Planning application
8 Vale Road Bournemouth BH1 3SY
Works: Extension Loft or dormer Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Alterations to include a single storey rear extension, re-siting of the rear door, a rear dormer extension, change from a 7 bedroom to a 9 bedroom House in Multiple Occupation (Sui Generis) and erection of cycle store
As published by the council, reference P/25/04899/FUL
Application record
- Reference
- P/25/04899/FUL
- Type
- Full Planning Permission
- Status
- Application Approved
- Decision
- Granted
- Received
- 27 Nov 2025
- Validated
- 2 Dec 2025
- Decided
- 16 Feb 2026
- Ward
- East Cliff & Springbourne
- Decision by
- Delegated
- Postcode
- BH1 3SY
Timeline
Dates from the published record
-
27 Nov 2025
Received by Bournemouth, Christchurch and Poole
-
2 Dec 2025
Validated
Checked as complete and ready for consideration.
-
16 Feb 2026
Decision issued: Granted
-
12 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
28 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Bethany Church Of England Junior School Knole Road Bournemouth BH1 4DJ
1x sycamore - failing bifurcation - remove single stem
Granted Trees 2 docs -
Bethany Church Of England Junior School Knole Road Bournemouth BH1 4DJ
T1 - Silver Birch - Pruning will be carried out to raise the canopies to 3m above ground level and back from the building to create a 2m horizontal separation from the building footprint. T2 Norway Maple - Fell. This is a mature tree which has been growing along the boundary line. T3 - Oak - Pruning will be carried out to raise the canopies to 3m above ground level and back from the building to create a 2m horizontal separation from the building footprint. T4 Norway Maple - Fell. The tree has a significant structural defect within a co-dominant stem growing at the base of the tree and overhanging the school property. T5 Holly - Fell. To be removed due to its poor form and significant decline in condition.
Withdrawn Trees -
Bethany Church Of England Junior School Knole Road Bournemouth BH1 4DJ
Cypress - Dead - Fell
Granted Trees 2 docs -
29 Vale Road Bournemouth BH1 3SX
T1. Sycamore - Remove and reduce branches by up to 2m to give a clearance of 2m from the building.
Granted Trees 4 docs -
Floris Court 15 Knole Road Bournemouth BH1 4DH
T1 Sweet chestnut - Reduce branches above the driveway by 2m T2 Lime - Remove low branch above pavement back to its source (amended proposal) T3 Beech - Remove regrowth facing the building to maintain a 2m separation (amended proposal)
Granted Trees 3 docs -
68 Drummond Road Bournemouth BH1 4DT
Lawful development certificate for existing additional flat (second floor level) with associated access and internal alterations seeking a determination that the flat was substantially completed at least four years before 20 November 2025
Decided Lawful development 6 docs
Other full applications applications
In Bournemouth, Christchurch and Poole
-
P/26/01726/FUL Granted
Royal Bournemouth Hospital Castle Lane East Bournemouth BH7 7DW
Installation of a Portakabin Building system to be used as a remote site welfare unit for ambulance crews. Involves 6 Ambulance parking bays with Vehicle shorelines and hatching.
-
P/26/04285/FUL Awaiting decision
117-119 Oakwood House West Hill Road Bournemouth BH2 5PH
Proposed replacement flat roof and lantern
-
P/26/03038/FUL Granted
140A Stewart Road Bournemouth BH8 8NX
New dormer window to new loft extension
-
P/26/03029/FUL Granted
13 Bure Lane Christchurch BH23 4DJ
Demolition of the existing dwelling and construction of a replacement house with associated parking
-
P/26/04204/FUL Awaiting decision
92-94 Castle Lane West Bournemouth BH9 3JU
Alterations to the first floor to replace a window with a glazed door and form a balcony to the main building (Part retrospective)