Skip to content
PlanIndex Get alerts
Menu

Planning application

20/0066/TELN

Telecommunications Masts, Queens Park Community School, Aylestone Avenue, London, NW6 7BQ

Granted Brent Tel Notification

Proposal

Notification under the Electronic Communications Code Regulations 2003 to Utilise Permitted Development Rights for removal and replacement of 3No. Existing antennas with 3No. Upgraded antennas affixed to existing support poles on the rooftop, the installation of 1No. GPS unit located on an antenaa support pole and ancillary development thereto.

As published by the council, reference 20/0066/TELN

Timeline

Dates from the published record

  1. 4 Nov 2020

    Received by Brent

  2. 25 Nov 2020

    Decision issued: Telecom - approval not required

  3. 25 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About this record

Reading the register

This page mirrors an entry on the statutory planning register that Brent is required to keep. The published feed for this record does not state which type of application it is, which is common for older entries and for some council systems; the register entry on the council portal will say, alongside the case officer and any consultation dates.

Every planning application follows the same broad path: submission, validation, publicity, then a decision by officers or committee. Our guide to planning application types explains the common types and what each can approve.

Nearby applications

Within 500 metres

  • 26/1119 Refused

    Queens Park Community School, Aylestone Avenue, London, NW6 7BQ

    Variation of condition 4 (artificial turf pitch operating hours) to allow Extended closing times of the school pitch until 10pm Monday to Friday, 9pm Saturdays and 8pm Sundays and Bank Holidays of Full Planning Permission application reference 20/1411 dated 11th February 2022 for Construction of an artificial turf pitch, ball stop fencing with access gates, acoustic all weather timber fence, flood lighting units 2 x double floodlights on the half way masts and single floodlights at each of the 4 corner masts (mounted onto 6 steel columns) and a dry pond detention basin and earth bund in a designated area within the school grounds

    5 May 2026 0m away Amendments
  • 26/0867 Awaiting decision

    14 Mount Pleasant Road, London, NW10 3EL

    Proposed erection of boundary wall, a bin store, pedestrian and vehicular access gates, associated hard and soft landscaping to front garden (revised description)

    2 Apr 2026 180m away Householder
  • 20/3793 Granted

    38 Mount Pleasant Road, London, NW10 3EL

    Prior approval for a single storey rear extension to dwellinghouse, in metres: Extending beyond the rear wall of the original house - 6m Maximum height - 3m Eaves height - 2.8m

    19 Nov 2020 180m away Prior approval
  • 26/1303 Awaiting decision

    50 Mount Pleasant Road, London, NW10 3EL

    Proposed alteration to roof height of single-storey side-to-rear extensions and erection of single-storey infill extension with green roof to dwellinghouse

    22 May 2026 180m away Householder
  • 20/2971 Granted

    38 Mount Pleasant Road, London, NW10 3EL

    Certificate of lawfulness for proposed loft conversion with rear and side dormers and installation of rooflights to dwellinghouse.

    21 Sep 2020 180m away Lawful development
  • 26/1049 Granted

    10 Mount Pleasant Road, London, NW10 3EL

    Certificate of lawfulness for proposed conversion of existing garage into a habitable room, including replacement of garage door with a window to the front elevation, single storey side infill extension and the installation of new doors to the side wall of the existing rear lean storage to the dwellinghouse.

    27 Apr 2026 180m away Lawful development