Planning application

Aspirations Academy Trust Stafford Road Bournemouth BH1 1PA

Refused Bournemouth, Christchurch and Poole P/25/04511/FUL Full Planning Permission

Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.

Proposal

Installation of perimeter fencing and access gates to improve safeguarding and security to the school

As published by the council, reference P/25/04511/FUL

Application record

Reference
P/25/04511/FUL
Type
Full Planning Permission
Status
Application Refused
Decision
Refused
Received
4 Nov 2025
Validated
6 Nov 2025
Decided
2 Feb 2026
Ward
Bournemouth Central
Decision by
Delegated
Postcode
BH1 1PA

Timeline

Dates from the published record

  1. 4 Nov 2025

    Received by Bournemouth, Christchurch and Poole

  2. 6 Nov 2025

    Validated

    Checked as complete and ready for consideration.

  3. 2 Feb 2026

    Decision issued: Refused

  4. 12 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

14 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What refusal means

The process from here

The council refused this application for the reasons set out on the decision notice, which the council portal holds in full. Only the applicant can appeal a refusal; the time limit runs from the decision date and is shorter for householder schemes.

Refusal does not prevent a fresh attempt. Applicants often address the reasons for refusal and resubmit, so a refused scheme is not necessarily the end of proposals for the site.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 22 Stafford Road Bournemouth BH1 1JH

    P/25/03886/CLE Submitted 1 Oct 2025 63m away

    Lawful Development Certificate for Existing Use or Operation for two additional units on second floor (making a total of 6 units) following the creation of 4 units under planning application 7-2018-6333-F

    Decided Lawful development 6 docs
    Several homes
  • 3, 3a, 5, 5a and 9a Stafford Road Bournemouth BH1 1JH

    P/25/03538/CONDR Submitted 11 Sep 2025 63m away

    Variation of Conditions 1 (plans list) & 4 (cycle store details) & removal of Condition 5 (Waste Bin Storage / Provision of a Refuse Management Plan) of planning application 7-2022-9636-B (Renovations to existing vacant retail units 3 and 5 with new shop fronts and the conversion of 3 x existing flats on the upper floors of 3a, 5a, and 9a to 6 x flats with alterations to the fenestrations and associated cycle storage) to correctly show the site boundary, the location of the existing and proposed bin storage areas, and the location and details of the proposed cycle storage & remove Condition 5 based on the details provided in the Refuse Management Plan and shown on drawings.

    Granted Amendments New dwelling 21 docs
  • Flat 2 30 Stafford Road Bournemouth BH1 1JH

    P/25/05142/CLE Submitted 11 Dec 2025 63m away

    Lawful development certificate for the continued use of the application site as a self-contained residential flat within a converted residential building, occupied as a single dwellinghouse (Use class C3).

    Decided Lawful development 4 docs
    Domestic
  • The Avebury 10 Madeira Road Bournemouth BH1 1DE

    P/25/04903/LEG Submitted 27 Nov 2025 69m away

    Application for modification or discharge of planning obligation(s) to vary the Section 106 (S106) agreement to amend the payment schedule and re-calculation of contributions based on current policy - 7-2022-14107-AB

    Refused Conditions 7 docs
  • 5 Madeira Road Bournemouth BH1 1QQ

    P/26/00056/TTPO Submitted 7 Jan 2026 71m away

    T1- Lime - Remove epicormic growth at base to allow inspection of stem and buttresses.

    Granted Trees 4 docs
  • O'Neills 231 Old Christchurch Road Bournemouth BH1 1JZ

    P/26/02437/ADV Submitted 26 May 2026 131m away

    77% historically approved · decision due ~21 Jul

    Replacement internally illuminated fascia signs, internally illuminated oak barrel projection sign, refurbishment of existing internally illuminated projection sign and digitally printed mural to replace existing.

    Awaiting decision Advertising 13 docs

In Bournemouth, Christchurch and Poole

  • P/26/01726/FUL Granted

    Royal Bournemouth Hospital Castle Lane East Bournemouth BH7 7DW

    Installation of a Portakabin Building system to be used as a remote site welfare unit for ambulance crews. Involves 6 Ambulance parking bays with Vehicle shorelines and hatching.

    16 Apr 2026 Full applications
  • P/26/04285/FUL Awaiting decision

    117-119 Oakwood House West Hill Road Bournemouth BH2 5PH

    Proposed replacement flat roof and lantern

    4 Sep 2026 Full applications
  • P/26/03038/FUL Granted

    140A Stewart Road Bournemouth BH8 8NX

    New dormer window to new loft extension

    30 Jun 2026 Full applications
  • P/26/03029/FUL Granted

    13 Bure Lane Christchurch BH23 4DJ

    Demolition of the existing dwelling and construction of a replacement house with associated parking

    30 Jun 2026 Full applications
  • P/26/04204/FUL Awaiting decision

    92-94 Castle Lane West Bournemouth BH9 3JU

    Alterations to the first floor to replace a window with a glazed door and form a balcony to the main building (Part retrospective)

    1 Sep 2026 Full applications