Skip to content
PlanIndex Get alerts
Menu

Planning application

Endeavour School Hogarth Avenue Brentwood Essex CM15 8BE

Granted Brentwood 22/01469/FUL Full Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of a double storey block of modular classrooms for a temporary period of 24 months

As published by the council, reference 22/01469/FUL

Application record

Reference
22/01469/FUL
Type
Full Application
Status
Approved
Decision
Granted As published: Application Permitted
Received
19 Oct 2022
Validated
19 Oct 2022
Decided
10 Mar 2023
Ward
Brentwood South
Decision by
Delegated Decisions
Postcode
CM15 8BE

Site history

Applications at this address on the Brentwood register

This site has had 10 applications since 2022: 10 approved, 0 refused.

  • 22/01756/NON/2 Granted

    Endeavour School Hogarth Avenue Brentwood Essex CM15 8BE

    Non-material amendment to application 22/01756/FUL (Demolition of all existing buildings, proposed re-development of Endeavour Co-operative Academy (Use Class F1(a)) to include the construction of a new two storey school building with associated access, parking, pupil drop off, new playing field, external play spaces and hard and soft landscaping) to allow for the relocation of the fence line approximately 2 metres into the school site, reduce the physical fence height from 4.5 metres to 2.4 metres and retain the same effective overall screening and acoustic height relative to the adjoining railway

    Submitted 6 Aug 2026
  • 26/00180/FUL Granted

    Endeavour School Hogarth Avenue Brentwood Essex CM15 8BE

    Proposed creation of a playground to include play surface. play equipment, associated access, boundary treatments, lighting and landscaping.

    Decided 19 May 2026 Full applications
  • 22/01756/COND/4 Granted

    Endeavour School Hogarth Avenue Brentwood Essex CM15 8BE

    Discharge of conditions 4 (Details of materials) of application 22/01756/FUL (Demolition of all existing buildings, proposed re-development of Endeavour Co-operative Academy (Use Class F1(a)) to include the construction of a new two storey school building with associated access, parking, pupil drop off, new playing field, external play spaces and hard and soft landscaping).

    Decided 29 Nov 2024 Conditions
  • 22/01756/COND/3 Granted

    Endeavour School Hogarth Avenue Brentwood Essex CM15 8BE

    Discharge of conditions 4 (Details of materials), 15 (Details of Hard & Soft Landscaping) and 27 (Details of Cycle Parking) of application 22/01756/FUL (Demolition of all existing buildings, proposed re-development of Endeavour Co-operative Academy (Use Class F1(a)) to include the construction of a new two storey school building with associated access, parking, pupil drop off, new playing field, external play spaces and hard and soft landscaping).

    Decided 13 Sep 2024 Conditions
  • 22/01756/COND/2 Granted

    Endeavour School Hogarth Avenue Brentwood Essex CM15 8BE

    Discharge of condition 21 (Full details of location and any screening) of application 22/01756/FUL (Demolition of all existing buildings, proposed re-development of Endeavour Co-operative Academy (Use Class F1(a)) to include the construction of a new two storey school building with associated access, parking, pupil drop off, new playing field, external play spaces and hard and soft landscaping).

    Decided 26 Jan 2024 Conditions
  • 22/01756/NON/1 Granted

    Endeavour School Hogarth Avenue Brentwood Essex CM15 8BE

    Non material amendment to application 22/01756/FUL (Demolition of all existing buildings, proposed re-development of Endeavour Co-operative Academy (Use Class F1(a)) to include the construction of a new two storey school building with associated access, parking, pupil drop off, new playing field, external play spaces and hard and soft landscaping) for internal alterations, amendment to building line and recessed area, amendments to the fenestration pattern and rooflights, and adjustments to size and position of roof mounted plant room. Full details described within covering letter.

    Decided 29 Dec 2023 Amendments
  • 23/01280/FUL Granted

    Endeavour School Hogarth Avenue Brentwood Essex CM15 8BE

    Construction of PV Canopies and enclosures for sprinkler tank, emergency generator and air source heat pumps.

    Decided 29 Dec 2023 Full applications
  • 22/01756/COND/1 Granted

    Endeavour School Hogarth Avenue Brentwood Essex CM15 8BE

    Discharge of conditions 5 (Construction and Environmental Management Plan), 6 (Investigation and Risk Assessment (Phase 2 contamination report)), 7 (Detailed Remediation Scheme), 8 (Details set out in Remediation scheme have been implemented), 10, (Detailed surface water drainage scheme), 11 (Scheme to offsite flooding) and 28 (Existing and proposed ground levels and finished floor levels) of application 22/01756/FUL (Demolition of all existing buildings, proposed re-development of Endeavour Co-operative Academy (Use Class F1(a)) to include the construction of a new two storey school building with associated access, parking, pupil drop off, new playing field, external play spaces and hard and soft landscaping).

