Skip to content
PlanIndex Get alerts
Menu

Planning application

Flat 1 15 Ravine Road Poole BH13 7HT

Granted Bournemouth, Christchurch and Poole P/25/04667/FUL Full Planning Permission

Works: Extension Windows or glazing Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of single storey side extension, raise existing flat roof, erection of new boundary fencing/walling , alterations to fenestration, alterations to existing wall and roof finishes, installation of an air source heat pump on top of the flat roof of the single storey rear extension.

As published by the council, reference P/25/04667/FUL

Application record

Reference
P/25/04667/FUL
Type
Full Planning Permission
Status
Application Approved
Decision
Granted
Received
13 Nov 2025
Validated
13 Nov 2025
Decided
14 Jan 2026
Ward
Canford Cliffs
Decision by
Delegated
Postcode
BH13 7HT

Timeline

Dates from the published record

  1. 13 Nov 2025

    Received by Bournemouth, Christchurch and Poole

  2. 14 Jan 2026

    Decision issued: Granted

  3. 12 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

14 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 23 Ravine Road Poole BH13 7HT

    P/26/01537/HOU Submitted 7 Apr 2026 0m away

    Demolition of existing double garage and erection of a larger garage with room above with Juliet balcony

    Granted Householder Demolition 14 docs
    Domestic
  • Canford Cliffs Village Hall 17 Ravine Road Poole BH13 7HT

    P/25/04427/TTPO Submitted 29 Oct 2025 0m away

    T1 Scots Pine Fell to ground level as the tree has a severe lean on south west side and leans towards the main road.

    Refused Trees 10 docs
  • Flat 1 15 Ravine Road Poole BH13 7HT

    P/25/04668/DCONS Submitted 13 Nov 2025 0m away

    Erection of single storey side extension, raise existing flat roof, erection of new boundary fencing/walling , alterations to fenestration, alterations to existing wall and roof finishes, installation of an air source heat pump on top of the flat roof of the single storey rear extension.

    Withdrawn Heritage and listed buildings Extension Windows or glazing 11 docs
    Small domestic
  • 21 Ravine Road Poole BH13 7HT

    P/25/05286/FUL Submitted 19 Dec 2025 0m away

    Alterations to existing dwelling, sever the plot and erect a detached dwelling with associated access boundary treatments.

    Granted Full applications New dwelling 25 docs
    Domestic
  • 15 Ravine Road Poole BH13 7HT

    P/25/03914/TCA Submitted 2 Oct 2025 0m away

    T1 - Smaller sycamore - Fell. T2 - Larger sycamore - Fell. T3 - Yew tree - Fell.

    Granted Trees 8 docs
  • 26 Ravine Road Poole BH13 7HY

    P/26/02707/TTPO Submitted 11 Jun 2026 62m away

    T1 - Red Oak-Removal of long over extended lateral limb/branches. T2 - Holm Oak - Reduce back northern canopy over roof line by 1-2 meters into existing canopy line.

    Granted Trees 6 docs

In Bournemouth, Christchurch and Poole

  • P/26/01726/FUL Granted

    Royal Bournemouth Hospital Castle Lane East Bournemouth BH7 7DW

    Installation of a Portakabin Building system to be used as a remote site welfare unit for ambulance crews. Involves 6 Ambulance parking bays with Vehicle shorelines and hatching.

    16 Apr 2026 Full applications
  • P/26/04285/FUL Awaiting decision

    117-119 Oakwood House West Hill Road Bournemouth BH2 5PH

    Proposed replacement flat roof and lantern

    4 Sep 2026 Full applications
  • P/26/03038/FUL Granted

    140A Stewart Road Bournemouth BH8 8NX

    New dormer window to new loft extension

    30 Jun 2026 Full applications
  • P/26/03029/FUL Granted

    13 Bure Lane Christchurch BH23 4DJ

    Demolition of the existing dwelling and construction of a replacement house with associated parking

    30 Jun 2026 Full applications
  • P/26/04204/FUL Awaiting decision

    92-94 Castle Lane West Bournemouth BH9 3JU

    Alterations to the first floor to replace a window with a glazed door and form a balcony to the main building (Part retrospective)

    1 Sep 2026 Full applications