Skip to content
PlanIndex Get alerts
Menu

Planning application

Unit 2, Overstrand Building Boscombe Promenade Bournemouth BH5 1BN

Granted Bournemouth, Christchurch and Poole P/25/04357/FUL Full Planning Permission

Works: Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Alterations to existing shopfront including installation of timber decking to the front of building

As published by the council, reference P/25/04357/FUL

Application record

Reference
P/25/04357/FUL
Type
Full Planning Permission
Status
Application Approved
Decision
Granted
Received
27 Oct 2025
Validated
29 Oct 2025
Decided
19 Dec 2025
Ward
Boscombe West
Decision by
Delegated
Postcode
BH5 1BN

Timeline

Dates from the published record

  1. 27 Oct 2025

    Received by Bournemouth, Christchurch and Poole

  2. 29 Oct 2025

    Validated

    Checked as complete and ready for consideration.

  3. 19 Dec 2025

    Decision issued: Granted

  4. 12 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Boscombe Pier Undercliff Drive Bournemouth BH5 1BN

    P/26/00551/LB Submitted 9 Feb 2026 0m away

    Listed Building Consent for the replacement of the existing rendered soffit and supporting structure to the main roof and the replacement of flat roof coverings to the main roof and lower flat roofs over the shop units.

    Granted Heritage and listed buildings 7 docs
  • Unit 2, Overstrand Building, Boscombe Promenade Bournemouth BH5 1BN

    P/25/03673/CLP Submitted 18 Sep 2025 0m away

    Lawful Development Certificate for proposed use of commercial unit (Use Class E (a)) as a bathhouse (Use Class E (d))

    Decided Lawful development 8 docs
  • Flat 3 20 Undercliff Road Bournemouth BH5 1BL

    P/26/00511/FUL Submitted 6 Feb 2026 136m away

    Remove timber balcony and erect a replacement glass balcony and screening panel (part retrospective)

    Refused Full applications 8 docs
  • 79A Sea Road Boscombe Bournemouth BH5 1BG

    P/26/03430/FUL Submitted 21 Jul 2026 148m away

    76% historically approved · decision due ~9 Oct

    Replace existing first floor 2 pane uPVC Window enclosing balcony with 4 pane aluminium window.

    Awaiting decision Full applications Windows or glazing 7 docs
  • San Remo Towers Sea Road Boscombe Bournemouth BH5 1JR

    P/26/01465/TCA Submitted 31 Mar 2026 225m away

    T1 - Sweet Chestnut - Crown lift lower secondary branches hanging over the driveway entrance up to a height of 5m so higher vehicles can gain access without damaging the trees branches. Reduce section of branches close to the neighbouring property’s building to a clearance of 2m only. T2 - Sweet Chestnut - Fell to 1m above ground level. T3 - Lime - Reduce the height down to 4m above ground level to marked line on photo.

    Granted Trees 10 docs
  • Seaview 14 Boscombe Spa Road Bournemouth BH5 1AZ

    P/26/00134/TTPO Submitted 13 Jan 2026 271m away

    T1 - Sycamore - Crown lift to 4m above ground level by removing secondary and tertiary branches. Prune to clear the building by 3m. Reduce the branch that extends furthest over the pavement by 1m.

    Split decision Trees 4 docs

In Bournemouth, Christchurch and Poole

  • P/26/01726/FUL Granted

    Royal Bournemouth Hospital Castle Lane East Bournemouth BH7 7DW

    Installation of a Portakabin Building system to be used as a remote site welfare unit for ambulance crews. Involves 6 Ambulance parking bays with Vehicle shorelines and hatching.

    16 Apr 2026 Full applications
  • P/26/04285/FUL Awaiting decision

    117-119 Oakwood House West Hill Road Bournemouth BH2 5PH

    Proposed replacement flat roof and lantern

    4 Sep 2026 Full applications
  • P/26/03038/FUL Granted

    140A Stewart Road Bournemouth BH8 8NX

    New dormer window to new loft extension

    30 Jun 2026 Full applications
  • P/26/03029/FUL Granted

    13 Bure Lane Christchurch BH23 4DJ

    Demolition of the existing dwelling and construction of a replacement house with associated parking

    30 Jun 2026 Full applications
  • P/26/04204/FUL Awaiting decision

    92-94 Castle Lane West Bournemouth BH9 3JU

    Alterations to the first floor to replace a window with a glazed door and form a balcony to the main building (Part retrospective)

    1 Sep 2026 Full applications