Planning application
P/26/01677/FUL
298 - 304 Charminster Road Bournemouth BH8 9RU
Proposal
Two-storey roof extension and a four-storey rear extension with associated bin and cycle stores
As published by the council, reference P/26/01677/FUL
Timeline
Dates from the published record
-
14 Apr 2026
Received by Bournemouth, Christchurch and Poole
-
8 May 2026
Validated
Checked as complete and ready for consideration.
-
17 Jul 2026
Decision issued: Granted
-
31 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
P/26/01895/FUL Awaiting decision
225 Charminster Road Bournemouth BH8 9QJ
Partial Demolition, Extension and Alterations to Existing Building to Erect a 2-Bed Dwellinghouse with Associated Parking and Landscaping
-
P/25/00769/FUL Awaiting decision
160 Hankinson Road Bournemouth BH9 1HX
Change of Use of Ground Floor to 1-Bed Residential Flat with Associated Bin & Cycle Storage and Resin-Bound Surface Upgrade
-
P/26/03305/CONDR Awaiting decision
360 Charminster Road Bournemouth BH8 9RX
Variation of condition 3 (Permitted Hours) of planning permission 7-2024-20305-D (Change of use from restaurant (Use Class E) to a mixed restaurant and takeaway (sui generis). ) to allow an increase in opening hours of 09.00hrs to 00.00hrs - Thursday to Saturday.
-
P/26/02558/TTPO Awaiting decision
22 St Albans Crescent Bournemouth BH8 9AS
T1 - Beech - Reduce the lateral spread towards the dwelling by up to 2.5m back to suitable growth points.
-
P/26/01175/FUL Refused
3 Richmond Park Avenue Bournemouth BH8 9DL
Proposed conversion of existing property to 4no. flats, works to include a single storey rear extension, hip to gable extensions, rear dormer extension, double front dormer window, landscaping, bin store and cycle store to front along with widened dropped kerb.
-
P/26/03152/PNHH Awaiting decision
385 Charminster Road Bournemouth BH8 9QT
Single storey rear extension which would extend beyond the rear wall of the original detached dwelling house by 6.00 metres, for which the maximum height would be 3.00 metres and for which the height at the eaves would be 3.00 metres.
Other full applications applications
In Bournemouth, Christchurch and Poole
-
P/26/00154/FUL Granted
Premier Inn Sterte Avenue West Poole BH15 2BD
Demolition of existing hotel restaurant and replacement with new building providing additional hotel bedrooms and breakfast room, together with alterations to the car park and all associated works.
-
P/25/04824/FUL Granted
36A Bargates Christchurch BH23 1QL
Retrospective application for conversion of part of first floor office (Use Class B1(a)) to a self contained one bedroom residential unit (Class C3)
-
P/26/03574/FUL Awaiting decision
3 Adastral Square Poole BH17 8SA
Extract system to rear of property
-
P/26/02051/FUL Granted
13 Snowdon Road Bournemouth BH4 9HL
Retrospective single storey log cabin in rear garden for use as a short-term holiday let between 1st April and 30th September, sleeping a maximum of 2 guests.
-
7-2024-29061-A Granted
426-432 Holdenhurst Road Bournemouth BH8 9AA
Redevelopment of the site to provide residential accommodation of 20 flats (use class C3): including landscaping, refuse storage, cycle storage and other associated infrastructure.