Skip to content
PlanIndex Get alerts
Menu

Planning application

8 Vale Road Bournemouth BH1 3SY

Granted Bournemouth, Christchurch and Poole P/25/04899/FUL Full Planning Permission

Works: Extension Loft or dormer Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Alterations to include a single storey rear extension, re-siting of the rear door, a rear dormer extension, change from a 7 bedroom to a 9 bedroom House in Multiple Occupation (Sui Generis) and erection of cycle store

As published by the council, reference P/25/04899/FUL

Application record

Reference
P/25/04899/FUL
Type
Full Planning Permission
Status
Application Approved
Decision
Granted
Received
27 Nov 2025
Validated
2 Dec 2025
Decided
16 Feb 2026
Ward
East Cliff & Springbourne
Decision by
Delegated
Postcode
BH1 3SY

Timeline

Dates from the published record

  1. 27 Nov 2025

    Received by Bournemouth, Christchurch and Poole

  2. 2 Dec 2025

    Validated

    Checked as complete and ready for consideration.

  3. 16 Feb 2026

    Decision issued: Granted

  4. 12 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

28 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Bethany Church Of England Junior School Knole Road Bournemouth BH1 4DJ

    P/26/01356/REG14 Submitted 25 Mar 2026 65m away

    1x sycamore - failing bifurcation - remove single stem

    Granted Trees 2 docs
  • Bethany Church Of England Junior School Knole Road Bournemouth BH1 4DJ

    P/26/02609/TTPO Submitted 5 Jun 2026 65m away

    T1 - Silver Birch - Pruning will be carried out to raise the canopies to 3m above ground level and back from the building to create a 2m horizontal separation from the building footprint. T2 Norway Maple - Fell. This is a mature tree which has been growing along the boundary line. T3 - Oak - Pruning will be carried out to raise the canopies to 3m above ground level and back from the building to create a 2m horizontal separation from the building footprint. T4 Norway Maple - Fell. The tree has a significant structural defect within a co-dominant stem growing at the base of the tree and overhanging the school property. T5 Holly - Fell. To be removed due to its poor form and significant decline in condition.

    Withdrawn Trees
  • Bethany Church Of England Junior School Knole Road Bournemouth BH1 4DJ

    P/26/03055/REG14 Submitted 1 Jul 2026 65m away

    Cypress - Dead - Fell

    Granted Trees 2 docs
  • 29 Vale Road Bournemouth BH1 3SX

    P/25/05184/TTPO Submitted 15 Dec 2025 166m away

    T1. Sycamore - Remove and reduce branches by up to 2m to give a clearance of 2m from the building.

    Granted Trees 4 docs
  • Floris Court 15 Knole Road Bournemouth BH1 4DH

    P/25/04300/TTPO Submitted 23 Oct 2025 170m away

    T1 Sweet chestnut - Reduce branches above the driveway by 2m T2 Lime - Remove low branch above pavement back to its source (amended proposal) T3 Beech - Remove regrowth facing the building to maintain a 2m separation (amended proposal)

    Granted Trees 3 docs
  • 68 Drummond Road Bournemouth BH1 4DT

    P/26/00441/CLE Submitted 2 Feb 2026 228m away

    Lawful development certificate for existing additional flat (second floor level) with associated access and internal alterations seeking a determination that the flat was substantially completed at least four years before 20 November 2025

    Decided Lawful development 6 docs

In Bournemouth, Christchurch and Poole

  • P/26/01726/FUL Granted

    Royal Bournemouth Hospital Castle Lane East Bournemouth BH7 7DW

    Installation of a Portakabin Building system to be used as a remote site welfare unit for ambulance crews. Involves 6 Ambulance parking bays with Vehicle shorelines and hatching.

    16 Apr 2026 Full applications
  • P/26/04285/FUL Awaiting decision

    117-119 Oakwood House West Hill Road Bournemouth BH2 5PH

    Proposed replacement flat roof and lantern

    4 Sep 2026 Full applications
  • P/26/03038/FUL Granted

    140A Stewart Road Bournemouth BH8 8NX

    New dormer window to new loft extension

    30 Jun 2026 Full applications
  • P/26/03029/FUL Granted

    13 Bure Lane Christchurch BH23 4DJ

    Demolition of the existing dwelling and construction of a replacement house with associated parking

    30 Jun 2026 Full applications
  • P/26/04204/FUL Awaiting decision

    92-94 Castle Lane West Bournemouth BH9 3JU

    Alterations to the first floor to replace a window with a glazed door and form a balcony to the main building (Part retrospective)

    1 Sep 2026 Full applications