Skip to content
PlanIndex Get alerts
Menu

Planning application

Jewson 79 Ringwood Road Poole BH14 0RA

Granted Bournemouth, Christchurch and Poole P/25/04725/FUL Full Planning Permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Refurbishment and reconfiguration of existing builders’ merchant (sui generis) comprising external works to 2no. existing warehouses, new yard layout including revised external storage arrangements including storage racking, revised car parking and servicing and associated works.

As published by the council, reference P/25/04725/FUL

Application record

Reference
P/25/04725/FUL
Type
Full Planning Permission
Status
Application Approved
Decision
Granted
Received
17 Nov 2025
Validated
17 Nov 2025
Decided
23 Jan 2026
Ward
Newtown & Heatherlands
Decision by
Delegated
Postcode
BH14 0RA

Timeline

Dates from the published record

  1. 17 Nov 2025

    Received by Bournemouth, Christchurch and Poole

  2. 23 Jan 2026

    Decision issued: Granted

  3. 12 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

16 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Unit 4a Beta Centre 262-268 Ringwood Road Poole BH14 0RS

    P/26/01325/FUL Submitted 24 Mar 2026 94m away

    First floor extension to office building, conversion to 2 units, installation of cladding and formation of additional car parking spaces

    Granted Full applications Extension 11 docs
    Several homes
  • 55 Hermitage Road Poole BH14 0QG

    P/26/03561/REG14 Submitted 27 Jul 2026 168m away

    96% historically approved · decision due ~21 Sep

    Deadwood removal - Booked Friday

    Awaiting decision Trees
  • 69-71 Pottery Business Park Ringwood Road Poole BH14 0RG

    P/26/01367/CONDR Submitted 26 Mar 2026 194m away

    75% historically approved · decision due ~25 May

    Variation of Conditions 2 (Approved Plans), 3 (Drainage), 4 (Footpath Widening), 6 (Site Layout), 7 (Build Out Dropped Crossing), 10 (Cycle Parking Details), 11 (Parking Details Operatives), 12 (EV Charging Points), 13 (DEMP & CEMP), 14 (Contamination) 17 (Materials), 19 (Landscaping Materials), 20 (Renewables), 22 (Biodiversity) of planning permission APP/22/00200/F (Redevelopment of the site to provide E(g), B2 and B8 units, and new food takeaway facility (Sui Generis).) to add a phasing plan and subsequently refer to phasing/groups of buildings etc. in conditions where relevant, to remove irrelevant plans, to provide greater scope for location of biodiversity enhancements, and to amend conditions to make it clear that demolition is excluded from being considered prior to commencement, is considered.

    Awaiting decision Amendments Demolition 80 docs
  • 18 Dunstans Lane Poole BH15 3NQ

    P/25/04113/TTPO Submitted 13 Oct 2025 211m away

    T1 - Oak - Reduce the overextended stem/crown by approximately 2 metres and remove deadwood throughout the crown. T2 - Oak - Remove deadwood throughout the crown

    Granted Trees 8 docs
  • Land Adj 18 Dunstans Lane Poole BH15 3NQ

    P/26/00814/TTPO Submitted 24 Feb 2026 211m away

    T1 - Oak - Reduce the overextended stem/crown by approximately 2 metres to alleviate end-weight and pressure on the branch union, and remove deadwood throughout the crown. T2 - Oak - Remove deadwood throughout the crown.

    Granted Trees 8 docs
  • Land rear of 16 and 18 Dunstans Lane Poole BH15 3NQ

    P/26/02798/TTPO Submitted 16 Jun 2026 211m away

    G1 - Line of 2-3 Lawson Cypress (nearest clump to the house) - Fell the nearest tree, leaving the stump at fence level, Reduce the remainder by 8m.

    Granted Trees 5 docs
    Small domestic

In Bournemouth, Christchurch and Poole

  • P/26/01726/FUL Granted

    Royal Bournemouth Hospital Castle Lane East Bournemouth BH7 7DW

    Installation of a Portakabin Building system to be used as a remote site welfare unit for ambulance crews. Involves 6 Ambulance parking bays with Vehicle shorelines and hatching.

    16 Apr 2026 Full applications
  • P/26/04285/FUL Awaiting decision

    117-119 Oakwood House West Hill Road Bournemouth BH2 5PH

    Proposed replacement flat roof and lantern

    4 Sep 2026 Full applications
  • P/26/03038/FUL Granted

    140A Stewart Road Bournemouth BH8 8NX

    New dormer window to new loft extension

    30 Jun 2026 Full applications
  • P/26/03029/FUL Granted

    13 Bure Lane Christchurch BH23 4DJ

    Demolition of the existing dwelling and construction of a replacement house with associated parking

    30 Jun 2026 Full applications
  • P/26/04204/FUL Awaiting decision

    92-94 Castle Lane West Bournemouth BH9 3JU

    Alterations to the first floor to replace a window with a glazed door and form a balcony to the main building (Part retrospective)

    1 Sep 2026 Full applications