Skip to content
PlanIndex Get alerts
Menu

Planning application

Flat 1 29 Markham Road Bournemouth BH9 1HZ

Granted Bournemouth, Christchurch and Poole P/25/04015/FUL Full Planning Permission

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of a timber and polycarbonate roof structure to cover an external amenity area (Retrospective) and replace 2 no. felt roofs over single storey extensions with a single layer rubber roofing material

As published by the council, reference P/25/04015/FUL

Application record

Reference
P/25/04015/FUL
Type
Full Planning Permission
Status
Application Approved
Decision
Granted
Received
7 Oct 2025
Validated
7 Oct 2025
Decided
27 Nov 2025
Ward
Winton East
Decision by
Delegated
Postcode
BH9 1HZ

Timeline

Dates from the published record

  1. 7 Oct 2025

    Received by Bournemouth, Christchurch and Poole

  2. 27 Nov 2025

    Decision issued: Granted

  3. 12 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 34 Hankinson Road Bournemouth BH9 1HW

    P/25/05018/CLE Submitted 3 Dec 2025 91m away

    Lawful Development Certificate for existing use of a C4 House in Multiple Occupation (HMO) for more than 10 years

    Decided Lawful development 6 docs
  • 23A Somerley Road Bournemouth BH9 1EW

    P/25/04486/HOU Submitted 3 Nov 2025 103m away

    Side extension to private dwelling and new bedroom window to rear elevation.

    Granted Householder Extension Windows or glazing 7 docs
    Domestic
  • 50 Somerley Road Bournemouth BH9 1EN

    P/26/04131/HOU Submitted 26 Aug 2026 115m away

    88% historically approved · decision due ~21 Oct

    Erection of a single-storey ancillary outbuilding within the residential curtilage (Resubmission)

    Awaiting decision Householder 4 docs
    Small domestic
  • 34 Somerley Road Bournemouth BH9 1EN

    P/25/03623/FUL Submitted 16 Sep 2025 115m away

    Change of use from House in Multiple Occupation (Class C4) to eight bedroom House in Multiple Occupation (Sui Generis)

    Granted Full applications 13 docs
  • 50 Somerley Road Bournemouth BH9 1EN

    P/26/00764/HOU Submitted 23 Feb 2026 115m away

    Retrospective consent for the erection of a single-storey ancillary outbuilding within the residential curtilage

    Refused Householder 5 docs
    Small domestic
  • 80 Markham Road Bournemouth BH9 1JA

    P/25/05010/CLE Submitted 3 Dec 2025 143m away

    Lawful Development Certificate for existing use of a House in Multiple Occupation (Sui Generis HMO) for more than 10 years

    Decided Lawful development 6 docs

In Bournemouth, Christchurch and Poole

  • P/26/01726/FUL Granted

    Royal Bournemouth Hospital Castle Lane East Bournemouth BH7 7DW

    Installation of a Portakabin Building system to be used as a remote site welfare unit for ambulance crews. Involves 6 Ambulance parking bays with Vehicle shorelines and hatching.

    16 Apr 2026 Full applications
  • P/26/04285/FUL Awaiting decision

    117-119 Oakwood House West Hill Road Bournemouth BH2 5PH

    Proposed replacement flat roof and lantern

    4 Sep 2026 Full applications
  • P/26/03038/FUL Granted

    140A Stewart Road Bournemouth BH8 8NX

    New dormer window to new loft extension

    30 Jun 2026 Full applications
  • P/26/03029/FUL Granted

    13 Bure Lane Christchurch BH23 4DJ

    Demolition of the existing dwelling and construction of a replacement house with associated parking

    30 Jun 2026 Full applications
  • P/26/04204/FUL Awaiting decision

    92-94 Castle Lane West Bournemouth BH9 3JU

    Alterations to the first floor to replace a window with a glazed door and form a balcony to the main building (Part retrospective)

    1 Sep 2026 Full applications