    Decided 12 Feb 2024 Conditions
  • 22/01756/FUL Granted

    Endeavour School Hogarth Avenue Brentwood Essex CM15 8BE

    Demolition of all existing buildings, proposed re-development of Endeavour Co-operative Academy (Use Class F1(a)) to include the construction of a new two storey school building with associated access, parking, pupil drop off, new playing field, external play spaces and hard and soft landscaping

    Decided 6 Apr 2023 Full applications

Timeline

Dates from the published record

  1. 19 Oct 2022

    Received by Brentwood

  2. 10 Mar 2023

    Decision issued: Application Permitted

  3. 23 Jul 2026

    Added to PlanIndex

Cases linked to this one on the register

  • Application: 12/00624/FUL (Approved)
  • Application: 13/00052/STU (No Objection)
  • Application: 15/00411/FUL (Approved)
  • Application: 22/01756/FUL (Approved)
  • Application: 25/01087/FUL (Approved)

Who's behind it

Company information only, from the register and Companies House

Hatton Planning Agent, a planning consultancy registered in Leamington Spa

Active · incorporated 2021 · Leamington Spa

52 applications on PlanIndex · across 14 councils · 92% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

27 documents on file for this application

  • *REVISED* CONSTRUCTION TRAFFIC MANAGEMENT PLAN Supporting Documents · 10 Mar 2023
  • OFFICER REPORT Report · 10 Mar 2023
  • DECISION NOTICE Decision Notice · 10 Mar 2023
  • *SUPERSEDED* CONSTRUCTION TRAFFIC MANAGEMENT PLAN Supporting Documents · 03 Feb 2023
  • RESPONSE TO LLFA COMMENTS Correspondence - Public · 24 Jan 2023
  • *REVISED* DRAINAGE STRATEGY Supporting Documents · 24 Jan 2023
  • SRP1091-AKSW-XX-XX-DR-C-9254 DRAINAGE STANDARD DETAILS SHEET 4 Supporting Documents · 24 Jan 2023
  • SRP1091-AKSW-XX-XX-DR-C-9253 DRAINAGE STANDARD DETAILS SHEET 3 Supporting Documents · 24 Jan 2023
  • SRP1091-AKSW-XX-XX-DR-C-9252 DRAINAGE STANDARD DETAILS SHEET 2 Supporting Documents · 24 Jan 2023
  • SRP1091-AKSW-XX-XX-DR-C-9251 DRAINAGE STANDARD DETAILS SHEET 1 Supporting Documents · 24 Jan 2023
  • SRP1091-AKSW-XX-XX-DR-C-9202 DRAINAGE STRATEGY SHEET 2 Supporting Documents · 24 Jan 2023
  • SRP1091-AKSW-XX-XX-DR-C-9201 DRAINAGE STRATEGY SHEET 1 Supporting Documents · 24 Jan 2023
  • *REVISED* 1 IN 30 + 40%CC HALF DRAIN TIME CHECK Supporting Documents · 24 Jan 2023
  • *REVISED* FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY Supporting Documents · 24 Jan 2023
  • MR R CLAPHAM Representation · 10 Jan 2023
  • MR S AND MRS G FLEMING Representation · 09 Jan 2023
  • *SUPERSEDED* DRAINAGE STRATEGY. Supporting Documents · 22 Dec 2022
  • *SUPERSEDED* 1 IN 30 + 40%CC HALF DRAIN TIME CHECK Supporting Documents · 22 Dec 2022
  • *SUPERSEDED* CONSTRUCTION TRAFFIC MANAGEMENT PLAN Supporting Documents · 14 Dec 2022
  • *SUPERSEDED* FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY Supporting Documents · 09 Dec 2022
  • RALPH CHAPMAN Representation · 08 Dec 2022
  • APPLICATION FORM Application Form · 19 Oct 2022
  • 1000 - SITE LOCATION PLAN Site Plan · 19 Oct 2022
  • 100X-P1 - EXISTING BLOCK PLAN Block Plan · 19 Oct 2022
  • 1001-P1 - PROPOSED BLOCK PLAN Block Plan · 19 Oct 2022
  • 02 - PROPOSED PLANS & ELEVATIONS Drawing · 19 Oct 2022
  • COVERING LETTER Supporting Documents · 19 Oct 2022

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Brentwood granted permission on 10 March 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Endeavour School Hogarth Avenue Brentwood Essex CM15 8BE

    22/01756/COND/4 Submitted 18 Oct 2024 50 yards away

    Discharge of conditions 4 (Details of materials) of application 22/01756/FUL (Demolition of all existing buildings, proposed re-development of Endeavour Co-operative Academy (Use Class F1(a)) to include the construction of a new two storey school building with associated access, parking, pupil drop off, new playing field, external play spaces and hard and soft landscaping).

