Skip to content
PlanIndex Get alerts
Menu

Planning application

329-331 Holdenhurst Road Bournemouth BH8 8BT

Granted Bournemouth, Christchurch and Poole P/26/01096/FUL Full Planning Permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Divide one ground floor retail unit to 2 units and install new shopfronts

As published by the council, reference P/26/01096/FUL

Application record

Reference
P/26/01096/FUL
Type
Full Planning Permission
Status
Application Approved
Decision
Granted
Received
11 Mar 2026
Validated
2 Apr 2026
Decided
8 Jun 2026
Ward
East Cliff & Springbourne
Decision by
Delegated
Postcode
BH8 8BT

Timeline

Dates from the published record

  1. 11 Mar 2026

    Received by Bournemouth, Christchurch and Poole

  2. 2 Apr 2026

    Validated

    Checked as complete and ready for consideration.

  3. 8 Jun 2026

    Decision issued: Granted

  4. 12 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

17 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 347-349 Holdenhurst Road Bournemouth BH8 8BS

    P/25/04618/ADV Submitted 10 Nov 2025 114m away

    Erection of an illuminated small format advertising display

    Refused Advertising 12 docs
  • 29 Garfield Avenue Bournemouth BH1 4QT

    P/26/02693/CLP Submitted 11 Jun 2026 131m away

    Lawful Development Certificate for proposed Loft conversion, with rear dormer. Roof light to front elevation and associated internal works. Installation of solar panels

    Decided Lawful development Loft or dormer 8 docs
  • Breath Of Life Church St Mary's Road Bournemouth BH1 4QP

    P/26/03236/LB Submitted 13 Jul 2026 230m away

    89% historically approved · decision due ~10 Sep

    Listed Building Consent for internal alterations associated with the removal of modern internal partitions (including existing mezzanine); provision of a ground floor office; and erection of 2 mezzanines with staircases to provide first floor function spaces either side of the central.

    Awaiting decision Heritage and listed buildings 53 docs
  • 1 St Mary's Road Bournemouth BH1 4QP

    P/26/00660/CLE Submitted 16 Feb 2026 230m away

    Lawful Development Certificate for existing use - The property has been in continuous use as a House in Multiple Occupation (HMO) for a period exceeding 10 years. The lawful use relates to the entire residential dwelling, including all internal bedrooms, shared kitchen facilities, shared bathroom/WC facilities, circulation areas and associated residential amenities.

    Decided Lawful development 5 docs
    Domestic
  • 89 Victoria Road Bournemouth BH1 4RS

    P/26/03951/HOU Submitted 17 Aug 2026 231m away

    88% historically approved · decision due ~12 Oct

    Single storey rear extension

    Awaiting decision Householder Extension 3 docs
    Small domestic
  • Firkin Shed 279 Holdenhurst Road Bournemouth BH8 8BZ

    P/26/01318/CONDR Submitted 24 Mar 2026 237m away

    Variation of condition 3 and removal of conditions 2 and 5 of planning permission 7-2014-11039-C Change of Use from Shop Class A1 to Drinking Establishment Class A4 To change condition 3 to The hours of operation shall be controlled by the premises licence.

    Granted Amendments 10 docs

In Bournemouth, Christchurch and Poole

  • P/26/01726/FUL Granted

    Royal Bournemouth Hospital Castle Lane East Bournemouth BH7 7DW

    Installation of a Portakabin Building system to be used as a remote site welfare unit for ambulance crews. Involves 6 Ambulance parking bays with Vehicle shorelines and hatching.

    16 Apr 2026 Full applications
  • P/26/04285/FUL Awaiting decision

    117-119 Oakwood House West Hill Road Bournemouth BH2 5PH

    Proposed replacement flat roof and lantern

    4 Sep 2026 Full applications
  • P/26/03038/FUL Granted

    140A Stewart Road Bournemouth BH8 8NX

    New dormer window to new loft extension

    30 Jun 2026 Full applications
  • P/26/03029/FUL Granted

    13 Bure Lane Christchurch BH23 4DJ

    Demolition of the existing dwelling and construction of a replacement house with associated parking

    30 Jun 2026 Full applications
  • P/26/04204/FUL Awaiting decision

    92-94 Castle Lane West Bournemouth BH9 3JU

    Alterations to the first floor to replace a window with a glazed door and form a balcony to the main building (Part retrospective)

    1 Sep 2026 Full applications