Skip to content
PlanIndex Get alerts
Menu

Planning application

Stondon Massey House Ongar Road Stondon Massey Brentwood Essex CM15 0LD

Granted Brentwood 22/01418/LBC Listed Building Consent

Works: Demolition

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Demolition of existing outbuilding.

As published by the council, reference 22/01418/LBC

Application record

Reference
22/01418/LBC
Type
Listed Building Consent
Status
Approved
Decision
Application Permitted
Received
10 Oct 2022
Validated
10 Oct 2022
Decided
20 Jan 2023
Ward
Tipps Cross
Parish
Stondon Massey
Decision by
Delegated Decisions
Postcode
CM15 0LD

Site history

Applications at this address on the Brentwood register

This site has had 3 applications since 2019: 3 approved, 0 refused.

  • 22/01417/HHA Granted

    Stondon Massey House Ongar Road Stondon Massey Brentwood Essex CM15 0LD

    Demolition of existing outbuilding and construction of a detached pitched roof outbuilding.

    Decided 20 Jan 2023 Householder
  • 19/01591/AGR Granted

    Stondon Massey House Ongar Road Stondon Massey Brentwood Essex CM15 0LD

    Construction of driveway

    Decided 19 Dec 2019 Other

Timeline

Dates from the published record

  1. 10 Oct 2022

    Received by Brentwood

  2. 20 Jan 2023

    Decision issued: Application Permitted

  3. 9 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, a design practice registered in Chelmsford

78 applications on PlanIndex · across 7 councils · 80% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Brentwood granted permission on 20 January 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Brentwood

  • 26/00408/LBC Granted

    Soames Farm Nine Ashes Road Stondon Massey Essex CM15 0EL

    Demolition of outbuilding. Construction of outbuilding with carport and replacement of concrete hard standing with shingle.

    27 Apr 2026 Heritage and listed buildings
  • 26/00797/LBC Awaiting decision

    Randalls Farm Cottage Murthering Lane Navestock Essex RM4 1HD

    Installation of a replacement mains water supply to 2no. cottages and the decommissioning of a septic tank, and replacement with sewage treatment plant

    Heritage and listed buildings
  • 26/00812/LBC Awaiting decision

    63 High Street Brentwood Essex CM14 4RH

    Installation of kitchen to first floor with associated M&E upgrades, refurbishment of ground floor for change of use to cafe/bar, new raised floor to stair lobby to facilitate service distribution, refurbishment of WC with new finishes, fittings and equipment, new joinery to ground floor and replacement of front signage graphics and redecoration to sign board.

    Heritage and listed buildings
  • 26/00503/LBC Awaiting decision

    Brentwood United Reformed Church New Road Brentwood Essex CM14 4GD

    Installation of externally mounted signage displaying Immanuel Church Brentwood at the front and a notice board to the side

    Heritage and listed buildings
  • 26/00500/LBC Refused

    The Bell High Street Ingatestone Essex CM4 0AT

    Construction of new raised pictorial completed with new header and footer to be fixed to existing bracket.

    30 Apr 2026 Heritage and listed buildings