Skip to content
PlanIndex Get alerts
Menu

Planning application

Heron House, 109-115 Wembley Hill Road, Wembley, HA9 8DA

Granted Brent 21/1659 Conditions pursuant to a full permission

Works: New dwelling Demolition Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Details pursuant to condition 14 (landscaping) of Variation of Conditions reference 19/3915 dated 2 April, 2020, for Variation of condition 2, development built in accordance with approved drawings to allow: Basement footprint reduced with 12 car parking spaces. Bikes numbers remain the same. Refuse provision simplified. Slight changes on the tower volume to the East and North-East face with new external wall build ups. Platform lift and steps added to the northern core entrance. Smoke Extract Riser added to Tower Core . New fire escape stair provided to the basement and lower ground floors Extended corridor at second floor reduced to meet fire regulations Office Refuse and Bikes moved out of the basement to Ground Floor. Double height entrance to the northern core changed to single height entrance. Height of the lower part of the building increased by approximately 1.2m (not the tower). Reconfiguring of internal partitions to provide better layouts and retain the same unit mix. The windows to the South-West Elevation have been enlarged slightly. The balustrades to balconies have been changed from glass to metal. All of the wall thicknesses increased to comply with SAP Calculations and to comply with latest fire regulations for buildings above 18m. of Full Planning Permission reference 16/4156 dated 24 May, 2018, for Demolition of the existing office building (Heron House) and the construction of a new four to seven storey mixed use building comprising 829sqm of commercial office space on the ground floor (Use class B1a), 40 self-contained flats (23 x 1bed, 7 x 2bed and 10 x 3bed) on the upper floors, a basement level for car and cycle parking, bin stores and associated landscaping and amenity space, subject to Deed of Agreement dated 24 May 2018 under Section 106 of the Town and Country Planning Act 1990, and subsequent Deed of Variation dated 01 April 2020.

As published by the council, reference 21/1659

Application record

Reference
21/1659
Type
Conditions pursuant to a full permission
Status
Decided
Decision
Permission Granted
Received
6 May 2021
Validated
6 May 2021
Decided
29 Jun 2021
Ward
Wembley Hill
Decision by
Delegated Team Manager
Postcode
HA9 8DA

Site history

Applications at this address on the Brent register

This site has had 7 applications since 2020: 6 approved, 1 refused.

  • 20/3928 Granted

    Heron House, 109-115 Wembley Hill Road, Wembley, HA9 8DA

    Details pursuant to Condition 13 (External Lighting) of Full Planning Reference 19/3915 dated 5/11/2019 for Variation of condition 2, development built in accordance with approved drawings to allow: Basement footprint reduced with 12 car parking spaces. Bikes numbers remain the same. Refuse provision simplified. Slight changes on the tower volume to the East and North-East face with new external wall build ups. Platform lift and steps added to the northern core entrance. Smoke Extract Riser added to Tower Core . New fire escape stair provided to the basement and lower ground floors Extended corridor at second floor reduced to meet fire regulations Office Refuse and Bikes moved out of the basement to Ground Floor. Double height entrance to the northern core changed to single height entrance. Height of the lower part of the building increased by approximately 1.2m (not the tower). Reconfiguring of internal partitions to provide better layouts and retain the same unit mix. The windows to the South-West Elevation have been enlarged slightly. The balustrades to balconies have been changed from glass to metal. All of the wall thicknesses increased to comply with SAP Calculations and to comply with latest fire regulations for buildings above 18m. of Full Planning Permission reference 16/4156 dated 24 May, 2018, for Demolition of the existing office building (Heron House) and the construction of a new four to seven storey mixed use building comprising 829sqm of commercial office space on the ground floor (Use class B1a), 40 self-contained flats (23 x 1bed, 7 x 2bed and 10 x 3bed) on the upper floors, a basement level for car and cycle parking, bin stores and associated landscaping and amenity space, subject to Deed of Agreement dated 24 May 2018 under Section 106 of the Town and Country Planning Act 1990, and subsequent Deed of Variation dated 01 April 2020.

