Planning application
23 Holdenhurst Road Bournemouth BH8 8EH
Works: New dwelling
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Proposal to remodel the existing building comprising a commercial unit, office and 3 flatlets into a commercial unit, office and 4 self-contained flats
As published by the council, reference P/25/03994/FUL
Application record
- Reference
- P/25/03994/FUL
- Type
- Full Planning Permission
- Status
- Application Approved
- Decision
- Granted
- Received
- 6 Oct 2025
- Validated
- 10 Oct 2025
- Decided
- 19 Dec 2025
- Ward
- Bournemouth Central
- Decision by
- Delegated
- Postcode
- BH8 8EH
Timeline
Dates from the published record
-
6 Oct 2025
Received by Bournemouth, Christchurch and Poole
-
10 Oct 2025
Validated
Checked as complete and ready for consideration.
-
19 Dec 2025
Decision issued: Granted
-
12 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
26 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Telecom House 35 Holdenhurst Road Bournemouth BH8 8EH
89% historically approved · decision due ~13 Oct
Lawful Development Certificate for proposed drainage infrastructure in relation to planning permission (reference 7-2024-879-BT
Awaiting decision Lawful development 6 docs -
Pavement o/s 15 Holdenhurst Road Bournemouth BH8 8EH
Advertisment consent for the installation of 1no. BT Street Hub
Refused Advertising 13 docs -
Telecom House 35 Holdenhurst Road Bournemouth BH8 8EH
Non-material amendment following approval of 7-2024-879-BT to amend the wording of Conditions 15 (Soft Landscape Works), 17 (Landscape Maintenance Plan) and 22 (Noise Mitigation) to allow full details of soft landscape works and a landscape maintenance plan submission within three months of the commencement of the demolition of the building and that prior to commencement of development above the damp proof course of the building hereby approved, full details shall be provided of suitable noise mitigation measures
Granted Amendments Demolition 5 docs -
Pavement o/s 15 Holdenhurst Road Bournemouth BH8 8EH
The installation of 1no. BT Street Hub
Refused Full applications 14 docs -
Lansdowne Place 17 Holdenhurst Road Bournemouth BH8 8EW
Lawful development application to confirm that planning permission granted under 7-2021-7689-L for the demolition of existing building and erection of split level 1/3/5/6 storey block of 32 flats with associated access, cycle parking & landscaping has been implemented through the construction of foundations along northern elevation (4.6mx0.75m) and discharge of all pre-commencement conditions
Decided Lawful development New dwelling Demolition 6 docsMajor scheme -
2 Holdenhurst Road Bournemouth BH8 8AD
76% historically approved · decision due ~14 Oct
Change of use of a Public House (Sui Generis) to a hot food takeaway (Sui Generis), installation of extraction and ventilation equipment and minor external alterations.
Awaiting decision Full applications 23 docs
Other full applications applications
In Bournemouth, Christchurch and Poole
-
P/26/01726/FUL Granted
Royal Bournemouth Hospital Castle Lane East Bournemouth BH7 7DW
Installation of a Portakabin Building system to be used as a remote site welfare unit for ambulance crews. Involves 6 Ambulance parking bays with Vehicle shorelines and hatching.
-
P/26/04285/FUL Awaiting decision
117-119 Oakwood House West Hill Road Bournemouth BH2 5PH
Proposed replacement flat roof and lantern
-
P/26/03038/FUL Granted
140A Stewart Road Bournemouth BH8 8NX
New dormer window to new loft extension
-
P/26/03029/FUL Granted
13 Bure Lane Christchurch BH23 4DJ
Demolition of the existing dwelling and construction of a replacement house with associated parking
-
P/26/04204/FUL Awaiting decision
92-94 Castle Lane West Bournemouth BH9 3JU
Alterations to the first floor to replace a window with a glazed door and form a balcony to the main building (Part retrospective)