Skip to content
PlanIndex Get alerts
Menu

Planning application

105 Ashworth Lane Bolton BL1 8RR

Granted Bolton 18497/24 Full Planning Permission

Works: Loft or dormer

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

PROPOSED LOFT CONVERSION, FORMATION OF FLAT ROOF DORMER TO REAR OF PROPERTY. PROPOSALS INCLUDE FORMATION OF TWO GABLES EITHER SIDE TO MATCH ADJACENT PROPERTIES, FRONT PROJECTION WITH HIP TO REMAIN

As published by the council, reference 18497/24

Application record

Reference
18497/24
Type
Full Planning Permission
Status
Decided
Decision
Approve subject to conditions
Received
26 Jun 2024
Validated
15 Jul 2024
Decided
13 Sep 2024
Ward
Astley Bridge
Decision by
Delegated Decision
Postcode
BL1 8RR

Timeline

Dates from the published record

  1. 26 Jun 2024

    Received by Bolton

  2. 15 Jul 2024

    Validated

    Checked as complete and ready for consideration.

  3. 13 Sep 2024

    Decision issued: Approve subject to conditions

  4. 24 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, a design practice registered in Bolton

10 applications on PlanIndex · across 4 councils

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 152 Ashworth Lane Bolton BL1 8RR

    19053/24 Submitted 30 Sep 2024 55m away

    ERECTION OF A SINGLE STOREY REAR EXTENSION AND RAISED PATIO AT REAR.

    Granted Householder Extension 7 docs
    Small domestic
  • 234 Ashworth Lane Bolton BL1 8RX

    11179/21 Submitted 28 Apr 2021 104m away

    LISTED BUILDING CONSENT FOR REPLACEMENT OF WINDOWS TO REAR ELEVATION

    Granted Heritage and listed buildings Windows or glazing 7 docs
  • 119 Hill Cot Road Bolton BL1 8RW

    19001/24 Submitted 23 Sep 2024 107m away

    ERECTION OF A SINGLE STOREY REAR EXTENSION AND FIRST FLOOR REAR EXTENSION.

    Granted Householder Extension 4 docs
    Small domestic
  • 23 Parkgate Drive Bolton BL1 8SD

    11440/21 Submitted 7 Jun 2021 165m away

    DEMOLISHING OF EXISTING GARAGE TOGETHER WITH ERECTION OF A SINGLE STOREY SIDE EXTENSION AND FRONT AND REAR DORMER ALONG WITH FRONT PORCH.

    Granted Full applications Extension Loft or dormer 8 docs
    Small domestic
  • 253 Ashworth Lane Bolton BL1 8RX

    00127/26 Submitted 26 Jan 2026 194m away

    LISTED BUILDING CONSENT FOR INTERNAL ALTERATIONS, INSTALLATION OF ROOF WINDOWS AND ALTERATION TO EXISTING FENESTRATION

    Granted Heritage and listed buildings Windows or glazing 6 docs
  • 30 Parkgate Drive Bolton BL1 8SD

    15451/23 Submitted 11 Feb 2023 207m away

    INSTALLATION OF NEW ROOF DORMERS TO FRONT AND REAR TOGETHER WITH DEMOLITION OF EXISTING CONSERVATORY TO REAR AND ERECTION OF SINGLE STOREY EXTENSION TO REAR.

    Granted Full applications Extension Loft or dormer +2 6 docs
    Small domestic

In Bolton

  • 00365/26 Refused

    73 Kermoor Avenue Bolton BL1 7HW

    ERECTION OF 1NO. DETACHED DWELLING AND ASSOCIATED WORKS

    27 Feb 2026 Full applications
  • 21080/25 Granted

    J Dickinson And Sons Ltd Station Road Bolton BL6 5JE

    VARIATION OF CONDITIONS 1 AND 2 ON APPLICATION 16907/23 ALLOW FOR 24 HOUR OPERATIONS WITHIN UNITS 8 AND OPERATIONS UNTIL 11PM IN UNITS 9/10/11 (WASTE TRANSFER STATION) INCLUDING USE OF INTERNAL PLANT AND MACHINERY THROUGHOUT MONDAY TO SUNDAY AND INCLUDING BANK HOLIDAYS.

    22 Sep 2025 Full applications
  • 00820/26 Refused

    9 Tonge Fold Road Bolton BL2 6AW

    DEMOLITION OF EXISTING DWELLING AND ERECTION OF 6 NO. DWELLINGS TOGETHER WITH ASSOCIATED CAR PARKING

    7 May 2026 Full applications
  • 00394/26 Granted

    Rock Hall Moses Gate Country Park Hall Lane Farnworth BL4 7QE

    CHANGE OF USE OF GRADE II LISTED BUILDING TO CAFÉ WITH EXHIBITION, EVENTS, WORKSHOP AND OFFICE SPACES TOGETHER WITH DEMOLITION OF EXISTING TWO STOREY REAR EXTENSION AND ERECTION OF NEW THREE STOREY REAR EXTENSION WITH ROOF TERRACE AND BASEMENT, LANDSCAPING WORKS AND ASSOCIATED RESTORATION WORKS TO BUILDING INCLUDING INSTALLATION OF FRONT DOOR, TIMBER SASH WINDOWS AND HEAT PUMP SYSTEM

    4 Mar 2026 Full applications
  • 00252/26 Granted

    Albert Road Car Sales 113 Albert Road Bolton BL4 9EA

    DEMOLITION OF 2NO. EXISTING SINGLE STOREY BUILDINGS TOGETHER WITH THE ERECTION OF A CAR SHOWROOM WITH ANCILLARY OFFICES AND VALETING BAY

    13 Feb 2026 Full applications