    Decided 26 Feb 2021 Conditions
  • 20/3588 Granted

    Heron House, 109-115 Wembley Hill Road, Wembley, HA9 8DA

    Details pursuant to condition 17 (construction method statement) of Variation of Conditions reference 19/3915 dated 2 April, 2020, for Variation of condition 2, development built in accordance with approved drawings to allow: Basement footprint reduced with 12 car parking spaces. Bikes numbers remain the same. Refuse provision simplified. Slight changes on the tower volume to the East and North-East face with new external wall build ups. Platform lift and steps added to the northern core entrance. Smoke Extract Riser added to Tower Core . New fire escape stair provided to the basement and lower ground floors Extended corridor at second floor reduced to meet fire regulations Office Refuse and Bikes moved out of the basement to Ground Floor. Double height entrance to the northern core changed to single height entrance. Height of the lower part of the building increased by approximately 1.2m (not the tower). Reconfiguring of internal partitions to provide better layouts and retain the same unit mix. The windows to the South-West Elevation have been enlarged slightly. The balustrades to balconies have been changed from glass to metal. All of the wall thicknesses increased to comply with SAP Calculations and to comply with latest fire regulations for buildings above 18m. of Full Planning Permission reference 16/4156 dated 24 May, 2018, for Demolition of the existing office building (Heron House) and the construction of a new four to seven storey mixed use building comprising 829sqm of commercial office space on the ground floor (Use class B1a), 40 self-contained flats (23 x 1bed, 7 x 2bed and 10 x 3bed) on the upper floors, a basement level for car and cycle parking, bin stores and associated landscaping and amenity space, subject to Deed of Agreement dated 24 May 2018 under Section 106 of the Town and Country Planning Act 1990, and subsequent Deed of Variation dated 01 April 2020.

    Decided 29 Jan 2021 Conditions
  • 20/3541 Refused

    Heron House, 109-115 Wembley Hill Road, Wembley, HA9 8DA

    Details pursuant to condition 16 (external plant noise) of Variation of Conditions reference 19/3915 dated 2 April, 2020, for Variation of condition 2, development built in accordance with approved drawings to allow: Basement footprint reduced with 12 car parking spaces. Bikes numbers remain the same. Refuse provision simplified. Slight changes on the tower volume to the East and North-East face with new external wall build ups. Platform lift and steps added to the northern core entrance. Smoke Extract Riser added to Tower Core. New fire escape stair provided to the basement and lower ground floors Extended corridor at second floor reduced to meet fire regulations Office Refuse and Bikes moved out of the basement to Ground Floor. Double height entrance to the northern core changed to single height entrance. Height of the lower part of the building increased by approximately 1.2m (not the tower). Reconfiguring of internal partitions to provide better layouts and retain the same unit mix. The windows to the South-West Elevation have been enlarged slightly. The balustrades to balconies have been changed from glass to metal. All of the wall thicknesses increased to comply with SAP Calculations and to comply with latest fire regulations for buildings above 18m of Full Planning Permission reference 16/4156 dated 24 May, 2018, for Demolition of the existing office building (Heron House) and the construction of a new four to seven storey mixed use building comprising 829sqm of commercial office space on the ground floor (Use class B1a), 40 self-contained flats (23 x 1bed, 7 x 2bed and 10 x 3bed) on the upper floors, a basement level for car and cycle parking, bin stores and associated landscaping and amenity space, subject to Deed of Agreement dated 24 May 2018 under Section 106 of the Town and Country Planning Act 1990, and subsequent Deed of Variation dated 01 April 2020.

