Planning application
South Western House Fir Vale Road Bournemouth BH1 2NA
Works: New dwelling Windows or glazing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Change of use of Ground and Lower Ground floor accommodation from night club use and ancillary spaces to provide 2 no. cluster flats (10 bed spaces) and 3 no. studio flats with external changes to fenestration including new ramp. (Amendment to planning permission 7-2024-1958-DT)
As published by the council, reference P/25/03853/FUL
Application record
- Reference
- P/25/03853/FUL
- Type
- Full Planning Permission
- Status
- Application Approved
- Decision
- Granted
- Received
- 30 Sep 2025
- Validated
- 30 Sep 2025
- Decided
- 25 Feb 2026
- Ward
- Bournemouth Central
- Decision by
- Delegated
- Postcode
- BH1 2NA
Timeline
Dates from the published record
-
30 Sep 2025
Received by Bournemouth, Christchurch and Poole
-
25 Feb 2026
Decision issued: Granted
-
12 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
25 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
South Western House Fir Vale Road Bournemouth BH1 2NA
Extension to the building, at roof level, to form 3 additional floors with 75 no. student studio bedspaces and associated external works
Withdrawn Full applications Extension 32 docs -
Hanover House 134 Old Christchurch Road Bournemouth BH1 1NL
Conversion of the third floor from language school (Class F1) to 4 flats (Class C3)
Granted Full applications New dwelling 14 docsSeveral homes -
The Outlook, The Annexe Glen Fern Road Bournemouth BH1 2LZ
76% historically approved · decision due ~19 Jun
Retrospective application for change of use of 1st and 2nd floors to a large House of Multiple Occupation (Sui Generis)
Awaiting decision Full applications 8 docs -
8 Fir Vale Road Bournemouth BH1 2JG
76% historically approved · decision due ~31 Oct
Convert accommodation to a 12 bed HMO with associated access, parking and amenity space.
Awaiting decision Full applications 19 docs -
95 Old Christchurch Road Bournemouth BH1 1EP
Listed Building Consent for works to front elevation, including timber repairs, replacement leadwork and guttering to bay window, replacement of failed bricks to brick piers and parapet arches, works to tracery of second-floor bay window and removal, refurbishing and refixing of balcony cast-iron fretwork
Granted Heritage and listed buildings Windows or glazing 15 docs -
99 Old Christchurch Road Bournemouth BH1 1EP
89% historically approved · decision due ~8 Oct
Listed Building Consent for: roof works, including structural timber replacement, leadwork replacement, removal of rooflights, and re-covering of slate roofing; window repairs and window replacement; repairs to and partial replacement of rainwater goods; replacement of rear-elevation door and metal staircase; localised repointing, patch repairs of render, and masonry repainting
Awaiting decision Heritage and listed buildings Loft or dormer Windows or glazing 5 docs
Other full applications applications
In Bournemouth, Christchurch and Poole
-
P/26/01726/FUL Granted
Royal Bournemouth Hospital Castle Lane East Bournemouth BH7 7DW
Installation of a Portakabin Building system to be used as a remote site welfare unit for ambulance crews. Involves 6 Ambulance parking bays with Vehicle shorelines and hatching.
-
P/26/04285/FUL Awaiting decision
117-119 Oakwood House West Hill Road Bournemouth BH2 5PH
Proposed replacement flat roof and lantern
-
P/26/03038/FUL Granted
140A Stewart Road Bournemouth BH8 8NX
New dormer window to new loft extension
-
P/26/03029/FUL Granted
13 Bure Lane Christchurch BH23 4DJ
Demolition of the existing dwelling and construction of a replacement house with associated parking
-
P/26/04204/FUL Awaiting decision
92-94 Castle Lane West Bournemouth BH9 3JU
Alterations to the first floor to replace a window with a glazed door and form a balcony to the main building (Part retrospective)