Skip to content
PlanIndex Get alerts
Menu

Planning application

23 Holdenhurst Road Bournemouth BH8 8EH

Granted Bournemouth, Christchurch and Poole P/25/03994/FUL Full Planning Permission

Works: New dwelling

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Proposal to remodel the existing building comprising a commercial unit, office and 3 flatlets into a commercial unit, office and 4 self-contained flats

As published by the council, reference P/25/03994/FUL

Application record

Reference
P/25/03994/FUL
Type
Full Planning Permission
Status
Application Approved
Decision
Granted
Received
6 Oct 2025
Validated
10 Oct 2025
Decided
19 Dec 2025
Ward
Bournemouth Central
Decision by
Delegated
Postcode
BH8 8EH

Timeline

Dates from the published record

  1. 6 Oct 2025

    Received by Bournemouth, Christchurch and Poole

  2. 10 Oct 2025

    Validated

    Checked as complete and ready for consideration.

  3. 19 Dec 2025

    Decision issued: Granted

  4. 12 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

26 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Telecom House 35 Holdenhurst Road Bournemouth BH8 8EH

    P/26/03643/CLP Submitted 31 Jul 2026 0m away

    89% historically approved · decision due ~13 Oct

    Lawful Development Certificate for proposed drainage infrastructure in relation to planning permission (reference 7-2024-879-BT

    Awaiting decision Lawful development 6 docs
  • Pavement o/s 15 Holdenhurst Road Bournemouth BH8 8EH

    P/25/03869/ADV Submitted 30 Sep 2025 0m away

    Advertisment consent for the installation of 1no. BT Street Hub

    Refused Advertising 13 docs
  • Telecom House 35 Holdenhurst Road Bournemouth BH8 8EH

    P/26/03644/NMA Submitted 31 Jul 2026 0m away

    Non-material amendment following approval of 7-2024-879-BT to amend the wording of Conditions 15 (Soft Landscape Works), 17 (Landscape Maintenance Plan) and 22 (Noise Mitigation) to allow full details of soft landscape works and a landscape maintenance plan submission within three months of the commencement of the demolition of the building and that prior to commencement of development above the damp proof course of the building hereby approved, full details shall be provided of suitable noise mitigation measures

    Granted Amendments Demolition 5 docs
  • Pavement o/s 15 Holdenhurst Road Bournemouth BH8 8EH

    P/25/03870/FUL Submitted 30 Sep 2025 0m away

    The installation of 1no. BT Street Hub

    Refused Full applications 14 docs
  • Lansdowne Place 17 Holdenhurst Road Bournemouth BH8 8EW

    P/25/03143/CLE Submitted 18 Aug 2025 17m away

    Lawful development application to confirm that planning permission granted under 7-2021-7689-L for the demolition of existing building and erection of split level 1/3/5/6 storey block of 32 flats with associated access, cycle parking & landscaping has been implemented through the construction of foundations along northern elevation (4.6mx0.75m) and discharge of all pre-commencement conditions

    Decided Lawful development New dwelling Demolition 6 docs
    Major scheme
  • 2 Holdenhurst Road Bournemouth BH8 8AD

    P/26/03803/FUL Submitted 10 Aug 2026 50m away

    76% historically approved · decision due ~14 Oct

    Change of use of a Public House (Sui Generis) to a hot food takeaway (Sui Generis), installation of extraction and ventilation equipment and minor external alterations.

    Awaiting decision Full applications 23 docs

In Bournemouth, Christchurch and Poole

  • P/26/01726/FUL Granted

    Royal Bournemouth Hospital Castle Lane East Bournemouth BH7 7DW

    Installation of a Portakabin Building system to be used as a remote site welfare unit for ambulance crews. Involves 6 Ambulance parking bays with Vehicle shorelines and hatching.

    16 Apr 2026 Full applications
  • P/26/04285/FUL Awaiting decision

    117-119 Oakwood House West Hill Road Bournemouth BH2 5PH

    Proposed replacement flat roof and lantern

    4 Sep 2026 Full applications
  • P/26/03038/FUL Granted

    140A Stewart Road Bournemouth BH8 8NX

    New dormer window to new loft extension

    30 Jun 2026 Full applications
  • P/26/03029/FUL Granted

    13 Bure Lane Christchurch BH23 4DJ

    Demolition of the existing dwelling and construction of a replacement house with associated parking

    30 Jun 2026 Full applications
  • P/26/04204/FUL Awaiting decision

    92-94 Castle Lane West Bournemouth BH9 3JU

    Alterations to the first floor to replace a window with a glazed door and form a balcony to the main building (Part retrospective)

    1 Sep 2026 Full applications