    Decided 15 Jan 2021 Conditions
  • 20/3539 Granted

    Heron House, 109-115 Wembley Hill Road, Wembley, HA9 8DA

    Details pursuant to condition 20 (communal television system/satellite dish) of Variation of Conditions reference 19/3915 dated 2 April, 2020, for Variation of condition 2, development built in accordance with approved drawings to allow: Basement footprint reduced with 12 car parking spaces. Bikes numbers remain the same. Refuse provision simplified. Slight changes on the tower volume to the East and North-East face with new external wall build ups. Platform lift and steps added to the northern core entrance. Smoke Extract Riser added to Tower Core. New fire escape stair provided to the basement and lower ground floors Extended corridor at second floor reduced to meet fire regulations Office Refuse and Bikes moved out of the basement to Ground Floor. Double height entrance to the northern core changed to single height entrance. Height of the lower part of the building increased by approximately 1.2m (not the tower). Reconfiguring of internal partitions to provide better layouts and retain the same unit mix. The windows to the South-West Elevation have been enlarged slightly. The balustrades to balconies have been changed from glass to metal. All of the wall thicknesses increased to comply with SAP Calculations and to comply with latest fire regulations for buildings above 18m of Full Planning Permission reference 16/4156 dated 24 May, 2018, for Demolition of the existing office building (Heron House) and the construction of a new four to seven storey mixed use building comprising 829sqm of commercial office space on the ground floor (Use class B1a), 40 self-contained flats (23 x 1bed, 7 x 2bed and 10 x 3bed) on the upper floors, a basement level for car and cycle parking, bin stores and associated landscaping and amenity space, subject to Deed of Agreement dated 24 May 2018 under Section 106 of the Town and Country Planning Act 1990, and subsequent Deed of Variation dated 01 April 2020.

    Decided 15 Jan 2021 Conditions
  • 20/2142 Granted

    Heron House, 109-115 Wembley Hill Road, Wembley, HA9 8DA

    Details pursuant to condition 10 (remediation strategy) of Variation of Conditions reference 19/3915 dated 2 April, 2020, for Variation of condition 2, development built in accordance with approved drawings to allow: Basement footprint reduced with 12 car parking spaces. Bikes numbers remain the same. Refuse provision simplified. Slight changes on the tower volume to the East and North-East face with new external wall build ups. Platform lift and steps added to the northern core entrance. Smoke Extract Riser added to Tower Core . New fire escape stair provided to the basement and lower ground floors Extended corridor at second floor reduced to meet fire regulations Office Refuse and Bikes moved out of the basement to Ground Floor. Double height entrance to the northern core changed to single height entrance. Height of the lower part of the building increased by approximately 1.2m (not the tower). Reconfiguring of internal partitions to provide better layouts and retain the same unit mix. The windows to the South-West Elevation have been enlarged slightly. The balustrades to balconies have been changed from glass to metal. All of the wall thicknesses increased to comply with SAP Calculations and to comply with latest fire regulations for buildings above 18m. of Full Planning Permission reference 16/4156 dated 24 May, 2018, for Demolition of the existing office building (Heron House) and the construction of a new four to seven storey mixed use building comprising 829sqm of commercial office space on the ground floor (Use class B1a), 40 self-contained flats (23 x 1bed, 7 x 2bed and 10 x 3bed) on the upper floors, a basement level for car and cycle parking, bin stores and associated landscaping and amenity space, subject to Deed of Agreement dated 24 May 2018 under Section 106 of the Town and Country Planning Act 1990, and subsequent Deed of Variation dated 01 April 2020.

