Planning application
17 Talbot Avenue Bournemouth BH3 7HR
Works: New dwelling Domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Sever land and erect a detached dwelling (self build) and form vehicular access off Roslin Road South
As published by the council, reference P/25/03701/FUL
Application record
- Reference
- P/25/03701/FUL
- Type
- Full Planning Permission
- Status
- Application Approved
- Decision
- Granted
- Received
- 19 Sep 2025
- Validated
- 24 Sep 2025
- Decided
- 13 Jan 2026
- Ward
- Talbot & Branksome Woods
- Decision by
- Delegated
- Postcode
- BH3 7HR
Timeline
Dates from the published record
-
19 Sep 2025
Received by Bournemouth, Christchurch and Poole
-
24 Sep 2025
Validated
Checked as complete and ready for consideration.
-
13 Jan 2026
Decision issued: Granted
-
12 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
24 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
14 Talbot Avenue Bournemouth BH3 7HX
New roof lantern on existing flat roof over existing single storey rear projection
Granted Householder Roofing Windows or glazing 8 docsSmall domestic -
-
9 Nairn Road Bournemouth BH3 7BD
96% historically approved · decision due ~7 Sep
4x Oak, 1x Pine, 1x Holly - Remove dead wood
Awaiting decision Trees -
-
9 Nairn Road Bournemouth BH3 7BD
96% historically approved · decision due ~16 Sep
T1 - English oak - Remove the damaged upright stem, pruning 1m below the damaged area where a branch has previously broken and fallen.
Awaiting decision Trees 3 docs -
Roslin House 2 Roslin Road Bournemouth BH3 7JA
T1 Hornbeam - Prune back the canopy that overextends over the parking bays by 2-3m
Granted Trees 4 docs
Other full applications applications
In Bournemouth, Christchurch and Poole
-
P/26/01726/FUL Granted
Royal Bournemouth Hospital Castle Lane East Bournemouth BH7 7DW
Installation of a Portakabin Building system to be used as a remote site welfare unit for ambulance crews. Involves 6 Ambulance parking bays with Vehicle shorelines and hatching.
-
P/26/04285/FUL Awaiting decision
117-119 Oakwood House West Hill Road Bournemouth BH2 5PH
Proposed replacement flat roof and lantern
-
P/26/03038/FUL Granted
140A Stewart Road Bournemouth BH8 8NX
New dormer window to new loft extension
-
P/26/03029/FUL Granted
13 Bure Lane Christchurch BH23 4DJ
Demolition of the existing dwelling and construction of a replacement house with associated parking
-
P/26/04204/FUL Awaiting decision
92-94 Castle Lane West Bournemouth BH9 3JU
Alterations to the first floor to replace a window with a glazed door and form a balcony to the main building (Part retrospective)