Skip to content
PlanIndex Get alerts
Menu

Planning application

Christchurch Harbour Hotel 95 Mudeford Christchurch BH23 3NT

Granted Bournemouth, Christchurch and Poole P/25/04429/FUL Full Planning Permission

Works: Extension

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

The installation of roof-mounted Solar PV on the modern extension

As published by the council, reference P/25/04429/FUL

Application record

Reference
P/25/04429/FUL
Type
Full Planning Permission
Status
Application Approved
Decision
Granted
Received
29 Oct 2025
Validated
29 Oct 2025
Decided
22 Dec 2025
Ward
Mudeford, Stanpit & West Highcliffe
Parish
Christchurch Town Council
Decision by
Delegated
Postcode
BH23 3NT

Site history

Applications at this address on the Bournemouth, Christchurch and Poole register

This site has had 4 applications since 2025: 4 approved, 0 refused.

  • P/25/04430/LB Granted

    Christchurch Harbour Hotel 95 Mudeford Christchurch BH23 3NT

    Listed Building Consent for the installation of roof-mounted Solar PV on the modern extension

    Decided 22 Dec 2025 Heritage and listed buildings
  • P/25/04395/LB Granted

    Christchurch Harbour Hotel 95 Mudeford Christchurch BH23 3NT

    Listed Building Consent for the installation of 4 AC condenser units.

    Decided 22 Dec 2025 Heritage and listed buildings
  • P/25/04394/FUL Granted

    Christchurch Harbour Hotel 95 Mudeford Christchurch BH23 3NT

    Installation of 4 AC condenser units.

    Decided 22 Dec 2025 Full applications

Timeline

Dates from the published record

  1. 29 Oct 2025

    Received by Bournemouth, Christchurch and Poole

  2. 22 Dec 2025

    Decision issued: Granted

  3. 12 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Bournemouth, Christchurch and Poole granted permission on 22 December 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Bournemouth, Christchurch and Poole

  • P/26/01726/FUL Granted

    Royal Bournemouth Hospital Castle Lane East Bournemouth BH7 7DW

    Installation of a Portakabin Building system to be used as a remote site welfare unit for ambulance crews. Involves 6 Ambulance parking bays with Vehicle shorelines and hatching.

    16 Apr 2026 Full applications
  • P/26/04285/FUL Awaiting decision

    117-119 Oakwood House West Hill Road Bournemouth BH2 5PH

    Proposed replacement flat roof and lantern

    4 Sep 2026 Full applications
  • P/26/03038/FUL Granted

    140A Stewart Road Bournemouth BH8 8NX

    New dormer window to new loft extension

    30 Jun 2026 Full applications
  • P/26/03029/FUL Granted

    13 Bure Lane Christchurch BH23 4DJ

    Demolition of the existing dwelling and construction of a replacement house with associated parking

    30 Jun 2026 Full applications
  • P/26/04204/FUL Awaiting decision

    92-94 Castle Lane West Bournemouth BH9 3JU

    Alterations to the first floor to replace a window with a glazed door and form a balcony to the main building (Part retrospective)

    1 Sep 2026 Full applications