    Decided 14 Sep 2020 Conditions
  • 20/1503 Granted

    Heron House, 109-115 Wembley Hill Road, Wembley, HA9 8DA

    Details pursuant to condition 9 (materials) of Variation of Conditions reference 19/3915 dated 2 April, 2020, for Variation of condition 2, development built in accordance with approved drawings to allow: Basement footprint reduced with 12 car parking spaces. Bikes numbers remain the same. Refuse provision simplified. Slight changes on the tower volume to the East and North-East face with new external wall build ups. Platform lift and steps added to the northern core entrance. Smoke Extract Riser added to Tower Core . New fire escape stair provided to the basement and lower ground floors Extended corridor at second floor reduced to meet fire regulations Office Refuse and Bikes moved out of the basement to Ground Floor. Double height entrance to the northern core changed to single height entrance. Height of the lower part of the building increased by approximately 1.2m (not the tower). Reconfiguring of internal partitions to provide better layouts and retain the same unit mix. The windows to the South-West Elevation have been enlarged slightly. The balustrades to balconies have been changed from glass to metal. All of the wall thicknesses increased to comply with SAP Calculations and to comply with latest fire regulations for buildings above 18m. of Full Planning Permission reference 16/4156 dated 24 May, 2018, for Demolition of the existing office building (Heron House) and the construction of a new four to seven storey mixed use building comprising 829sqm of commercial office space on the ground floor (Use class B1a), 40 self-contained flats (23 x 1bed, 7 x 2bed and 10 x 3bed) on the upper floors, a basement level for car and cycle parking, bin stores and associated landscaping and amenity space, subject to Deed of Agreement dated 24 May 2018 under Section 106 of the Town and Country Planning Act 1990, and subsequent Deed of Variation dated 01 April 2020.

    Decided 8 Oct 2020 Conditions

Timeline

Dates from the published record

  1. 6 May 2021

    Received by Brent

  2. 29 Jun 2021

    Decision issued: Permission Granted

  3. 30 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in London

7 applications on PlanIndex · across 2 councils

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Brent granted permission on 29 June 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Heron House, 109-115 Wembley Hill Road, Wembley, HA9 8DA

    20/1503 Submitted 22 May 2020 0m away

    Details pursuant to condition 9 (materials) of Variation of Conditions reference 19/3915 dated 2 April, 2020, for Variation of condition 2, development built in accordance with approved drawings to allow: Basement footprint reduced with 12 car parking spaces. Bikes numbers remain the same. Refuse provision simplified. Slight changes on the tower volume to the East and North-East face with new external wall build ups. Platform lift and steps added to the northern core entrance. Smoke Extract Riser added to Tower Core . New fire escape stair provided to the basement and lower ground floors Extended corridor at second floor reduced to meet fire regulations Office Refuse and Bikes moved out of the basement to Ground Floor. Double height entrance to the northern core changed to single height entrance. Height of the lower part of the building increased by approximately 1.2m (not the tower). Reconfiguring of internal partitions to provide better layouts and retain the same unit mix. The windows to the South-West Elevation have been enlarged slightly. The balustrades to balconies have been changed from glass to metal. All of the wall thicknesses increased to comply with SAP Calculations and to comply with latest fire regulations for buildings above 18m. of Full Planning Permission reference 16/4156 dated 24 May, 2018, for Demolition of the existing office building (Heron House) and the construction of a new four to seven storey mixed use building comprising 829sqm of commercial office space on the ground floor (Use class B1a), 40 self-contained flats (23 x 1bed, 7 x 2bed and 10 x 3bed) on the upper floors, a basement level for car and cycle parking, bin stores and associated landscaping and amenity space, subject to Deed of Agreement dated 24 May 2018 under Section 106 of the Town and Country Planning Act 1990, and subsequent Deed of Variation dated 01 April 2020.

    Granted Conditions New dwelling Demolition +1 5 docs
  • Heron House, 109-115 Wembley Hill Road, Wembley, HA9 8DA

