Skip to content
PlanIndex Get alerts
Menu

Planning application

9 Tudor Gardens, London, NW9 8RL

Granted Brent 26/1602

Works: Extension Demolition Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Proposed demolition and re-building of front porch, alteration to front roof projection, conversi...

As published by the council, reference 26/1602

Application record

Reference
26/1602
Status
Decided
Decision
Granted As published: Permission Granted
Received
24 Jun 2026
Validated
2 Jul 2026
Decided
9 Sep 2026
Ward
Welsh Harp
Decision by
Delegated Team Manager
Postcode
NW9 8RL

Timeline

Dates from the published record

  1. 24 Jun 2026

    Received by Brent

  2. 2 Jul 2026

    Validated

    Checked as complete and ready for consideration.

  3. 25 Jul 2026

    Added to PlanIndex

  4. 9 Sep 2026

    Decision issued: Permission Granted

  5. 10 Sep 2026

    Status changed to Decided

    Previously Registered.

Who's behind it

Company information only, from the register and Companies House

Archimedes Design LTD Agent, a design practice registered in London

Active · incorporated 2016 · London

69 applications on PlanIndex · across 19 councils · 69% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

  • Final delegated report Report · 09 Sep 2026
  • Final decision notice Decision (Public) · 09 Sep 2026
  • Existing and proposed plans and elevations Approved Drawing Plans · 01 Sep 2026
  • Location plan Approved Drawing Plans · 25 Jun 2026
  • Application form Application Form (Public) · 25 Jun 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Brent granted permission on 9 September 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on Brent's portal will say. Our guide explains the common types.

Nearby applications

Within 0.3 miles

  • 15 -17 Tudor Gardens, London, NW9 8RL

    21/2632 Submitted 9 Jul 2021 50 yards away

    Details pursuant to condition 6 (Construction Method Statement) of Full Planning Permission application 18/0192 dated 15/10/2018 for Demolition of existing properties and erection of a two storey building with conversion of loft space comprising 9 self-contained flats (1 x 3 beds + 4 x 2 beds + 4 x 1 beds), provision for car parking, cycle and refuse storage with associated landscaping and alterations to existing vehicular accesses

    Granted Conditions New dwelling Demolition 3 docs
  • 15 & 17 Tudor Gardens, London, NW9 8RL

    21/3238 Submitted 24 Aug 2021 50 yards away

    Details pursuant to condition 8 (materials), 9 (hard and soft landscaping), 10 (boiler details), 11 (vehicle charging points) of Full Planning Permission reference 18/0192 dated 15 October, 2018, for Demolition of existing properties and erection of a two storey building with conversion of loft space comprising 9 self-contained flats (1 x 3 beds + 4 x 2 beds + 4 x 1 beds), provision for car parking, cycle and refuse storage with associated landscaping and alterations to existing vehicular accesses

    Granted Conditions New dwelling Demolition 11 docs
  • 1 Tudor Gardens, London, NW9 8RL

    20/3490 Submitted 28 Oct 2020 50 yards away

    Retention of existing boundary wall and drive way hardstanding, and installation of soft landscaping at the front of detached dwellinghouse.

    Granted Householder 6 docs
    Small domestic
  • 6 Tudor Gardens, London, NW9 8RN

    24/2695 Submitted 24 Sep 2024 50 yards away

    Demolition of existing conservatory and erection of single storey rear extension to the dwellinghouse.

    Granted Householder Extension Demolition 8 docs
    Small domestic
  • 18 Tudor Gardens, London, NW9 8RN

    21/2764 Submitted 17 Jul 2021 50 yards away

    Prior approval for a single storey rear extension to dwellinghouse, in metres: Extending beyond the rear wall of the original house - 6m Maximum height - 4m Eaves height - 3m

    Granted Prior approval Extension 5 docs
    Small domestic
  • 14 Tudor Gardens, London, NW9 8RN

    26/0266 Submitted 3 Feb 2026 50 yards away

    Proposed erection of single storey outbuilding over existing swimming pool, single storey outbuilding as plant room, front porch extension, addition of pitched roof to front projection and alteration to the front boundary walls to the dwellinghouse. (new description)

    Granted Householder Extension 10 docs
    Small domestic