Skip to content
PlanIndex Get alerts
Menu

Planning application

Larkrise Farm The Tyburns Hutton Essex CM13 2JD

Granted Brentwood 21/00141/COND/3 Discharge of Conditions

Works: New dwelling Demolition Several homes

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Discharge of Condition 16 (residential Travel Information Pack) of planning application 21/00141/FUL (Demolition of existing buildings and construction of seven new dwellings (2no 3 bedrooms, 3no 4 bedrooms and 2no 5 bedrooms) with associated landscaping and parking.)

As published by the council, reference 21/00141/COND/3

Application record

Reference
21/00141/COND/3
Type
Discharge of Conditions
Status
Approved
Decision
Granted As published: Application Permitted
Received
19 Apr 2024
Validated
19 Apr 2024
Decided
14 Jun 2024
Ward
Hutton East
Decision by
Delegated Decision COND S191/S192
Postcode
CM13 2JD

Timeline

Dates from the published record

  1. 19 Apr 2024

    Received by Brentwood

  2. 14 Jun 2024

    Decision issued: Application Permitted

  3. 21 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Ashby Design LTD Agent, a design practice registered in St. Albans

Liquidation · incorporated 2002 · St. Albans

19 applications on PlanIndex · across 7 councils · 93% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Brentwood granted permission on 14 June 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Larkrise Farm The Tyburns Hutton Brentwood Essex CM13 2JD

    21/00141/NON/1 Submitted 15 Nov 2022 50 yards away

    Non-material amendment to application 21/00141/FUL (Demolition of existing buildings and construction of seven new dwellings (2no 3 bedrooms, 3no 4 bedrooms and 2no 5 bedrooms) with associated landscaping and parking for the amendment of plans to each plot, to improve the residential quality and amenity of the new homes. The amendments will not result in any loss or increase in the number of units and will not result in the increase in volume of the approved units.

    Granted Amendments New dwelling Demolition 17 docs
    Several homes
  • Larkrise Farm The Tyburns Hutton Brentwood Essex CM13 2JD

    21/00141/COND/1 Submitted 27 Mar 2023 50 yards away

    Discharge of conditions 11 (Landscaping Scheme) of application 21/00141/FUL (Demolition of existing buildings and construction of seven new dwellings (2no 3 bedrooms, 3no 4 bedrooms and 2no 5 bedrooms) with associated landscaping and parking).

    Granted Conditions New dwelling Demolition 5 docs
    Several homes
  • 75 Hanging Hill Lane Hutton Essex CM13 2HN

    24/00252/HHA Submitted 29 Feb 2024 200 yards away

    Construction of a new outbuilding.

    Granted Householder 8 docs
    Small domestic
  • 3 Bayleys Mead Hutton Essex CM13 2HL

    24/00545/COND/1 Submitted 19 Sep 2024 200 yards away

    Discharge of condition 5 (Sustainable Drainage) of application 24/00545/HHA (Two storey rear extension, Single storey side extension to extisting garage including converting garge to habitable accomodation, attaching extension to main dwelling and creating new integrated garage at the front of property. New external materials.

    Granted Conditions Extension 2 docs
    Small domestic
  • 3 Bayleys Mead Hutton Essex CM13 2HL

    24/00545/HHA Submitted 13 May 2024 200 yards away

    Two storey rear extension, Single storey side extension to extisting garage including converting garge to habitable accomodation, attaching extension to main dwelling and creating new integrated garage at the front of property. New external materials.

    Granted Householder Extension 9 docs
    Small domestic
  • 10 Bayleys Mead Hutton Essex CM13 2HL

    26/00511/TPO Submitted 14 May 2026 200 yards away

    T1 Oak- Crown Reduction - Reducing the height and spread of the tree by up to 2m, reduction would be back to previous pruning points TPO Number: TPO6/1974

    Granted Trees 4 docs

In Brentwood

  • 26/00365/COND/9 Granted

    Land North Of Shenfield Alexander Lane Shenfield Essex

    Discharge of condition 18 (roofing materials) of application 26/00365/FUL (Variation of condition 2 (approved drawings), removal of condition 41 (Location of bus stop provided prior to occupation in phase 2) and removal of condition 42 (Bus stop to be provided prior to occupation in phase 2) of permission 23/01164/FUL / APP/H1515/W/24/3353271 (Hybrid planning application for 344 units including 35% affordable housing, safeguarded land for a 2FE primary school and early years facility, public open space and associated landscaping, drainage and highways infrastructure.)

    Received 27 Apr, published by the council 23 Jul 2026 Conditions
  • Land North Of Shenfield Alexander Lane Shenfield Essex

    Discharge of condition 17 (details of cladding) of application 26/00365/FUL (Variation of condition 2 (approved drawings), removal of condition 41 (Location of bus stop provided prior to occupation in phase 2) and removal of condition 42 (Bus stop to be provided prior to occupation in phase 2) of permission 23/01164/FUL / APP/H1515/W/24/3353271 (Hybrid planning application for 344 units including 35% affordable housing, safeguarded land for a 2FE primary school and early years facility, public open space and associated landscaping, drainage and highways infrastructure.)

    Received 27 Apr, published by the council 23 Jul 2026 Conditions
  • 23/00012/COND/2 Awaiting decision

    The Brentwood Garden Centre Vicarage Close Brenwood Essex CM14 5GR

    Discharge of Condition 12 (External Lighting Strategy) of application 23/00012/FUL (Change of use of the Site including the demolition of existing buildings and use of the land for storage and distribution (Use Class B8) and erection of a bin store/bike shed; vehicular entrance gate; enhanced landscaping and perimeter fence; parking, and pedestrian footpath on Vicarage Close).

    Received 10 Aug, published by the council 21 Sep 2026 Conditions
  • 24/00986/COND/2 Awaiting decision

    Legh Cottage Horseman Side Navestock Essex RM4 1DN

    Discharge of Condition 12 (Habitat Management and Monitoring Plan and Biodiversity Net Gain Assessment) of application 24/00986/FUL (Demolition of existing building. Construction of two detached dwellings with associated parking and amenity areas).

    Received 10 Aug, published by the council 21 Sep 2026 Conditions
  • 25/01424/COND/1 Granted

    10 Newmans Drive Hutton Essex CM13 2PZ

    Application for Discharge of Condition 4 (tree protection plan) of original application 25/01424/HHA (Increase in ridge height of roof to create first floor to include two dormer windows to front elevation, double storey rear extension with roof windows to side elevations and pitched roof entrance porch to front elevation.)

    Received 12 May, published by the council 23 Jul 2026 Conditions