    20/3928 Submitted 30 Nov 2020 0m away

    Details pursuant to Condition 13 (External Lighting) of Full Planning Reference 19/3915 dated 5/11/2019 for Variation of condition 2, development built in accordance with approved drawings to allow: Basement footprint reduced with 12 car parking spaces. Bikes numbers remain the same. Refuse provision simplified. Slight changes on the tower volume to the East and North-East face with new external wall build ups. Platform lift and steps added to the northern core entrance. Smoke Extract Riser added to Tower Core . New fire escape stair provided to the basement and lower ground floors Extended corridor at second floor reduced to meet fire regulations Office Refuse and Bikes moved out of the basement to Ground Floor. Double height entrance to the northern core changed to single height entrance. Height of the lower part of the building increased by approximately 1.2m (not the tower). Reconfiguring of internal partitions to provide better layouts and retain the same unit mix. The windows to the South-West Elevation have been enlarged slightly. The balustrades to balconies have been changed from glass to metal. All of the wall thicknesses increased to comply with SAP Calculations and to comply with latest fire regulations for buildings above 18m. of Full Planning Permission reference 16/4156 dated 24 May, 2018, for Demolition of the existing office building (Heron House) and the construction of a new four to seven storey mixed use building comprising 829sqm of commercial office space on the ground floor (Use class B1a), 40 self-contained flats (23 x 1bed, 7 x 2bed and 10 x 3bed) on the upper floors, a basement level for car and cycle parking, bin stores and associated landscaping and amenity space, subject to Deed of Agreement dated 24 May 2018 under Section 106 of the Town and Country Planning Act 1990, and subsequent Deed of Variation dated 01 April 2020.

    Granted Conditions New dwelling Demolition +1 10 docs
  • Heron House, 109-115 Wembley Hill Road, Wembley, HA9 8DA

    20/3588 Submitted 4 Nov 2020 0m away

    Details pursuant to condition 17 (construction method statement) of Variation of Conditions reference 19/3915 dated 2 April, 2020, for Variation of condition 2, development built in accordance with approved drawings to allow: Basement footprint reduced with 12 car parking spaces. Bikes numbers remain the same. Refuse provision simplified. Slight changes on the tower volume to the East and North-East face with new external wall build ups. Platform lift and steps added to the northern core entrance. Smoke Extract Riser added to Tower Core . New fire escape stair provided to the basement and lower ground floors Extended corridor at second floor reduced to meet fire regulations Office Refuse and Bikes moved out of the basement to Ground Floor. Double height entrance to the northern core changed to single height entrance. Height of the lower part of the building increased by approximately 1.2m (not the tower). Reconfiguring of internal partitions to provide better layouts and retain the same unit mix. The windows to the South-West Elevation have been enlarged slightly. The balustrades to balconies have been changed from glass to metal. All of the wall thicknesses increased to comply with SAP Calculations and to comply with latest fire regulations for buildings above 18m. of Full Planning Permission reference 16/4156 dated 24 May, 2018, for Demolition of the existing office building (Heron House) and the construction of a new four to seven storey mixed use building comprising 829sqm of commercial office space on the ground floor (Use class B1a), 40 self-contained flats (23 x 1bed, 7 x 2bed and 10 x 3bed) on the upper floors, a basement level for car and cycle parking, bin stores and associated landscaping and amenity space, subject to Deed of Agreement dated 24 May 2018 under Section 106 of the Town and Country Planning Act 1990, and subsequent Deed of Variation dated 01 April 2020.

    Granted Conditions New dwelling Demolition +1 12 docs
  • Heron House, 109-115 Wembley Hill Road, Wembley, HA9 8DA

    20/2142 Submitted 20 Jul 2020 0m away

    Details pursuant to condition 10 (remediation strategy) of Variation of Conditions reference 19/3915 dated 2 April, 2020, for Variation of condition 2, development built in accordance with approved drawings to allow: Basement footprint reduced with 12 car parking spaces. Bikes numbers remain the same. Refuse provision simplified. Slight changes on the tower volume to the East and North-East face with new external wall build ups. Platform lift and steps added to the northern core entrance. Smoke Extract Riser added to Tower Core . New fire escape stair provided to the basement and lower ground floors Extended corridor at second floor reduced to meet fire regulations Office Refuse and Bikes moved out of the basement to Ground Floor. Double height entrance to the northern core changed to single height entrance. Height of the lower part of the building increased by approximately 1.2m (not the tower). Reconfiguring of internal partitions to provide better layouts and retain the same unit mix. The windows to the South-West Elevation have been enlarged slightly. The balustrades to balconies have been changed from glass to metal. All of the wall thicknesses increased to comply with SAP Calculations and to comply with latest fire regulations for buildings above 18m. of Full Planning Permission reference 16/4156 dated 24 May, 2018, for Demolition of the existing office building (Heron House) and the construction of a new four to seven storey mixed use building comprising 829sqm of commercial office space on the ground floor (Use class B1a), 40 self-contained flats (23 x 1bed, 7 x 2bed and 10 x 3bed) on the upper floors, a basement level for car and cycle parking, bin stores and associated landscaping and amenity space, subject to Deed of Agreement dated 24 May 2018 under Section 106 of the Town and Country Planning Act 1990, and subsequent Deed of Variation dated 01 April 2020.

