Planning application
P/26/02919/FUL
Baiter Skatepark Harbourside Park Newfoundland Drive Poole BH15 1UZ
Proposal
Replacement of the existing wheeled sports facility at Baiter Park, including removal of existing skate features, youth shelter and redundant hardstanding, and installation of new concrete ramps and features over retained and improved tarmac surfacing. The proposal also includes associated soft landscaping to integrate new level changes, together with provision of informal seating, bins, cycle parking and tree planting. Existing access, parking, drainage and lighting will be retained. (Regulation 3)
As published by the council, reference P/26/02919/FUL
Timeline
Dates from the published record
-
22 Jun 2026
Received by Bournemouth, Christchurch and Poole
-
26 Jun 2026
Validated
Checked as complete and ready for consideration.
-
31 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Bournemouth, Christchurch and Poole for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
P/26/03344/TCA Awaiting decision
13 Park Lake Road Poole BH15 1TR
T1- Poplar Tree- Pollard- Pollard above old pruning points. Tree work had been carried out previously. Tree maintenance
-
P/26/03343/TCA Awaiting decision
14 Park Lake Road Poole BH15 1TR
T1- Willow Tree- Carry out 5m reduction around Willow tree on selected branches, Mature Willow tree that has been reduced previously. New growth is now failing and reducing crown will reduce risk of future failures.
Other full applications applications
In Bournemouth, Christchurch and Poole
-
P/26/00154/FUL Granted
Premier Inn Sterte Avenue West Poole BH15 2BD
Demolition of existing hotel restaurant and replacement with new building providing additional hotel bedrooms and breakfast room, together with alterations to the car park and all associated works.
-
P/25/04824/FUL Granted
36A Bargates Christchurch BH23 1QL
Retrospective application for conversion of part of first floor office (Use Class B1(a)) to a self contained one bedroom residential unit (Class C3)
-
P/26/03574/FUL Awaiting decision
3 Adastral Square Poole BH17 8SA
Extract system to rear of property
-
P/26/02051/FUL Granted
13 Snowdon Road Bournemouth BH4 9HL
Retrospective single storey log cabin in rear garden for use as a short-term holiday let between 1st April and 30th September, sleeping a maximum of 2 guests.
-
7-2024-29061-A Granted
426-432 Holdenhurst Road Bournemouth BH8 9AA
Redevelopment of the site to provide residential accommodation of 20 flats (use class C3): including landscaping, refuse storage, cycle storage and other associated infrastructure.