Planning application
Richmond Arms Hotel 153 Charminster Road Bournemouth BH8 8UH
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
New Miradol pergola and Installation of 2no. external TV monitors in the rear beer garden inc. 65-inch TV unit under new Miradol pergola and freestanding 96-inch TV enclosed in a housing on timber posts.
As published by the council, reference P/26/01416/FUL
Application record
- Reference
- P/26/01416/FUL
- Type
- Full Planning Permission
- Status
- Application Approved
- Decision
- Granted
- Received
- 30 Mar 2026
- Validated
- 7 Apr 2026
- Decided
- 2 Jun 2026
- Ward
- Talbot & Branksome Woods
- Parish
- Bournemouth Town Council
- Decision by
- Delegated
- Postcode
- BH8 8UH
Timeline
Dates from the published record
-
30 Mar 2026
Received by Bournemouth, Christchurch and Poole
-
7 Apr 2026
Validated
Checked as complete and ready for consideration.
-
2 Jun 2026
Decision issued: Granted
-
13 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
18 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
153 Charminster Road Bournemouth BH8 8UH
Advertisement consent for the Installation of 1x projecting sign, 2x fascia signs, 1x door plaque, 1x menu case, 2x amenity boards, 1x vinyl house number and 2x post mounted correx signs
Granted Advertising 8 docs -
12 Belvedere Road Bournemouth BH3 7LB
Side extension to a ground floor flat
Granted Full applications Extension 8 docs -
55 Ground Floor Flat Kings Road Bournemouth BH3 7LE
Single storey rear and side extension (retrospective)
Granted Full applications Extension 7 docsSmall domestic -
31 Kings Road Bournemouth BH3 7LD
Lawful Development Certificate for existing use of a House in Multiple Occupation (Sui Generis HMO) for more than 10 years
Decided Lawful development 6 docs -
168 Alma Road Bournemouth BH9 1AJ
Demolition of existing conservatory and alterations and enlargement of existing rear extension to include a flat roof with two rooflights
Granted Householder Extension Loft or dormer +1 14 docsSmall domestic -
Flats 1- 4 Bakers Court 200 Alma Road Bournemouth BH9 1AJ
Replacement of windows and communal front door.
Granted Full applications Windows or glazing 8 docs
Other full applications applications
In Bournemouth, Christchurch and Poole
-
P/26/01726/FUL Granted
Royal Bournemouth Hospital Castle Lane East Bournemouth BH7 7DW
Installation of a Portakabin Building system to be used as a remote site welfare unit for ambulance crews. Involves 6 Ambulance parking bays with Vehicle shorelines and hatching.
-
P/26/04285/FUL Awaiting decision
117-119 Oakwood House West Hill Road Bournemouth BH2 5PH
Proposed replacement flat roof and lantern
-
P/26/03038/FUL Granted
140A Stewart Road Bournemouth BH8 8NX
New dormer window to new loft extension
-
P/26/03029/FUL Granted
13 Bure Lane Christchurch BH23 4DJ
Demolition of the existing dwelling and construction of a replacement house with associated parking
-
P/26/04204/FUL Awaiting decision
92-94 Castle Lane West Bournemouth BH9 3JU
Alterations to the first floor to replace a window with a glazed door and form a balcony to the main building (Part retrospective)