Planning application
90 Ellesmere Road Bolton BL3 3JP
Works: Extension Loft or dormer Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
ERECTION OF SINGLE STOREY EXTENSION AT REAR TOGETHER WITH REAR DORMER.
As published by the council, reference 18702/24
Application record
- Reference
- 18702/24
- Type
- Full Planning Permission
- Status
- Decided
- Decision
- Approve subject to conditions
- Received
- 29 Jul 2024
- Validated
- 29 Jul 2024
- Decided
- 12 Sep 2024
- Ward
- Hulton
- Decision by
- Delegated Decision
- Postcode
- BL3 3JP
Timeline
Dates from the published record
-
29 Jul 2024
Received by Bolton
-
12 Sep 2024
Decision issued: Approve subject to conditions
-
24 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice registered in Bolton
130 applications on PlanIndex · across 12 councils · 80% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
5 Girvan Close Bolton BL3 3JS
PRIOR NOTIFICATION APPLICATION FOR A PROPOSED LARGER HOME EXTENSION AT REAR (4.5M LONG; 3.425M MAX HEIGHT; 3.2M EAVES HEIGHT)
Refused Prior approval Extension 8 docs -
10 Girvan Close Bolton BL3 3JS
DEMOLITION OF GARAGE AND ERECTION OF LOWER GROUND / GROUND FLOOR EXTENSION WITH BALCONY AT REAR.
Granted Full applications Extension Demolition 13 docs -
63 Headingley Way Bolton BL3 3EQ
ERECTION OF A SINGLE STOREY FRONT, SIDE AND REAR EXTENSION.
Refused Full applications Extension 6 docsSmall domestic -
10 & 12 Cavendish Gardens Bolton BL3 3GB
ERECTION OF A PART SINGLE STOREY, PART TWO STOREY AND PART FIRST FLOOR REAR EXTENSION.
Granted Full applications Extension 8 docsSmall domestic -
7 Ellesmere Gardens Bolton BL3 3GW
83% historically approved · decision due ~25 Sep
ERECTION OF SINGLE STOREY OUTBUILDING
Awaiting decision 5 docsSmall domestic -
172 Ellesmere Road Bolton BL3 3JN
DEMOLITION OF EXISTING GARAGE AND ERECTION OF A PART SINGLE STOREY/PART TWO STOREY SIDE AND REAR EXTENSION
Refused Householder Extension Demolition 8 docsSmall domestic
Other full applications applications
In Bolton
-
00365/26 Refused
73 Kermoor Avenue Bolton BL1 7HW
ERECTION OF 1NO. DETACHED DWELLING AND ASSOCIATED WORKS
-
21080/25 Granted
J Dickinson And Sons Ltd Station Road Bolton BL6 5JE
VARIATION OF CONDITIONS 1 AND 2 ON APPLICATION 16907/23 ALLOW FOR 24 HOUR OPERATIONS WITHIN UNITS 8 AND OPERATIONS UNTIL 11PM IN UNITS 9/10/11 (WASTE TRANSFER STATION) INCLUDING USE OF INTERNAL PLANT AND MACHINERY THROUGHOUT MONDAY TO SUNDAY AND INCLUDING BANK HOLIDAYS.
-
00820/26 Refused
9 Tonge Fold Road Bolton BL2 6AW
DEMOLITION OF EXISTING DWELLING AND ERECTION OF 6 NO. DWELLINGS TOGETHER WITH ASSOCIATED CAR PARKING
-
00394/26 Granted
Rock Hall Moses Gate Country Park Hall Lane Farnworth BL4 7QE
CHANGE OF USE OF GRADE II LISTED BUILDING TO CAFÉ WITH EXHIBITION, EVENTS, WORKSHOP AND OFFICE SPACES TOGETHER WITH DEMOLITION OF EXISTING TWO STOREY REAR EXTENSION AND ERECTION OF NEW THREE STOREY REAR EXTENSION WITH ROOF TERRACE AND BASEMENT, LANDSCAPING WORKS AND ASSOCIATED RESTORATION WORKS TO BUILDING INCLUDING INSTALLATION OF FRONT DOOR, TIMBER SASH WINDOWS AND HEAT PUMP SYSTEM
-
00252/26 Granted
Albert Road Car Sales 113 Albert Road Bolton BL4 9EA
DEMOLITION OF 2NO. EXISTING SINGLE STOREY BUILDINGS TOGETHER WITH THE ERECTION OF A CAR SHOWROOM WITH ANCILLARY OFFICES AND VALETING BAY