    Granted Conditions New dwelling Demolition +1 10 docs
  • Heron House, 109-115 Wembley Hill Road, Wembley, HA9 8DA

    20/3541 Submitted 2 Nov 2020 0m away

    Details pursuant to condition 16 (external plant noise) of Variation of Conditions reference 19/3915 dated 2 April, 2020, for Variation of condition 2, development built in accordance with approved drawings to allow: Basement footprint reduced with 12 car parking spaces. Bikes numbers remain the same. Refuse provision simplified. Slight changes on the tower volume to the East and North-East face with new external wall build ups. Platform lift and steps added to the northern core entrance. Smoke Extract Riser added to Tower Core. New fire escape stair provided to the basement and lower ground floors Extended corridor at second floor reduced to meet fire regulations Office Refuse and Bikes moved out of the basement to Ground Floor. Double height entrance to the northern core changed to single height entrance. Height of the lower part of the building increased by approximately 1.2m (not the tower). Reconfiguring of internal partitions to provide better layouts and retain the same unit mix. The windows to the South-West Elevation have been enlarged slightly. The balustrades to balconies have been changed from glass to metal. All of the wall thicknesses increased to comply with SAP Calculations and to comply with latest fire regulations for buildings above 18m of Full Planning Permission reference 16/4156 dated 24 May, 2018, for Demolition of the existing office building (Heron House) and the construction of a new four to seven storey mixed use building comprising 829sqm of commercial office space on the ground floor (Use class B1a), 40 self-contained flats (23 x 1bed, 7 x 2bed and 10 x 3bed) on the upper floors, a basement level for car and cycle parking, bin stores and associated landscaping and amenity space, subject to Deed of Agreement dated 24 May 2018 under Section 106 of the Town and Country Planning Act 1990, and subsequent Deed of Variation dated 01 April 2020.

    Refused Conditions New dwelling Demolition +1 5 docs
  • Heron House, 109-115 Wembley Hill Road, Wembley, HA9 8DA

    20/3539 Submitted 2 Nov 2020 0m away

    Details pursuant to condition 20 (communal television system/satellite dish) of Variation of Conditions reference 19/3915 dated 2 April, 2020, for Variation of condition 2, development built in accordance with approved drawings to allow: Basement footprint reduced with 12 car parking spaces. Bikes numbers remain the same. Refuse provision simplified. Slight changes on the tower volume to the East and North-East face with new external wall build ups. Platform lift and steps added to the northern core entrance. Smoke Extract Riser added to Tower Core. New fire escape stair provided to the basement and lower ground floors Extended corridor at second floor reduced to meet fire regulations Office Refuse and Bikes moved out of the basement to Ground Floor. Double height entrance to the northern core changed to single height entrance. Height of the lower part of the building increased by approximately 1.2m (not the tower). Reconfiguring of internal partitions to provide better layouts and retain the same unit mix. The windows to the South-West Elevation have been enlarged slightly. The balustrades to balconies have been changed from glass to metal. All of the wall thicknesses increased to comply with SAP Calculations and to comply with latest fire regulations for buildings above 18m of Full Planning Permission reference 16/4156 dated 24 May, 2018, for Demolition of the existing office building (Heron House) and the construction of a new four to seven storey mixed use building comprising 829sqm of commercial office space on the ground floor (Use class B1a), 40 self-contained flats (23 x 1bed, 7 x 2bed and 10 x 3bed) on the upper floors, a basement level for car and cycle parking, bin stores and associated landscaping and amenity space, subject to Deed of Agreement dated 24 May 2018 under Section 106 of the Town and Country Planning Act 1990, and subsequent Deed of Variation dated 01 April 2020.

