Planning application
40A Grafton Road Bournemouth BH3 7JS
Works: Extension Roofing Windows or glazing Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Replace existing open porch & canopy with enclose porch of brick construction with pitched slate roof. Glazed entrance door to front with side windows together with windows to both upper sides.
As published by the council, reference P/26/00351/FUL
Application record
- Reference
- P/26/00351/FUL
- Type
- Full Planning Permission
- Status
- Application Approved
- Decision
- Granted
- Received
- 26 Jan 2026
- Validated
- 25 Mar 2026
- Decided
- 19 May 2026
- Ward
- Talbot & Branksome Woods
- Decision by
- Delegated
- Postcode
- BH3 7JS
Timeline
Dates from the published record
-
26 Jan 2026
Received by Bournemouth, Christchurch and Poole
-
25 Mar 2026
Validated
Checked as complete and ready for consideration.
-
19 May 2026
Decision issued: Granted
-
12 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
8 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
45 Fortescue Road Bournemouth BH3 7JU
Lawful Development Certificate for existing use of a C4 House in Multiple Occupation (HMO) for more than 10 years
Decided Lawful development 5 docs -
7 Fortescue Road Bournemouth BH3 7JT
Lawful Development Certificate for existing use of a C4 House in Multiple Occupation (HMO) for more than 10 years
Decided Lawful development 5 docs -
126 Alma Road Bournemouth BH9 1AL
89% historically approved · decision due ~16 Oct
Lawful Development Certificate for existing use as a larger House in Multiple Occupation
Awaiting decision Lawful development 3 docs -
1 Alington Road Bournemouth BH3 7JX
Alterations to an existing HMO including a rear single storey extension, a rear and side dormer, new rooflights and increasing the total of bedrooms to 13.
Granted Full applications Extension Loft or dormer 29 docsSmall domestic -
31 Kings Road Bournemouth BH3 7LD
Lawful Development Certificate for existing use of a House in Multiple Occupation (Sui Generis HMO) for more than 10 years
Decided Lawful development 6 docs -
35 Heron Court Road Bournemouth BH9 1DE
Lawful Development Certificate for existing use of a C4 House in Multiple Occupation (HMO) for more than 10 years
Decided Lawful development 6 docs
Other full applications applications
In Bournemouth, Christchurch and Poole
-
P/26/01726/FUL Granted
Royal Bournemouth Hospital Castle Lane East Bournemouth BH7 7DW
Installation of a Portakabin Building system to be used as a remote site welfare unit for ambulance crews. Involves 6 Ambulance parking bays with Vehicle shorelines and hatching.
-
P/26/04285/FUL Awaiting decision
117-119 Oakwood House West Hill Road Bournemouth BH2 5PH
Proposed replacement flat roof and lantern
-
P/26/03038/FUL Granted
140A Stewart Road Bournemouth BH8 8NX
New dormer window to new loft extension
-
P/26/03029/FUL Granted
13 Bure Lane Christchurch BH23 4DJ
Demolition of the existing dwelling and construction of a replacement house with associated parking
-
P/26/04204/FUL Awaiting decision
92-94 Castle Lane West Bournemouth BH9 3JU
Alterations to the first floor to replace a window with a glazed door and form a balcony to the main building (Part retrospective)