Skip to content
PlanIndex Get alerts
Menu

Planning application

10 The Triangle Bournemouth BH2 5RY

Granted Bournemouth, Christchurch and Poole P/25/04163/FUL Full Planning Permission

Works: Demolition Domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Demolition of existing ground and 1st-floor store r/o 10/10A The Triangle; alterations and partial demolition of 18 Norwich Road; construction of a new 2-storey building (10B The Triangle) to the r/o 10 / 10A comprising ground floor workshop with studio flat above; construction of a new 4-storey dwelling at 18 Norwich Road (2-storeys when viewed from Norwich Road); alterations to existing courtyard to provide car and cycle parking and bin storage.

As published by the council, reference P/25/04163/FUL

Application record

Reference
P/25/04163/FUL
Type
Full Planning Permission
Status
Application Approved
Decision
Granted
Received
15 Oct 2025
Validated
31 Oct 2025
Decided
10 Feb 2026
Ward
Bournemouth Central
Decision by
Delegated
Postcode
BH2 5RY

Timeline

Dates from the published record

  1. 15 Oct 2025

    Received by Bournemouth, Christchurch and Poole

  2. 31 Oct 2025

    Validated

    Checked as complete and ready for consideration.

  3. 10 Feb 2026

    Decision issued: Granted

  4. 12 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

23 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 29-30 The Triangle Bournemouth BH2 5SE

    P/26/04151/PNCBD Submitted 27 Aug 2026 59m away

    72% historically approved · decision due ~22 Oct

    Prior approval for the change of use of the rear areas on basement and ground floor levels from commercial offices (Class E) to 2 self-contained residential flats (Class C3)

    Awaiting decision Prior approval New dwelling 6 docs
  • 109-111 Commercial Road Bournemouth BH2 5RT

    P/25/04268/FUL Submitted 22 Oct 2025 86m away

    Conversion of a commercial unit into two contemporary apartments. To enable a functional internal layout, certain glass panels will be replaced with blank grey panels. Where internal walls intersect with the current glazing, the glass will be substituted with solid panels to preserve a consistent and cohesive façade. (Change of use and conversion submitted as a separate permitted development application on P/25/04030/PNCBD).

    Withdrawn Full applications New dwelling Windows or glazing 14 docs
  • 109-111 Commercial Road Bournemouth BH2 5RT

    P/25/04030/PNCBD Submitted 8 Oct 2025 86m away

    Prior Notification for a change of use of the ground floor and Lower ground floor from commercial (Class E) into a one-bedroom flat on the ground floor and a studio flat on the lower ground floor. (Class C3)

    Refused Prior approval 15 docs
  • 27 Norwich Road Bournemouth BH2 5QZ

    P/26/00286/CLE Submitted 22 Jan 2026 102m away

    Lawful Development Certificate for existing use or operation to use as a 5 bedroom student house.

    Decided Lawful development 5 docs
  • 30 Poole Hill Bournemouth BH2 5PS

    P/25/03904/FUL Submitted 1 Oct 2025 132m away

    Alterations, extension, internal reconfiguration and conversion of office building to provide 5 flats and a Class E commercial unit on the ground floor with associated parking, cycle and bin storage.

    Granted Full applications New dwelling Extension 26 docs
    Several homes
  • 30 Poole Hill Bournemouth BH2 5PS

    P/25/03903/LB Submitted 1 Oct 2025 132m away

    Listed Building Consent for alterations, extension, internal reconfiguration and conversion of office building to provide 5 flats and a Class E commercial unit on the ground floor with associated parking, cycle and bin storage.

    Granted Heritage and listed buildings New dwelling Extension 16 docs
    Several homes

In Bournemouth, Christchurch and Poole

  • P/26/01726/FUL Granted

    Royal Bournemouth Hospital Castle Lane East Bournemouth BH7 7DW

    Installation of a Portakabin Building system to be used as a remote site welfare unit for ambulance crews. Involves 6 Ambulance parking bays with Vehicle shorelines and hatching.

    16 Apr 2026 Full applications
  • P/26/04285/FUL Awaiting decision

    117-119 Oakwood House West Hill Road Bournemouth BH2 5PH

    Proposed replacement flat roof and lantern

    4 Sep 2026 Full applications
  • P/26/03038/FUL Granted

    140A Stewart Road Bournemouth BH8 8NX

    New dormer window to new loft extension

    30 Jun 2026 Full applications
  • P/26/03029/FUL Granted

    13 Bure Lane Christchurch BH23 4DJ

    Demolition of the existing dwelling and construction of a replacement house with associated parking

    30 Jun 2026 Full applications
  • P/26/04204/FUL Awaiting decision

    92-94 Castle Lane West Bournemouth BH9 3JU

    Alterations to the first floor to replace a window with a glazed door and form a balcony to the main building (Part retrospective)

    1 Sep 2026 Full applications