Planning application
Coach House To the rear of 579–581 Wimborne Road Bournemouth BH9 2AR
Works: Extension Domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Extension and conversion of existing Coach House to form 1no. self-contained dwelling with associated bin and cycle storage.
As published by the council, reference P/25/04744/FUL
Application record
- Reference
- P/25/04744/FUL
- Type
- Full Planning Permission
- Status
- Application Approved
- Decision
- Granted
- Received
- 17 Nov 2025
- Validated
- 24 Nov 2025
- Decided
- 13 Mar 2026
- Ward
- Winton East
- Decision by
- Delegated
- Postcode
- BH9 2AR
Timeline
Dates from the published record
-
17 Nov 2025
Received by Bournemouth, Christchurch and Poole
-
24 Nov 2025
Validated
Checked as complete and ready for consideration.
-
13 Mar 2026
Decision issued: Granted
-
12 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
15 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
579 - 581 Wimborne Road Bournemouth BH9 2AR
76% historically approved · decision due ~13 Oct
2 storey side extension and internal alterations to retain the ground floor shop and form 1 residential flat and a 6 bedroom HMO with associated bin store and cycle storage
Awaiting decision Full applications Extension 9 docs -
637-645 Wimborne Road Bournemouth BH9 2AR
Outline Planning Permission with some matters reserved for the demolition of existing buildings and erection of a residential apartment building comprising 11no. flats and 1no. detached dwelling (Use Class C3) with associated cycle parking (revised scheme)
Granted Outline New dwelling Demolition 31 docsMajor scheme -
637-645 Wimborne Road Bournemouth BH9 2AR
89% historically approved · decision due ~21 Oct
Approval of Reserved Matters for landscaping in relation to Outline submission P/25/03172/OUT. No EIA.
Awaiting decision Reserved matters 4 docs -
579-581 Wimborne Road Bournemouth BH9 2AR
2 storey side extension and internal alterations to retain the ground floor shop and form 1 residential flat and a 6 bedroom HMO with associated bin store and cycle storage
Withdrawn Full applications Extension 19 docs -
Coach House To the rear of 579–581 Wimborne Road Bournemouth BH9 2AR
Non-material amendment following approval of P/25/04744/FUL for internal layout refinements, change to fenestration and approved window arrangements, retention of an existing first floor side elevation window opening at a reduced scale and Inclusion of roof-mounted solar photovoltaic panels
Granted Amendments Windows or glazing 5 docs -
Rear part of Ground Floor 692 Wimborne Road Winton BH9 2EG
76% historically approved · decision due ~21 Jul
Conversion of rear part of ground floor Commercial space (Class E) to provide a studio flat (C3 Use) with associated bin and cycle storage.
Awaiting decision Full applications 11 docs
Other full applications applications
In Bournemouth, Christchurch and Poole
-
P/26/01726/FUL Granted
Royal Bournemouth Hospital Castle Lane East Bournemouth BH7 7DW
Installation of a Portakabin Building system to be used as a remote site welfare unit for ambulance crews. Involves 6 Ambulance parking bays with Vehicle shorelines and hatching.
-
P/26/04285/FUL Awaiting decision
117-119 Oakwood House West Hill Road Bournemouth BH2 5PH
Proposed replacement flat roof and lantern
-
P/26/03038/FUL Granted
140A Stewart Road Bournemouth BH8 8NX
New dormer window to new loft extension
-
P/26/03029/FUL Granted
13 Bure Lane Christchurch BH23 4DJ
Demolition of the existing dwelling and construction of a replacement house with associated parking
-
P/26/04204/FUL Awaiting decision
92-94 Castle Lane West Bournemouth BH9 3JU
Alterations to the first floor to replace a window with a glazed door and form a balcony to the main building (Part retrospective)