Planning application
Block 1 To 9 Ripleyville Estate Tiley Square Bradford West Yorkshire
Relates to 22/04116/VOC
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Non material amendment to planning permission 22/04116/VOC: Variation to Condition 23 for the allowance for phased handover of plots
As published by the council, reference 22/04116/NMA05
Application record
- Reference
- 22/04116/NMA05
- Status
- Granted
- Decision
- Granted
- Validated
- 1 Jul 2026
- Decided
- 10 Aug 2026
Site history
Applications at this address on the Bradford register
This site has had 3 applications since 2021: 3 approved, 0 refused.
-
22/04116/VOC Granted
Block 1 To 9 Ripleyville Estate Tiley Square Bradford West Yorkshire
Amendments to the previously approved scheme (Ref: 21/04368/MAF) to incorporate changes to the configuration of the dwellings, the proposed terracing of the site, materials relating to the construction of the dwellings and the landscaping
-
21/04368/MAF Granted
Block 1 To 9 Ripleyville Estate Tiley Square Bradford West Yorkshire
Demolition of the existing properties and replace with a high quality residential scheme (Use Class C3) comprising of 73 new dwellings, with a maximum height of 3 storeys, along with associated access parking and landscape
Timeline
Dates from the published record
-
1 Jul 2026
Validated
Checked as complete and ready for consideration.
-
10 Aug 2026
Decision issued: Granted
-
11 Aug 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
-
22/04116/VOC Granted
Block 1 To 9 Ripleyville Estate Tiley Square Bradford West Yorkshire
Amendments to the previously approved scheme (Ref: 21/04368/MAF) to incorporate changes to the configuration of the dwellings, the proposed terracing of the site, materials relating to the construction of the dwellings and the landscaping
What this grant of permission means
Bradford granted permission on 10 August 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on Bradford's portal will say. Our guide explains the common types.