Skip to content
PlanIndex Get alerts
Menu

Planning application

Telecommunication Mast Adjacent To, 19 Alder Hills, Poole, BH12 4AL

Granted Bournemouth, Christchurch and Poole APP/22/00090/F Full Planning Permission

Works: Extension

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Removal of 1no existing 12m monopole and 1no equipment cabinet to be replaced with 1no new 18m monopole accommodating new antennas with a wrap-around cabinet, installation of 2no new cabinets and associated ancillary works thereto.

As published by the council, reference APP/22/00090/F

Application record

Reference
APP/22/00090/F
Type
Full Planning Permission
Status
Application Approved
Decision
Granted
Received
19 Jan 2022
Validated
19 Jan 2022
Decided
31 Mar 2022
Ward
Alderney & Bourne Valley
Decision by
Delegated
Postcode
BH12 4AL

Timeline

Dates from the published record

  1. 19 Jan 2022

    Received by Bournemouth, Christchurch and Poole

  2. 31 Mar 2022

    Decision issued: Granted

  3. 24 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

13 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Unit 12 Alder Hills, Poole, Dorset, BH12 4AL

    00/35066/002/F Submitted 23 Nov 2000 0m away

    Erect a two storey block of offices (B1) with associated parking (demolish existing building).

    Granted Full applications Demolition 8 docs
  • Talbot Village Poole BH12 4HL

    P/26/02731/REG14 Submitted 12 Jun 2026 149m away

    2x Oak and 23x Pine - Fire damaged - Dead - Fell

    Granted Trees 1 doc
  • Units A to C Sharp Road Poole BH12 4BG

    P/26/04007/FUL Submitted 20 Aug 2026 303m away

    76% historically approved · decision due ~16 Oct

    Demolition of existing building (comprising 3no. units) and erection of replacement industrial / commercial units, together with the creation of a new vehicular access, associated parking, landscaping and infrastructure

    Awaiting decision Full applications Demolition 25 docs
    Several homes
  • 6 Bridport Road Poole BH12 4BS

    P/26/00513/HOU Submitted 6 Feb 2026 334m away

    Demolition of garage and for the erection of single storey side and front extensions to create additional living accommodation ancillary to the main house. New wheelchair accessible ramp

    Granted Householder Extension Demolition 8 docs
    Small domestic
  • 180-182 Alder Road Poole BH12 4AX

    P/26/01050/FUL Submitted 9 Mar 2026 366m away

    Refurbishment of the restaurant to include the redecoration of elevations, the formation of an additional entrance with new door, the blocking up of a window with new cladding and associated works.

    Granted Full applications Windows or glazing 12 docs
  • 315 Alder Road Poole BH12 5BH

    P/26/02754/HOU Submitted 15 Jun 2026 416m away

    88% historically approved · decision due ~14 Sep

    Improvement and reconfiguration of the existing driveway and front boundary walls to enhance safety, accessibility, and vehicle manoeuvrability

    Awaiting decision Householder 8 docs
    Domestic

In Bournemouth, Christchurch and Poole

  • P/26/01726/FUL Granted

    Royal Bournemouth Hospital Castle Lane East Bournemouth BH7 7DW

    Installation of a Portakabin Building system to be used as a remote site welfare unit for ambulance crews. Involves 6 Ambulance parking bays with Vehicle shorelines and hatching.

    16 Apr 2026 Full applications
  • P/26/04285/FUL Awaiting decision

    117-119 Oakwood House West Hill Road Bournemouth BH2 5PH

    Proposed replacement flat roof and lantern

    4 Sep 2026 Full applications
  • P/26/03038/FUL Granted

    140A Stewart Road Bournemouth BH8 8NX

    New dormer window to new loft extension

    30 Jun 2026 Full applications
  • P/26/03029/FUL Granted

    13 Bure Lane Christchurch BH23 4DJ

    Demolition of the existing dwelling and construction of a replacement house with associated parking

    30 Jun 2026 Full applications
  • P/26/04204/FUL Awaiting decision

    92-94 Castle Lane West Bournemouth BH9 3JU

    Alterations to the first floor to replace a window with a glazed door and form a balcony to the main building (Part retrospective)

    1 Sep 2026 Full applications