Skip to content
PlanIndex Get alerts
Menu

Planning application

Christian Science Reading Room 85 Commercial Road Poole BH14 0JD

Granted Bournemouth, Christchurch and Poole P/26/00500/FUL Full Planning Permission

Works: Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Removal of existing brick and aluminium shop front at ground floor level and installation of new timber glazed shop front with integrated parcel drop box and new external paving and ramp to entrance

As published by the council, reference P/26/00500/FUL

Application record

Reference
P/26/00500/FUL
Type
Full Planning Permission
Status
Application Approved
Decision
Granted
Received
5 Feb 2026
Validated
5 Feb 2026
Decided
26 Mar 2026
Ward
Parkstone
Decision by
Delegated
Postcode
BH14 0JD

Timeline

Dates from the published record

  1. 5 Feb 2026

    Received by Bournemouth, Christchurch and Poole

  2. 26 Mar 2026

    Decision issued: Granted

  3. 12 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 95 Commercial Road Poole BH14 0JD

    P/26/01813/ADV Submitted 21 Apr 2026 0m away

    Advertisement Consent for installation of a new fascia sign

    Granted Advertising 5 docs
  • 145 Commercial Road Poole BH14 0JD

    P/26/03556/FUL Submitted 28 Jul 2026 0m away

    76% historically approved · decision due ~25 Sep

    Installation of a fixed external decking area on the public highway immediately outside the premises, including an access ramp and tempered-glass safety barriers with aluminium supports.

    Awaiting decision Full applications 11 docs
  • 135B Commercial Road Poole BH14 0JD

    P/25/04852/ADV Submitted 25 Nov 2025 0m away

    Retrospective advertisement consent for Low Light RGB multi-colour LED display board.

    Refused Advertising 8 docs
  • 147-149 Commercial Road Parkstone Poole BH14 0JD

    P/25/03430/CONDR Submitted 4 Sep 2025 0m away

    Variation of condition 4 of planning application APP/19/00172/C change in opening hours

    Granted Amendments 8 docs
  • 57 Parr Street Poole BH14 0JX

    P/26/01552/TCA Submitted 7 Apr 2026 83m away

    T1 Pine Crown reduction of approximately 2.0–3.0 metres (circa 15–20%),

    Granted Trees 7 docs
  • 19 Parr Street Poole BH14 0JX

    P/26/03402/FUL Submitted 20 Jul 2026 83m away

    76% historically approved · decision due ~17 Sep

    Remove timber forecourt structure and construct new boundary treatment consisting of low brick walls with metal railings over. Replace existing timber decking and paving slabs with permeable block pavers

    Awaiting decision Full applications 12 docs

In Bournemouth, Christchurch and Poole

  • P/26/01726/FUL Granted

    Royal Bournemouth Hospital Castle Lane East Bournemouth BH7 7DW

    Installation of a Portakabin Building system to be used as a remote site welfare unit for ambulance crews. Involves 6 Ambulance parking bays with Vehicle shorelines and hatching.

    16 Apr 2026 Full applications
  • P/26/04285/FUL Awaiting decision

    117-119 Oakwood House West Hill Road Bournemouth BH2 5PH

    Proposed replacement flat roof and lantern

    4 Sep 2026 Full applications
  • P/26/03038/FUL Granted

    140A Stewart Road Bournemouth BH8 8NX

    New dormer window to new loft extension

    30 Jun 2026 Full applications
  • P/26/03029/FUL Granted

    13 Bure Lane Christchurch BH23 4DJ

    Demolition of the existing dwelling and construction of a replacement house with associated parking

    30 Jun 2026 Full applications
  • P/26/04204/FUL Awaiting decision

    92-94 Castle Lane West Bournemouth BH9 3JU

    Alterations to the first floor to replace a window with a glazed door and form a balcony to the main building (Part retrospective)

    1 Sep 2026 Full applications