeological Investigation and Written Scheme of Investigation), 16 (Construction Management Plan) and 17 (Phase 1 Contaminated Land Assessment) of application 23/00862/FUL (Demolition of grain and agricultural machinery stores. Creation of a community woodland facility comprising: new community building, including staff welfare and office facilities and outdoor terrace, construction of a Forestry England Barn, new vehicular access into a 94-space car, with EV charging points and overflow area; coach parking space, staff and disabled car parking, service yard and vehicle turning circle, surfaced and unsurfaced woodland paths, creation of six new ponds and informal natural play areas, bin store, cycle parking and landscaping (detailed application). Construction of an open sided visitor shelter, modular cafe with covered outdoor seating area, and WC facilities, substation and (outline application all matters, except access, reserved)).

    Granted Conditions Demolition Drawings (1) 10 docs
  • Hole Farm Hole Farm Lane Great Warley Essex CM13 3JD

    24/01336/REM Submitted 2 Dec 2024 50 yards away

    Approval of Reserved Matters (Appearance, Landscaping, Layout and Scale) following hybrid planning permission 23/00862/FUL (Demolition of grain and agricultural machinery stores. Creation of a community woodland facility comprising: new community building, including staff welfare and office facilities and outdoor terrace, construction of a Forestry England Barn, new vehicular access into a 94-space car, with EV charging points and overflow area; coach parking space, staff and disabled car parking, service yard and vehicle turning circle, surfaced and unsurfaced woodland paths, creation of six new ponds and informal natural play areas, bin store, cycle parking and landscaping (detailed application). Construction of an open sided visitor shelter, modular cafe with covered outdoor seating area, and WC facilities, substation and (outline application all matters, except access, reserved))

    Granted Reserved matters Demolition 22 docs
  • Hole Farm Hole Farm Lane Great Warley Brentwood Essex CM13 3JD

    23/00863/LBC Submitted 12 Jul 2023 50 yards away

    Demolition of grain and agricultural machinery store.

    Granted Heritage and listed buildings Demolition 70 docs
  • Hole Farm Hole Farm Lane Great Warley Brentwood Essex CM13 3JD

    23/00862/FUL Submitted 12 Jul 2023 50 yards away

    Demolition of grain and agricultural machinery stores. Creation of a community woodland facility comprising: new community building, including staff welfare and office facilities and outdoor terrace, construction of a Forestry England Barn, new vehicular access into a 94-space car, with EV charging points and overflow area; coach parking space, staff and disabled car parking, service yard and vehicle turning circle, surfaced and unsurfaced woodland paths, creation of six new ponds and informal natural play areas, bin store, cycle parking and landscaping (detailed application). Construction of an open sided visitor shelter, modular cafe with covered outdoor seating area, and WC facilities, substation and (outline application all matters, except access, reserved)

    Granted Full applications Demolition 78 docs

In Brentwood

  • 26/01016/REM Awaiting decision

    Entire Land East Of A128 South Of A127 Tilbury Road West Horndon Essex

    Advanced Infrastructure Works Reserved Matters Application pursuant to conditions 2 and 12 of outline planning permission 21/01525/OUT comprising: (1) detailed landscaping works, (2) access junction comprising reconfiguration of the means of access for buses, pedestrians, and cyclists, in accordance with the terms of condition 30, (3) highway infrastructure comprising mobility corridor, footways, and cycle paths, (4) drainage and utilities infrastructure.

    Received 10 Sep, published by the council 22 Sep 2026 Reserved matters
  • 26/00852/REM Awaiting decision

    Plot 01 Brentwood Gateway Park Brook Street Brentwood CM14 5ND

    Approval of reserved matters (appearance, layout, landscaping and scale) relating to Plot 01 Car Showroom and Ancillary Office only of outline planning permission 22/00044/OUT (Outline planning application (all matters reserved other than access) for mixed use development comprising up to 12,000sqm GIA car showroom use with ancillary office use (Sui Generis), 20,250sqm GIA flexible employment/storage and distribution uses with ancillary office use (B2/B8) and 50 residential dwellings (C3) with associated access, parking and landscaping works).

    Received 31 Jul, published by the council 10 Sep 2026 Reserved matters
  • 26/00711/REM Awaiting decision

    Entire Land East Of A128 South Of A127 Tilbury Road West Horndon Essex

    Reserved Matters Application for Advanced Infrastructure Works pursuant to requirements of conditions 2 and 12 of outline planning permission 21/01525/OUT comprising: (1) detailed landscaping works, (2) access junction comprising reconfiguration of the southern access roundabout, in accordance with the terms of condition 32, (3) highway infrastructure comprising spine road, footways, and cycle paths, (4) drainage and utilities infrastructure.

    Received 25 Jun, published by the council 23 Jul 2026 Reserved matters
  • 24/01336/REM Granted

    Hole Farm Hole Farm Lane Great Warley Essex CM13 3JD

    Approval of Reserved Matters (Appearance, Landscaping, Layout and Scale) following hybrid planning permission 23/00862/FUL (Demolition of grain and agricultural machinery stores. Creation of a community woodland facility comprising: new community building, including staff welfare and office facilities and outdoor terrace, construction of a Forestry England Barn, new vehicular access into a 94-space car, with EV charging points and overflow area; coach parking space, staff and disabled car parking, service yard and vehicle turning circle, surfaced and unsurfaced woodland paths, creation of six new ponds and informal natural play areas, bin store, cycle parking and landscaping (detailed application). Construction of an open sided visitor shelter, modular cafe with covered outdoor seating area, and WC facilities, substation and (outline application all matters, except access, reserved))

    Received 2 Dec, published by the council 21 Nov 2026 Reserved matters
  • 24/00914/REM Granted

    1 Tennyson Road Hutton Essex CM13 2SJ

    Approval of reserved matters (Landscaping) following Outline approval 21/01213/OUT (Outline application for demolition of existing dwelling and construction of a new 4 bedroom dwelling with habitable rooms within the loft space (Landscaping reserved matters).

    Received 8 Aug, published by the council 9 Aug 2026 Reserved matters