Skip to content
PlanIndex Get alerts
Menu

Planning application

77 Shaftesbury Road Bournemouth BH8 8SU

Granted Bournemouth, Christchurch and Poole P/25/03700/FUL Full Planning Permission

Works: Loft or dormer

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Alterations to an existing sui generis HMO creating new gable dormer to existing loft room.

As published by the council, reference P/25/03700/FUL

Application record

Reference
P/25/03700/FUL
Type
Full Planning Permission
Status
Application Approved
Decision
Granted
Received
19 Sep 2025
Validated
24 Sep 2025
Decided
17 Nov 2025
Ward
Queen's Park
Decision by
Delegated
Postcode
BH8 8SU

Timeline

Dates from the published record

  1. 19 Sep 2025

    Received by Bournemouth, Christchurch and Poole

  2. 24 Sep 2025

    Validated

    Checked as complete and ready for consideration.

  3. 17 Nov 2025

    Decision issued: Granted

  4. 12 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

13 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 4 Oak Road Bournemouth BH8 8TB

    P/26/01549/CLP Submitted 7 Apr 2026 80m away

    Lawful Development Certificate for proposed loft extension, two dormers on side elevations

    Decided Lawful development Extension Loft or dormer 11 docs
  • 73 Avon Road Bournemouth BH8 8SG

    P/25/04936/HOU Submitted 1 Dec 2025 102m away

    Proposed single storey extension to side and rear

    Granted Householder Extension 6 docs
    Small domestic
  • 84 Richmond Park Road Bournemouth BH8 8TQ

    7-2024-15125-B Submitted 4 Dec 2024 158m away

    Change of use: Convert a 4 bedroom Detached House into an HMO (8 units), and 1 bedroom flat. With the ground floor rear extension (retrospective), with covered cycle storage and associated amenity space

    Granted Full applications New dwelling Extension 23 docs
    Several homes
  • 59 Richmond Park Road Bournemouth BH8 8TU

    P/25/03382/HOU Submitted 3 Sep 2025 207m away

    First floor extension.

    Granted Householder Extension 8 docs
    Domestic
  • 126 Richmond Park Road Bournemouth BH8 8TH

    P/25/04413/TTPO Submitted 29 Oct 2025 277m away

    T1 - Walnut- crown lift to 4.5m removing only secondary and tertiary branches leaving wounds no larger than 50mm dia where possible. prune a 1.5m clearance between building, roof pitch and tree removing only secondary and tertiary branches leaving wounds no larger than 50mm dia where possible.

    Granted Trees 3 docs
  • 7 Sandon Lodge 114 Richmond Park Road Bournemouth BH8 8TH

    P/26/01057/TTPO Submitted 10 Mar 2026 277m away

    T1 - " Carpinus betulus" ( Common hornbeam ) : Prune away from adjacent buildings for a 2m clearance. T2 - " Carpinus betulus" ( Common hornbeam ) : Prune away from adjacent buildings for a 2m clearance.

    Granted Trees 9 docs

In Bournemouth, Christchurch and Poole

  • P/26/01726/FUL Granted

    Royal Bournemouth Hospital Castle Lane East Bournemouth BH7 7DW

    Installation of a Portakabin Building system to be used as a remote site welfare unit for ambulance crews. Involves 6 Ambulance parking bays with Vehicle shorelines and hatching.

    16 Apr 2026 Full applications
  • P/26/04285/FUL Awaiting decision

    117-119 Oakwood House West Hill Road Bournemouth BH2 5PH

    Proposed replacement flat roof and lantern

    4 Sep 2026 Full applications
  • P/26/03038/FUL Granted

    140A Stewart Road Bournemouth BH8 8NX

    New dormer window to new loft extension

    30 Jun 2026 Full applications
  • P/26/03029/FUL Granted

    13 Bure Lane Christchurch BH23 4DJ

    Demolition of the existing dwelling and construction of a replacement house with associated parking

    30 Jun 2026 Full applications
  • P/26/04204/FUL Awaiting decision

    92-94 Castle Lane West Bournemouth BH9 3JU

    Alterations to the first floor to replace a window with a glazed door and form a balcony to the main building (Part retrospective)

    1 Sep 2026 Full applications