Planning application
20/2999
205 Preston Road, Wembley, HA9 8NF
Proposal
Change of use to hot food take-away (Use Class Sui Generis) and installation of extraction ducting to rear
As published by the council, reference 20/2999
Timeline
Dates from the published record
-
23 Sep 2020
Received by Brent
-
2 Nov 2020
Validated
Checked as complete and ready for consideration.
-
21 Dec 2020
Decision issued: Permission Refused
-
25 Jul 2026
Added to PlanIndex
What refusal means
The process from here
The council refused this application for the reasons set out on the decision notice, which the council portal holds in full. Only the applicant can appeal a refusal; the time limit runs from the decision date and is shorter for householder schemes.
Refusal does not prevent a fresh attempt. Applicants often address the reasons for refusal and resubmit, so a refused scheme is not necessarily the end of proposals for the site.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
26/1435 Granted
202A Preston Road, Wembley, HA9 8PA
Proposed rear dormer extension, installation of rooflights and alteration to entryway to the first floor flat.
-
20/2268 Granted
North Wembley Telephone Exchange, Carlton Avenue East, Wembley, HA9 8LU
Proposed removal of glazing from eight windows. Windows x3 on the ground floor south elevation, windows x3 on the first-floor east elevation and two windows on the second-floor east elevation.Windows x5 on the east elevation replaced with aluminium acoustic louvres,the three windows on the south elevation (Front) will be tackled differently, as this is the front facade of the building, we will only be removing the glazing from these windows and leaving the window frame intact. The acoustic louvres will be installed on the internal side of the window. These louvres will be powder coated black to telephone exchange
-
20/1037 Granted
46 Elmstead Avenue, Wembley, HA9 8NX
Certificate of lawfulness for proposed hip to gable loft conversion with rear dormer window and door, insertion of TWO(2) rooflights to the front elevation, removal of chimney and relocation of TWO(2) SVPs, insertion of one window at gable end side of dwellinghouse.
-
21/0140 Granted
59 Elmstead Avenue, Wembley, HA9 8NS
Prior approval for a single storey rear extension to dwellinghouse, in metres: Extending beyond the rear wall of the original house - 5.50m Maximum height - 3m Eaves height - 2.80m
-
20/2814 Refused
53 Elmstead Avenue, Wembley, HA9 8NS
Certificate of lawfulness for proposed removal of existing rear dormer, loft conversion with rear dormer window and two front rooflights to dwellinghouse.
-
21/0671 Refused
59 Elmstead Avenue, Wembley, HA9 8NS
Prior approval for a single storey rear extension to dwellinghouse, in metres: Extending beyond the rear wall of the original house - 5.50m Maximum height - 3m Eaves height - 3m
Other full applications applications
In Brent
-
26/1435 Granted
202A Preston Road, Wembley, HA9 8PA
Proposed rear dormer extension, installation of rooflights and alteration to entryway to the first floor flat.
-
26/1315 Refused
1 & 2 Zyad Close, London, NW10 9BB
Joint application for proposed erection of 1x new storey to roof of 2x existing two-storey dwellinghouses
-
26/0820 Granted
105 Dollis Hill Lane, London, NW2 6HS
Proposed rear dormer extension, hip to gable roof extension, new pitched roof to first floor and installation of rooflights to the dwellinghouse.
-
26/0529 Refused
24 Staverton Road, London, NW2 5HL
Proposed single-storey rear extension, raised patio decking and outbuilding in the rear garden of the ground floor flat
-
26/1367 Granted
69, 71, 73 & 75 Goldsmith Lane, London, NW9 9AR
Installation of a new rainwater hopper and down pipe to the front elevation of building