Planning application
Dummy Address Time Square Market Street Bracknell Berkshire
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
The Proposed Development that will be the subject of an application for Development Consent is subject to scheme evolution and consultation in the usual manner but is currently envisaged, in summary, to comprise: - A new marine facility consisting of a two-berth jetty for the handling of automotive roll on- roll off (Ro-Ro) cargo and dredged pocket to enable vessels to be suitably accommodated; - Landside terminal space; - A new terminal access road from the new facility to the A326 and possible modifications to the existing rail facilities at SGL; - Environmental enhancements, including new habitat, habitat enhancement and landscape improvements (on and off-site); and - New and improved public recreation provision and improved public access between the settlements of Hythe and Marchwood.
As published by the council, reference 25/00694/OBS
Application record
- Reference
- 25/00694/OBS
- Type
- Adjoining Authority Consultation
- Status
- Recommendation Made
- Decision
- Granted As published: Permitted
- Received
- 11 Nov 2025
- Validated
- 11 Nov 2025
- Ward
- Town Centre & The Parks
- Parish
- Bracknell Town Council
- Decision by
- Delegated Decision
Timeline
Dates from the published record
-
11 Nov 2025
Received by Bracknell Forest
-
27 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
2 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Bracknell Forest granted permission, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Other outline applications
In Bracknell Forest
-
25/00746/OUT Refused
Land To The West Of Locks Ride Locks Ride Ascot Berkshire
Outline planning permission with matters of Scale, Layout and Access for the construction of care home (Class C2), sheltered housing (Class C3), supported housing (Class C3), self-build housing (Class C3), family and lifetime homes (Class C3) together with community centre (Class E(d)), shop (Class E(a)) and health centre (Class E(e)) with associated car parking.
-
PA/2026/0831 Awaiting decision
MURRELL HILL GRANGE, MURRELL HILL LANE, BINFIELD, BRACKNELL, RG42 4BY
Outline application for the demolition of the single dwellinghouse and ancillary buildings at Murrell Hill Grange; the erection of up to 160 homes (including affordable homes); provision of Suitable Alternative Natural Greenspace; the creation of a new vehicular access onto Murrell Hill Lane; and the provision of a pedestrian access, open space, landscaping, SuDS, and other associated infrastructure. All matters reserved except for access.
-
26/00027/OUT Withdrawn
Land Adjacent To 1 And 2 Lower Church Road Lower Church Road Sandhurst GU47 8HW
Outline planning application for change of use of paddock to residential and erection of 8 dwellings (all matters reserved except for access and layout).
-
25/00417/OUT Granted
Land Adjoining Crouch Lane Farm Crouch Lane Winkfield Windsor SL4 4RZ
Outline application including access and scale for proposed stable building.
-
25/00679/OUT Granted
Ranelagh Farm Crouch Lane Winkfield Windsor SL4 4TN
Outline Application with all matters reserved except scale for the demolition of existing equestrian buildings and replacement with new commercial equestrian buildings.