Skip to content
PlanIndex Get alerts
Menu

Planning application

22/3729

Uncle Apartments, Park Lane, Wembley, HA9 7RH

Withdrawn Brent Full Planning Permission

Proposal

Proposed change of use of existing ground and basement level Retail space (Use Class: E) of UNCLE Wembley Apartments to ancillary residential communal amenity/fitness space

As published by the council, reference 22/3729

Timeline

Dates from the published record

  1. 31 Oct 2022

    Received by Brent

  2. 2 Nov 2022

    Validated

    Checked as complete and ready for consideration.

  3. 13 Dec 2022

    Decision issued: Withdrawn by Applicant

  4. 2 Aug 2026

    Added to PlanIndex

What withdrawal means

The process from here

The applicant withdrew this application before the council decided it, so it carries no planning weight and no fee refund is automatic. Withdrawal often follows officer feedback that a refusal was likely.

The applicant is free to submit a revised application at any time, and many withdrawn schemes return in amended form, so the site is worth watching if the proposal affected you.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 26/0819 Refused

    8 Park Lane, Wembley, HA9 7RP

    Change of use from dry cleaners to adult gaming centre on ground floor

    30 Mar 2026 61m away Full applications
  • 26/1422 Awaiting decision

    8 Park Lane, Wembley, HA9 7RP

    Proposed change of use of Dry Cleaners at 8 Park Lane into Adult Gaming Centre (ACG) to be joined with the existing ACG at 446 High Road forming one AGC comprising both units

    8 Jun 2026 61m away Full applications
  • 26/0395 Withdrawn

    397A High Road, Wembley, HA9 6AA

    Erection of front boundary fence, retention of existing external terrace with installation of decking and canopies to the front of the premises.

    17 Feb 2026 79m away Full applications
  • 26/0964 Awaiting decision

    399 High Road, Wembley, HA9 6AA

    Proposed change of use from off licence to adult gaming centre and replacement of external air condenser units to the rear elevation.

    17 Apr 2026 79m away Full applications
  • 24/1738 Refused

    367 & Flat 6, 367A High Road, Wembley, HA9 6AA

    Proposed change of use of part of the ground floor from retail unit to convert existing 1 bedroom unit into a 2 bedroom residential unit and alterations to side fenestration and shop front

    21 Jun 2024 79m away Full applications
  • 20/3122 Granted

    377 High Road, Wembley, HA9 6AA

    Installation of 1x internally illuminated fascia sign to front elevation.

    30 Sep 2020 79m away Advertising

In Brent

  • 26/1435 Granted

    202A Preston Road, Wembley, HA9 8PA

    Proposed rear dormer extension, installation of rooflights and alteration to entryway to the first floor flat.

    9 Jun 2026 Full applications
  • 26/1315 Refused

    1 & 2 Zyad Close, London, NW10 9BB

    Joint application for proposed erection of 1x new storey to roof of 2x existing two-storey dwellinghouses

    25 May 2026 Full applications
  • 26/0820 Granted

    105 Dollis Hill Lane, London, NW2 6HS

    Proposed rear dormer extension, hip to gable roof extension, new pitched roof to first floor and installation of rooflights to the dwellinghouse.

    30 Mar 2026 Full applications
  • 26/0529 Refused

    24 Staverton Road, London, NW2 5HL

    Proposed single-storey rear extension, raised patio decking and outbuilding in the rear garden of the ground floor flat

    1 Mar 2026 Full applications
  • 26/1367 Granted

    69, 71, 73 & 75 Goldsmith Lane, London, NW9 9AR

    Installation of a new rainwater hopper and down pipe to the front elevation of building

    1 Jun 2026 Full applications