Planning application
26/1271
5 Napier Road, Wembley, HA0 4UA
Proposal
Proposed first-floor rear extension, 2x side dormer extensions and conversion of dwellinghouse into 3x self contained flats, including internal alterations, new front porch, 1x front rooflight, associated cycle and refuse storage, alterations to side and rear fenestration, front boundary wall and sub-divison of rear garden
As published by the council, reference 26/1271
Timeline
Dates from the published record
-
19 May 2026
Received by Brent
-
22 May 2026
Validated
Checked as complete and ready for consideration.
-
25 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Brent for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
26/1812 Awaiting decision
14 Napier Road, Wembley, HA0 4UA
Certificate of lawfulness for proposed hip to gable extension, rear dormer window, outrigger extension with 2x front rooflights and Juliet balcony to the dwellinghouse.
-
26/1813 Refused
14 Napier Road, Wembley, HA0 4UA
Prior approval for a single storey rear extension to dwellinghouse, in metres: Extending beyond the rear wall of the original house - 6m Maximum height - 3m Eaves height - 3m
-
20/3762 Granted
2A and 2B Napier Road, Wembley, HA0 4UA
Proposed replacement of all existing single glazed timber sash and casement windows with double glazed, top hung PVCu windows
-
26/1927 Awaiting decision
18 Ranelagh Road, Wembley, HA0 4TP
Details pursuant to condition 7 (Landscaping Plan), of Full Planning Permission application reference 24/3663 dated 07/03/2025 for Proposed conversion into dwellinghouse into 2x self contained flats, sub-division of rear garden and cycle storage and refuse and recycle space to front.
-
26/0991 Refused
18 Ranelagh Road, Wembley, HA0 4TP
Details pursuant to condition 7 (Landscaping Plan), of Full Planning Permission application reference 24/3663 dated 07/03/2025 for Proposed conversion into dwellinghouse into 2x self contained flats, sub-division of rear garden and cycle storage and refuse and recycle space to front.
-
26/1763 Awaiting decision
28 Ranelagh Road, Wembley, HA0 4TP
Certificate of lawfulness for proposed rear dormer window with 2x front rooflights to the dwellinghouse.
Other full applications applications
In Brent
-
26/1435 Granted
202A Preston Road, Wembley, HA9 8PA
Proposed rear dormer extension, installation of rooflights and alteration to entryway to the first floor flat.
-
26/1315 Refused
1 & 2 Zyad Close, London, NW10 9BB
Joint application for proposed erection of 1x new storey to roof of 2x existing two-storey dwellinghouses
-
26/0820 Granted
105 Dollis Hill Lane, London, NW2 6HS
Proposed rear dormer extension, hip to gable roof extension, new pitched roof to first floor and installation of rooflights to the dwellinghouse.
-
26/0529 Refused
24 Staverton Road, London, NW2 5HL
Proposed single-storey rear extension, raised patio decking and outbuilding in the rear garden of the ground floor flat
-
26/1367 Granted
69, 71, 73 & 75 Goldsmith Lane, London, NW9 9AR
Installation of a new rainwater hopper and down pipe to the front elevation of building