    Granted Conditions Demolition 4 docs
  • Endeavour School Hogarth Avenue Brentwood Essex CM15 8BE

    22/01756/COND/2 Submitted 1 Nov 2023 50 yards away

    Discharge of condition 21 (Full details of location and any screening) of application 22/01756/FUL (Demolition of all existing buildings, proposed re-development of Endeavour Co-operative Academy (Use Class F1(a)) to include the construction of a new two storey school building with associated access, parking, pupil drop off, new playing field, external play spaces and hard and soft landscaping).

    Granted Conditions Demolition 9 docs
  • Endeavour School Hogarth Avenue Brentwood Essex CM15 8BE

    22/01756/COND/3 Submitted 27 Jun 2024 50 yards away

    Discharge of conditions 4 (Details of materials), 15 (Details of Hard & Soft Landscaping) and 27 (Details of Cycle Parking) of application 22/01756/FUL (Demolition of all existing buildings, proposed re-development of Endeavour Co-operative Academy (Use Class F1(a)) to include the construction of a new two storey school building with associated access, parking, pupil drop off, new playing field, external play spaces and hard and soft landscaping).

    Granted Conditions Demolition 22 docs
  • Endeavour School Hogarth Avenue Brentwood Essex CM15 8BE

    22/01756/NON/1 Submitted 16 Oct 2023 50 yards away

    Non material amendment to application 22/01756/FUL (Demolition of all existing buildings, proposed re-development of Endeavour Co-operative Academy (Use Class F1(a)) to include the construction of a new two storey school building with associated access, parking, pupil drop off, new playing field, external play spaces and hard and soft landscaping) for internal alterations, amendment to building line and recessed area, amendments to the fenestration pattern and rooflights, and adjustments to size and position of roof mounted plant room. Full details described within covering letter.

    Granted Amendments Loft or dormer Demolition +1 17 docs
  • Endeavour School Hogarth Avenue Brentwood Essex CM15 8BE

    22/01756/COND/1 Submitted 12 Jun 2023 50 yards away

    Discharge of conditions 5 (Construction and Environmental Management Plan), 6 (Investigation and Risk Assessment (Phase 2 contamination report)), 7 (Detailed Remediation Scheme), 8 (Details set out in Remediation scheme have been implemented), 10, (Detailed surface water drainage scheme), 11 (Scheme to offsite flooding) and 28 (Existing and proposed ground levels and finished floor levels) of application 22/01756/FUL (Demolition of all existing buildings, proposed re-development of Endeavour Co-operative Academy (Use Class F1(a)) to include the construction of a new two storey school building with associated access, parking, pupil drop off, new playing field, external play spaces and hard and soft landscaping).

    Granted Conditions Demolition 51 docs
  • Endeavour School Hogarth Avenue Brentwood Essex CM15 8BE

    22/01756/FUL Submitted 3 Jan 2023 50 yards away

    Demolition of all existing buildings, proposed re-development of Endeavour Co-operative Academy (Use Class F1(a)) to include the construction of a new two storey school building with associated access, parking, pupil drop off, new playing field, external play spaces and hard and soft landscaping

    Granted Full applications Demolition 56 docs

In Brentwood

  • 26/01176/FUL Awaiting decision

    Oak Cottage 550 Rayleigh Road Hutton Essex CM13 1SG

    Demolition of existing outbuildings and erection of one detached dwelling with associated parking and landscaping.

    Full applications
  • 26/01169/FUL Awaiting decision

    Lingwood Ashwells Road Pilgrims Hatch Essex CM15 9SE

    Construction of a single detached dwelling house.

    Full applications
  • 26/01144/FUL Awaiting decision

    37 High Street Brentwood Essex CM14 4RH

    Demolition of existing enclosed refuse storage structure and construction of a part three/part four-storey building to the rear of 37 High Street, comprising a ground-floor commercial unit with integrated bin and cycle storage and five residential dwellings above.

    Full applications
  • 26/01086/FUL Awaiting decision

    Rodingdale 2 The Row Albyns Lane Stapleford Tawney Essex RM4 1RT

    Retention of existing container.

    Full applications
  • 26/01214/FUL Awaiting decision

    Pumping Station Cottage Great Warley Street Great Warley Essex CM13 3JR

    Change of use from redundant stable to administration & office building linked to school on site

    Full applications