Skip to content
PlanIndex Get alerts
Menu

Planning application

26/1541

Ground Floor Flat, 14 Osborne Road, London, NW2 5DP

Awaiting decision Brent Full Planning Permission

Proposal

Proposed single-storey rear extension to ground floor flat.

As published by the council, reference 26/1541

Timeline

Dates from the published record

  1. 17 Jun 2026

    Received by Brent

  2. 25 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Brent for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 26/1817 Awaiting decision

    Flat 2, 2 Buxton Road, London, NW2 5BJ

    Proposed erection of single-storey rear conservatory extension to ground floor flat

    15 Jul 2026 63m away Full applications
  • 26/0995 Granted

    55 Balmoral Road, London, NW2 5BN

    Proposed single-storey side infill extension to dwellinghouse.

    21 Apr 2026 67m away Householder
  • 26/0674 Refused

    55 Balmoral Road, London, NW2 5BN

    Prior approval for a single storey rear extension to dwellinghouse, in metres: Extending beyond the rear wall of the original house - 5.93m Maximum height - 3m Eaves height - 3m

    16 Mar 2026 67m away Prior approval
  • 26/1635 Awaiting decision

    159 Chapter Road, London, NW2 5LJ

    Proposed replacement of existing single glazed timber framed sash windows to front elevation and single glazed timber sash and casement windows to rear elevations with new double glazed uPVC casement windows to the flats.

    29 Jun 2026 142m away Full applications
  • 24/2060 Granted

    167 Chapter Road, London, NW2 5LJ

    Proposed loft conversion into habitable space, rear dormer extension and installation of 2x front rooflights to dwellinghouse

    25 Jul 2024 142m away Full applications
  • 20/2635 Refused

    26 Kingsley Court, Park Avenue, London, NW2 5TR

    Certificate of lawfulness for replacement of existing windows to second floor flat

    26 Aug 2020 163m away Lawful development

In Brent

  • 26/1435 Granted

    202A Preston Road, Wembley, HA9 8PA

    Proposed rear dormer extension, installation of rooflights and alteration to entryway to the first floor flat.

    9 Jun 2026 Full applications
  • 26/1315 Refused

    1 & 2 Zyad Close, London, NW10 9BB

    Joint application for proposed erection of 1x new storey to roof of 2x existing two-storey dwellinghouses

    25 May 2026 Full applications
  • 26/0820 Granted

    105 Dollis Hill Lane, London, NW2 6HS

    Proposed rear dormer extension, hip to gable roof extension, new pitched roof to first floor and installation of rooflights to the dwellinghouse.

    30 Mar 2026 Full applications
  • 26/0529 Refused

    24 Staverton Road, London, NW2 5HL

    Proposed single-storey rear extension, raised patio decking and outbuilding in the rear garden of the ground floor flat

    1 Mar 2026 Full applications
  • 26/1367 Granted

    69, 71, 73 & 75 Goldsmith Lane, London, NW9 9AR

    Installation of a new rainwater hopper and down pipe to the front elevation of building

    1 Jun 2026 Full applications