Planning application
Crow Green Fishery Days Lane Pilgrims Hatch Essex CM15 9SJ
Works: Extension
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Change of use of stable block and extension to form six holiday units.
As published by the council, reference 24/00393/FUL
Application record
- Reference
- 24/00393/FUL
- Type
- Full Application
- Status
- Approved
- Decision
- Granted As published: Application Permitted
- Received
- 2 Apr 2024
- Validated
- 2 Apr 2024
- Decided
- 22 Jul 2024
- Ward
- Pilgrims Hatch
- Decision by
- Delegated Decisions
- Postcode
- CM15 9SJ
Site history
Applications at this address on the Brentwood register
This site has had 2 applications since 2021: 2 approved, 0 refused.
-
21/00421/FUL Granted
Crow Green Fishery Days Lane Pilgrims Hatch Essex CM15 9SJ
Engineering excavation/importation works (Retrospective).
Timeline
Dates from the published record
-
2 Apr 2024
Received by Brentwood
-
22 Jul 2024
Decision issued: Application Permitted
-
21 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
15 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Brentwood granted permission on 22 July 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Harvest Moon Days Lane Pilgrims Hatch Essex CM15 9SJ
5T2 - oak. Tree was previously pollarded and (according to the tree surgeon) is in "die-back". Seeking consent to re-pollard for the benefit of neighbouring tree (T3 oak). There is a gap of 5m between the trunks of T2 and T3. This will then allow light into the tree and allow T3 (which is not in "die-back" to grow more evenly. T3 - oak - Crown Reduction and reshape (currently growing lopsided) - reducing the height and spread by up to 4m. T4 - Hornbeam - reduction to a height of 4m for the benefit of T3 (oak) and T4 (oak) which are growing lopsided - is overhanging neighbouring property (Harvest Moon) by c. 5m and now totally covers a building. T5 - oak - Crown Reduction and reshape (currently growing lopsided) - reducing the height and spread by up to 4m. T5 is overhanging neighbouring property (Harvest Moon) by c. 5m. T6 - oak- cut back all overhanging branches to the boundary line. (TPO21/1993).
Granted Trees 13 docs -
Flora Days Lane Pilgrims Hatch Brentwood Essex CM15 9SJ
Demolition of existing detached garage, outbuilding and oil tank and the construction of a single storey rear extension
Granted Householder Extension Demolition 8 docsSmall domestic -
Lea Tor Days Lane Pilgrims Hatch Brentwood Essex CM15 9SJ
Demolition of existing dwelling and construction of a new dwelling.
Granted Full applications New dwelling Demolition 12 docsDomestic -
Clay Hall Days Lane Pilgrims Hatch Essex CM15 9SJ
Change of use of land from stable yard to residential curtilage
Granted Full applications 6 docs -
Clay Hall Days Lane Pilgrims Hatch Essex CM15 9SJ
Proposed extensions and alterations to existing bungalow.
Refused Householder Extension 14 docsDomestic -
Clay Hall Days Lane Pilgrims Hatch Essex
Construction of detached carport. Extensions and alterations to the dwellinghouse to include new entrance door and porch, pitched roof dormers and gable extension to the front elevation, addition of render to the exterior walls and brick plinth, addition of chimney and alterations to the existing fenestration.
Granted Householder Extension Loft or dormer +1 24 docsSmall domestic
Other full applications
In Brentwood
-
26/01176/FUL Awaiting decision
Oak Cottage 550 Rayleigh Road Hutton Essex CM13 1SG
Demolition of existing outbuildings and erection of one detached dwelling with associated parking and landscaping.
-
26/01169/FUL Awaiting decision
Lingwood Ashwells Road Pilgrims Hatch Essex CM15 9SE
Construction of a single detached dwelling house.
-
26/01144/FUL Awaiting decision
37 High Street Brentwood Essex CM14 4RH
Demolition of existing enclosed refuse storage structure and construction of a part three/part four-storey building to the rear of 37 High Street, comprising a ground-floor commercial unit with integrated bin and cycle storage and five residential dwellings above.
-
26/01086/FUL Awaiting decision
Rodingdale 2 The Row Albyns Lane Stapleford Tawney Essex RM4 1RT
Retention of existing container.
-
26/01214/FUL Awaiting decision
Pumping Station Cottage Great Warley Street Great Warley Essex CM13 3JR
Change of use from redundant stable to administration & office building linked to school on site