Skip to content
PlanIndex Get alerts
Menu

Planning application

54A Balena Close Poole BH17 7DY

Granted Bournemouth, Christchurch and Poole P/26/00526/FUL Full Planning Permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Change of Use use of the unit within a B2 classification which will allow for Motor Vehicle Repairs with Ancillary MOT Facility

As published by the council, reference P/26/00526/FUL

Application record

Reference
P/26/00526/FUL
Type
Full Planning Permission
Status
Application Approved
Decision
Granted
Received
9 Feb 2026
Validated
11 Feb 2026
Decided
7 Apr 2026
Ward
Creekmoor
Decision by
Delegated
Postcode
BH17 7DY

Timeline

Dates from the published record

  1. 9 Feb 2026

    Received by Bournemouth, Christchurch and Poole

  2. 11 Feb 2026

    Validated

    Checked as complete and ready for consideration.

  3. 7 Apr 2026

    Decision issued: Granted

  4. 12 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

13 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Innovation Park Technology Road Poole BH17 7DA

    P/25/04431/FUL Submitted 29 Oct 2025 129m away

    Erection of one industrial unit (Use Class B2 – General Industrial) with associated access, parking, cycle storage, and installation of roof-mounted solar photovoltaic panels

    Granted Full applications 18 docs
  • 60 Creekmoor Lane Poole BH17 7BT

    P/26/03859/REG14 Submitted 12 Aug 2026 217m away

    96% historically approved · decision due ~7 Oct

    Deadwood - Remove

    Awaiting decision Trees
  • Opposite 45A Creekmoor Lane Poole BH17 7BW

    P/25/05141/REG14 Submitted 11 Dec 2025 235m away

    Oak - Fell 3 Dead Stems. One stem is leaning over adjacent road, posing potential risk to public safety.

    Granted Trees 2 docs
  • Siemens plc, Sopers Lane, Poole, BH17 7ER

    P/25/03284/BNG Submitted 28 Aug 2025 316m away

    Application to discharge the statutory biodiversity gain condition as required by paragraph 13 of Schedule 7A to the Town and Country Planning Act 1990 relating toapplication no. APP/24/00811/F

    Granted Conditions 30 docs
  • Siemens Plc, Sopers Lane, Poole, BH17 7ER

    P/26/00813/NMA Submitted 24 Feb 2026 316m away

    Non-material amendment following approval of APP/24/00811/F to show roof mounted PV panels and plant equipment and elevation information regarding the yard plant enclosure all to suit operational need (Unit 1)

    Granted Amendments 7 docs
  • 27 Borley Road Poole BH17 7DT

    P/26/00323/TTPO Submitted 26 Jan 2026 321m away

    T1 - Oak- Fell

    Granted Trees 5 docs

In Bournemouth, Christchurch and Poole

  • P/26/01726/FUL Granted

    Royal Bournemouth Hospital Castle Lane East Bournemouth BH7 7DW

    Installation of a Portakabin Building system to be used as a remote site welfare unit for ambulance crews. Involves 6 Ambulance parking bays with Vehicle shorelines and hatching.

    16 Apr 2026 Full applications
  • P/26/04285/FUL Awaiting decision

    117-119 Oakwood House West Hill Road Bournemouth BH2 5PH

    Proposed replacement flat roof and lantern

    4 Sep 2026 Full applications
  • P/26/03038/FUL Granted

    140A Stewart Road Bournemouth BH8 8NX

    New dormer window to new loft extension

    30 Jun 2026 Full applications
  • P/26/03029/FUL Granted

    13 Bure Lane Christchurch BH23 4DJ

    Demolition of the existing dwelling and construction of a replacement house with associated parking

    30 Jun 2026 Full applications
  • P/26/04204/FUL Awaiting decision

    92-94 Castle Lane West Bournemouth BH9 3JU

    Alterations to the first floor to replace a window with a glazed door and form a balcony to the main building (Part retrospective)

    1 Sep 2026 Full applications