Planning application
Harlesden Christian Centre & Land next to and rear of Harlesden Christian Centre, Winchelsea Road, London
Works: New dwelling Demolition
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Details pursuant to condition 22 (verification report) of Full Planning Permission reference 16/0760 dated 2 May, 2017, for Redevelopment of the site and surrounding land to include the demolition of the existing centre (Use class D1) and construction of five residential blocks ranging from 1 to 6 storeys high, comprising 178 residential units (67 x 1-bed, 60 x 2-bed flats, 24 x 2-bed maisonettes,14 x 3-bed flats, 3 x 4-bed maisonettes, 8 x 3-bed houses and 2 x 4-bed houses) with associated private and communal amenity space, parking, access, landscaping and ancillary works (as amended) and subject to a Deed of Agreement dated 26 April 2017 under Section 106 of the Town and Country Planning Act 1990, as amended
As published by the council, reference 20/3641
Application record
- Reference
- 20/3641
- Type
- Conditions pursuant to a full permission
- Status
- Decided
- Decision
- Granted As published: Permission Granted
- Received
- 9 Nov 2020
- Validated
- 9 Nov 2020
- Decided
- 18 Feb 2021
- Ward
- Stonebridge
- Decision by
- Delegated Team Manager
Timeline
Dates from the published record
-
9 Nov 2020
Received by Brent
-
18 Feb 2021
Decision issued: Permission Granted
-
2 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
HTA Design LLP Agent, a design practice registered in London
Active · incorporated 2013 · London
109 applications on PlanIndex · across 22 councils · 97% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
4 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Brent granted permission on 18 February 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Other condition discharge and variation applications
In Brent
-
26/2298 Awaiting decision
7 Melbury Road, Harrow, HA3 9RA
Details pursuant to condition 10 (Construction Method Statement), of Full Planning permission reference 26/1352 dated 14/08/2026 for Proposed works to existing dwelling to include the demolition of existing shed, erection of a single storey rear extension, hip to gable end roof extension, rear dormer, installation of 2x front rooflights and the proposed erection of a two-storey dwelling to adjoin No.7 Melbury Road. Associated landscaping alterations, cycle and refuse storage.
-
26/2286 Awaiting decision
1-6 Ashford House, Ashford Road, London, NW2 6TL
Details pursuant to conditions 6 (landscaping) and 8 (construction logistics plan) of Full Planning Permission reference 24/0749 dated 29 July, 2024, for Roof extension including dormer windows with associated rooflights to create a self-contained flat in the roof space and provision of cycle parking and bin store at ground floor.
-
26/2207 Awaiting decision
Land adjacent to Northwick Park Hospital, Nightingale Avenue, London, HA1 3GX
Details pursuant to partially discharge condition 43 (whole life carbon assessment) of Full Planning Permission reference 20/0701 dated 16 March, 2023, for Full planning permission for demolition of existing buildings and structures on the site, all site preparation works for a residential led mixed-use development comprising new homes, associated car and cycle spaces, a replacement nursery, commercial space, associated highways improvements, open space, hard and soft landscaping and public realm works subject to a deed of agreement under Section 106 of the Town and Country Planning Act dated the 16th of March 2023.
-
26/2206 Awaiting decision
Ex Ujima House, 388 High Road, Wembley, HA9 6AR
Details pursuant to condition 23 (permissive path for pedestrians and cyclists) of Outline Planning Permission reference 19/3092 dated 5 February, 2021, for Demolition of the existing building and erection of a new building comprising residential floorspace (Use Class C3), flexible workspace with ancillary cafe, associated hard and soft landscaping, wheelchair car parking and cycle parking.
-
26/0602 Granted
114 Wembley Hill Road, Wembley, HA9 8EN
Details pursuant to condition numbers 8 (construction logistics plan) and 9 (details of cycle storage), of full planning application reference 21/0703 dated 06/08/2021 for Demolition of garage and swimming pool and erection of a two storey dwelling with basement level and partial demolition of fire damaged dwellinghouse (Lodge) and erection of single and two storey extension with basement level and associated landscaping.