Skip to content
PlanIndex Get alerts
Menu

Planning application

21/04927/FUL

Fairmount Nursing Home 10 Nab Wood Drive Shipley West Yorkshire BD18 4EJ

Granted Bradford Full Planning Permission

Proposal

Demolition of nursing home and construction of eight assisted living retirement homes (Use Class C2) and associated works, including improvements to outdoor facilities and minor alterations to Brookfield Care Home

As published by the council, reference 21/04927/FUL

Timeline

Dates from the published record

  1. 3 Oct 2021

    Received by Bradford

  2. 25 Nov 2021

    Decision issued: Granted

  3. 22 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 21/05683/HOU Refused

    22 West Way Shipley West Yorkshire BD18 4HW

    Two-storey side and rear extension (resubmission of 21/04814/HOU)

    10 Nov 2021 127m away Householder
  • 21/04814/HOU Refused

    22 West Way Shipley West Yorkshire BD18 4HW

    Two storey side and part two/part single storey rear extension

    20 Sep 2021 127m away Householder
  • 26/01600/TPO Awaiting decision

    14 Nab Lane Shipley West Yorkshire BD18 4HJ

    T1 (Beech) - Crown thin by 20% to reduce the wind sail and the lever effect regarding the base stem structure. Remove crossing and rubbing branches. T2 (Norway Maple) - Reduce the lateral spread on northern and eastern sides of the crown to appropriate growth points (in accordance with BS:3998) to give 2m clearance from the property. T3 (Lime) - Remove the deadwood. T4 (Beech) - Reduce the lateral spread on the northern and eastern sides to appropriate growth points (in accordance with BS:3998) to give 2m clearance from the property and alleviate weight of lean. Have the cavity inspected (probed) whilst the pruning works are undertaken. T5 (Sycamore) - Reduce the lateral spread on southern and western sides to appropriate growth points (in accordance with BS:3998) to give 2m clearance from the property. Remove the deadwood. T6 (Sycamore) - Crown thin by 20% focusing particularly on the competing new growth in the upper crown. Reduce the eastern primary limbs to appropriate growth points (in accordance with BS:3998) by 2m to reduce the tip weight and mechanical leverage.

    26 May 2026 196m away Trees
  • 21/05072/TPO Granted

    8 Nab Lane Shipley West Yorkshire BD18 4EH

    T1, T2 Oak - Crown lift to give approx 3m ground clearance and pull back to give approx 2m clearance from building T3, T4 Oak - Crown lift to give approx 5m ground clearance over Staveley Road T5, T6, T7 Sycamore - Crown lift to give approx 5m ground clearance over Staveley Road T9, T10, T11, T12 - Crown lift to give approx 5m ground clearance over Nab Lane

    4 Oct 2021 223m away Trees
  • 21/05479/TPO Granted

    Naismith House 6A Nab Lane Shipley West Yorkshire

    T8 Oak - Crown lift to give approx 3m ground clearance and pull back to give approx 2m clearance from the property

    4 Oct 2021 249m away Trees
  • 25/00226/FUL Awaiting decision

    Land Adjacent To 37 Nab Wood Crescent Shipley West Yorkshire BD18 4HX

    Construction of detached dwelling

    10 Mar 2025 275m away Full applications

In Bradford

  • 26/02636/FUL Awaiting decision

    Fern Cottage 39 Otley Road Charlestown Baildon West Yorkshire BD17 7JP

    Change of use of existing kennels (sui generis) to office use (Class E(g)(i)) and change of use of existing office accommodation (Class E(g)(i)) to café use (Class E(b)), including associated internal alterations and ancillary works.

    28 Jul 2026 Full applications
  • 26/01478/FUL Refused

    11 - 13 Cutler Heights Lane Bradford West Yorkshire BD4 9JR

    Creation of additional 2 HMO units to existing 10 bed HMO and construction of front and rear dormer windows

    17 Jun 2026 Full applications
  • 26/02680/FUL Awaiting decision

    Rainbow Primary Leadership Academy Nelson Street Bradford West Yorkshire BD5 0HD

    Removal of existing turf area including edging/retaining features and replacement with hardstanding finished in tarmac

    27 Jul 2026 Full applications
  • 26/02674/FUL Awaiting decision

    The Bothy 55 Otley Road Shipley West Yorkshire BD18 3PY

    Replacement shopfront and stallriser

    27 Jul 2026 Full applications
  • 26/01377/FUL Refused

    The Branwell 1 Cross Roads Keighley West Yorkshire BD22 9BG

    Conversion of basement to health spa (Use Class E), conversion of first floor and loft office spaces to create two residential flats (Use Class C3) and construction of ground floor level balcony

    18 May 2026 Full applications