    Granted Conditions New dwelling Demolition +1 6 docs

In Brent

  • 26/0602 Granted

    114 Wembley Hill Road, Wembley, HA9 8EN

    Details pursuant to condition numbers 8 (construction logistics plan) and 9 (details of cycle storage), of full planning application reference 21/0703 dated 06/08/2021 for Demolition of garage and swimming pool and erection of a two storey dwelling with basement level and partial demolition of fire damaged dwellinghouse (Lodge) and erection of single and two storey extension with basement level and associated landscaping.

    11 Mar 2026 Conditions
  • 26/1156 Granted

    Ex Ujima House, 388 High Road, Wembley, HA9 6AR

    Details pursuant to conditions 29 (surface water network) and 32 (plant noise assessment) of Outline Planning Permission reference 19/3092 dated 5 February, 2021, for Demolition of the existing building and erection of a new building comprising residential floorspace (Use Class C3), flexible workspace with ancillary cafe, associated hard and soft landscaping, wheelchair car parking and cycle parking.

    8 May 2026 Conditions
  • 25/2061 Granted

    Granville Centre, 80 Granville Road, London, NW6 5RA

    Details pursuant to partially discharge (all areas except Block D) condition 25 (management plan) of Variation of Conditions reference 23/2876 dated 20/12/2023, of Full Planning Permission reference 19/2378 dated 23 January, 2020, for Partial demolition of existing structures on site including part of the Granville building, refurbishment of the Granville and Carlton Centres and construction of 3 buildings ranging from one to eight storeys in height, to facilitate the provision of a mixed use development comprising 18 self-contained flats at part 1st - 8th floors and community facilities, offices and workshops at lower ground, ground and part first floors. Works include creation of play areas for the children's centre, nursery and school; additional community and event workspaces, outdoor amenity areas, secure cycle and refuse storage.

    14 Jul 2025 Conditions
  • 26/0481 Granted

    Argenta House, Argenta Way, London, NW10 0AZ

    Details pursuant to the partial discharge of condition 19 (Site Investigation), of Full Planning Permission application reference 25/1355 dated 14/12/2025 for Redevelopment of the site to provide a building containing residential dwellings with commercial unit on ground floor, associated vehicular access, cycle parking spaces, refuse storage, amenity space, landscaping and associated works. Subject to a Legal Agreement made under Section 106 of the Town and Country Planning Act 1990 (as amended) dated the 4th December 2025.

    25 Feb 2026 Conditions
  • 25/3337 Granted

    Keelers Service Centre, 707 Harrow Road, Wembley, HA0 2LL

    Details pursuant to conditions 9b (verification report), 13 (landscaping) and 14 (satellite dishes) of Variation of Conditions reference 24/2828 dated 12 August, 2025, for Variation of condition 2, development built in accordance with approved drawings to allow: Amendments to the internal layout including an increased size basement with an additional staircase; Amendments to the proposed unit mix including an additional dwelling located on the 5th floor; Relocation of and increased quantum of cycle storage provision; Amendments to the overall quantum and provision of private external amenity space; Amendments to the elevational treatment including additional canopies at ground floor level and revised window details and balcony rails; Removal of rooftop PV panels and sedum roof and the installation of 4x Air Source Heat Pumps; and, Amendments to the layout of the public realm; of Full Planning Permission reference 18/3069 (as amended by 24/0313) (revised description) for Demolition of existing M.O.T testing centre and erection of a part 5 and part 6 storey mixed use building comprising office (Use class B1) at ground floor, residential units on the 1st to 5th floors, plant room in basement; PV panels at roof level, cycle parking and waste storage (revised description), subject to Deed of Agreement dated 10 February 2020 and a Deed of Variation dated 5th August 2025 under Section 106 of the Town and Country Planning Act 1990, as amended.

    1 Dec 2025 Conditions